Silver North Extends Main Fault Silver Mineralization an Additional 50 metres Along Strike at the Haldane Silver Property, Keno District, Yukon

Silver North Extends Main Fault Silver Mineralization an Additional 50 metres Along Strike at the Haldane Silver Property, Keno District, Yukon

(TheNewswire)

• Intersects 231 g/t silver, 0.24 g/t gold, 0.54% lead and 0.39 % zinc over 14.40 m from 170.60 m to 185.00 m in HLD25-35 including 1.25 m averaging 1,261 g/t silver, 0.74 g/t gold, 0.35% lead and 0.41% zinc.

• Results received from two of four remaining holes at the Main Fault target.

• With five holes reported, Main Fault extended to a total of 100 metres on strike and 150 m downdip in drilling and 300 m downdip from surface.

Vancouver, BC, December 10, 2025 TheNewswire Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) " Silver North " or the " Company ") announces that the Company has received results from an additional two holes completed during the 2025 exploration program at its flagship Haldane Silver Property in the historic Keno Hill Silver District, Yukon. Holes HLD25-34 and 35 were drilled to intersect Main Fault mineralization approximately 50 m to the southwest of the discovery section (HLD24-29 and -30, HLD 25- 31 see news release dated November 17, 2025), successfully extending the Main Fault in this direction. The Main Fault has been intersected in drilling over 100 metres in strike dimension and approximately 150 metres downdip (over 300 metres downdip from surface mineralization. Results include 1.25 metres averaging 1,261 gt silver, 0.74 gt gold, 0.35% lead and 0.41% zinc starting at 179.5 m, within a larger 14.4 metre intersection of 231 gt silver, 0.24 gt gold, 0.54% lead and 0.39% zinc starting at 170.6 m in HLD25-35 . To date, five of eight holes (totaling 1,759.5 metres) completed in the 2025 program have now been reported. The road-accessible 8,579 hectare Haldane Property is located 25 km west of Keno City, YT, adjacent to Hecla Mining's producing Keno Hill Silver Mine property, and hosts numerous occurrences of silver-lead-zinc-bearing quartz siderite veins as seen elsewhere in the district.

"The Main Fault continues to produce significant silver intersections at Haldane." stated Jason Weber, P.Geo., President and CEO of Silver North. "The results of these holes mirror the initial holes on the 2024 discovery section with grades and widths becoming stronger as we tested downdip, as seen with our exceptional results in our first hole of this program (HLD25-31 – see news release dated November 17, 2025). I am looking forward to receiving the final set of assays from our 2025 program and embarking on the interrogation of all of our data with our technical team to determine controls and orientations of potential wider and higher grade plunge directions to silver bearing mineralization for an aggressive 2026 drill program at Haldane."

HLD25-34 returned 13.60 m (from 157.50 m to 171.10 m) averaging 146 g/t silver, 0.15 g/t gold, 2.34 % lead and 1.24 % zinc over the entire structural zone that defines the Main Fault in this location. The upper two thirds of the intersection is intensely oxidized siderite vein and vein breccia material while the remaining third consists of siderite vein and stockwork mineralization with galena and sphalerite. The 13.60 m wide intersection includes a higher grade interval from 159.0 m to 168.20 m (9.20 m) of 196 g/t silver, 0.19 g/t gold, 3.22 % lead and 0.76 % zinc that includes a high grade intersection from 165.80 m to 167.00 m (1.20 m) that averages 467 g/t silver, 0.21 g/t gold, 12.07 % lead and 1.34 % zinc.

Hole HLD25-35 drilled on the same section and approximately 50 m downdip from HLD25-34 also intersected the Main Fault from 170.60 m - 198.50 m where the entire structural zone returned 27.90 m averaging 153 g/t silver, 0.18 g/t gold, 0.47 % lead and 0.75 % zinc. In HLD25-35, the Main Fault splits into two splays defined by an upper moderately oxidized siderite vein and vein breccia zone that is 14.40 m wide from 170.60 m to 185.00 m that returned 231 g/t silver, 0.24 g/t gold, 0.54 % lead and 0.39 % zinc including two high grade silver bearing zones including 1.25 m from 179.50 m to 180.75 m that averages 1,261 g/t silver, 0.74 g/t gold, 0.35 % lead and 0.41 % zinc. The low concentration of lead in this intersection suggests the presence of significant silver bearing sulphosalts that were not observable in the partially oxidized material. The lower splay consists of unoxidized galena and sphalerite bearing siderite vein breccia material that is 6.35 m wide from 189.80 m to 196.15 m and returned 55 g/t silver, 0.08 g/t gold, 0.27 % lead and 0.80 % zinc. A higher grade silver bearing section 0.80 m wide from 191.40 m to 192.20 m averages 642 g/t silver, 0.30 g/t gold, 3.38 % lead and 4.57 % zinc. The two splays of the Main fault are separated by 4.80 m of weakly mineralized quartzite and graphitic phyllite fault gouge material.

Table 1: 2025 Drilling – Significant Results

Hole

From (m)

To (m)

Interval (m)

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Silver Eq 1

HLD25-34

157.50

171.10

13.60

146

0.15

2.34

1.24

204

incl

159.00

168.20

9.20

196

0.19

3.22

0.76

260

and incl

165.80

167.00

1.20

467

0.21

12.07

1.34

672

HLD25-35

170.60

198.50

27.90

153

0.18

0.47

0.75

172

incl

170.60

185.00

14.40

231

0.24

0.54

0.39

243

and incl

174.15

175.00

0.85

425

0.15

2.24

0.55

447

and incl

179.50

180.75

1.25

1261

0.74

0.35

0.41

1217

incl

189.80

196.15

6.35

55

0.08

0.27

0.80

73

and incl

191.40

192.20

0.80

642

0.30

3.38

4.57

742

1 Silver-equivalent values are calculated assuming typical recoveries based on metallurgical studies conducted on a range of analogous vein deposits and are not necessarily reflective of metallurgy on the property. No metallurgical work has been reported on the property. The recoveries used are 92% silver, 70% gold, 88% lead and 70% zinc. The silver – equivalent formula: using the formula: ((35 * silver (g/t)*0.92 / 31.1035) + (3000 * gold (g/t)*0.70 / 31.1035) + (1.00 * 2204 * lead %*0.88/100) + (1.20 * 2204 * zinc %*0.70/100)) *(31.1035 / 35). Metal price assumptions are US$35/oz silver, US$3,000/oz gold, US$1.00/lb lead and US$1.20/lb zinc. True widths are unknown.

Table 2: 2025 Drilling – Collar Location Data (NAD83, UTM Zone 8)

Hole

Depth (m)

Easting (m)

Northing (m)

Elevation (m)

Azimuth

Dip

HLD25-31

282.9

456776

7082990

1265

104

-86

HLD25-32

189.0

456825

7083060

1281

130

-68

HLD25-33

208.4

456776

7082990

1265

63

-67

HLD25-34

203.0

456757

7082951

1268

105

-54

HLD25-35

207.0

456757

7082951

1268

105

-71

HLD25-36

210.0

456757

7082951

1268

63

-55

HLD25-37

171.0

456729

7082904

1263

104

-62

HLD25-38

220.3

456776

7082990

1265

125

-74

The Company is now waiting for the analytical results from two remaining holes completed in the 2025 program.

Figure 1: Drill Hole Plan Map


Click Image To View Full Size

Figure 2: Cross Section F-F'

Quality Assurance / Quality Control and Sampling Procedures

All diamond drill core from the 2025 program at the Haldane project was logged, photographed, and sawn in half using a diamond blade core saw. One half of the core was submitted for geochemical analysis, while the other half was retained in secure storage for reference. Sampling intervals were determined based on geological boundaries and typically ranged from 0.3- 1.5 metres. Control samples comprised approximately 20% of all samples submitted, including certified reference standards, analytical blanks, field duplicates, preparation duplicates and analytical duplicates. QA/QC results were reviewed in real time, and all data have been verified as meeting acceptable thresholds for accuracy, precision, and contamination before inclusion in this release.

During the field program, all samples were secured on site and delivered to ALS Minerals in Whitehorse, Yukon. All samples were prepared at ALS Minerals in Whitehorse before being transported to the ALS laboratory (an independent ISO/IEC 17025 certified laboratory) in North Vancouver, British Columbia for analysis.

Samples are dried, weighed, and crushed to at least 70% passing 2mm, and a 250 g split is pulverized to at least 85% passing 75 μm (PREP-31). All samples are analyzed using a four-acid digestion and ICP-MS methods (ME-ICP61 and ME-MS61). Over-limit analyses for silver (>100 ppm), lead (>10,000 ppm), and zinc (>10,000 ppm) are re-assayed using an ore-grade four-acid digestion and ICP-AES (ME-OG62). Samples with over-limit silver assays > 1500 ppm are analyzed by 30-gram fire assay with a gravimetric finish (Ag-GRA21). Gold is assayed by 30-gram fire assay and AAS (Au-AA23).

About Silver North Resources Ltd.

Silver North's primary assets are its 100% owned Haldane S ilver P roject (next to Hecla Mining Inc.'s Keno Hill Mine project), the Tim Silver Project (under option to Coeur Mining, Inc. in the Silvertip/Midway District, BC and Yukon) and the GDR project also in the Silvertip/Midway district. Silver North also plans to acquire additional silver properties in favourable jurisdictions.

The Company is listed on the TSX Venture Exchange under the symbol "SNAG", trades on the OTCQB market in the United States under the symbol "TARSF", and under the symbol "I90" on the Frankfurt Stock Exchange.

Mr. Jason Weber, P.Geo., President and CEO of Silver North Resources Ltd. is a Qualified Person as defined by National Instrument 43-101. Mr. Weber supervised the preparation of the technical information contained in this release and approved the news release.

For further information, contact:

Jason Weber, President and CEO

Sandrine Lam, Shareholder Communications

Tel: (604) 807- 7217

Fax: (888) 889-4874

To learn more visit: www.silvernorthres.com

X: https://X.com/SilverNorthRes

LinkedIn:

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. STATEMENTS IN THIS NEWS RELEASE, OTHER THAN PURELY HISTORICAL INFORMATION, INCLUDING STATEMENTS RELATING TO THE COMPANY'S FUTURE PLANS AND OBJECTIVES OR EXPECTED RESULTS, MAY INCLUDE FORWARD-LOOKING STATEMENTS. FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS AND ARE SUBJECT TO ALL OF THE RISKS AND UNCERTAINTIES INHERENT IN RESOURCE EXPLORATION AND DEVELOPMENT. AS A RESULT, ACTUAL RESULTS MAY VARY MATERIALLY FROM THOSE DESCRIBED IN THE FORWARD- LOOKING STATEMENTS.

Copyright (c) 2025 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

SNAG:CC
The Conversation (0)
Silver North (TSXV:SNAG)

Silver North Resources

Next Generation Silver Discoveries

Next Generation Silver Discoveries Keep Reading...
Silver North Commences Drilling at Haldane Property

Silver North Commences Drilling at Haldane Property

(TheNewswire) Drilling to test high-grade silver targets at the West Fault, Main Fault and Bighorn Vancouver, BC, September 10, 2024 TheNewswire Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) " Silver North " or the " Company ") is pleased to announce that the 2024 drilling campaign has... Keep Reading...
Tim Drilling Program Completed; Crews Mobilizing to Haldane Project

Tim Drilling Program Completed; Crews Mobilizing to Haldane Project

(TheNewswire) Drilling indicates the presence of a Carbonate Replacement ("CRD") style system at Tim 2,252 metres drilled in six holes Drill is currently moving from Tim to the Haldane Property Vancouver, BC TheNewswire - September 4, 2024 Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF)... Keep Reading...
Silver North to Commence Haldane Drilling

Silver North to Commence Haldane Drilling

(TheNewswire) Vancouver, BC, August 27, 2024 TheNewswire Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) " Silver North " or the " Company ") is pleased to provide an update on 2024 Yukon exploration activities at the wholly owned Haldane Property in the historic Keno Hill Silver... Keep Reading...
Silver North Provides Tim Drilling Progress Update

Silver North Provides Tim Drilling Progress Update

(TheNewswire) Drilling indicates the presence of a Carbonate Replacement ("CRD") style system at Tim Program Expanded to include airborne geophysical surveys Over 1,300 m of planned 2,000 m of drilling completed to date Management recently completed site visit Vancouver, BC, August 19, 2 024 –... Keep Reading...
Silver North Announces Closing of Final Tranche of Private Placement

Silver North Announces Closing of Final Tranche of Private Placement

(TheNewswire) Vancouver, BC, July 18, 2024 TheNewswire Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) " Silver North " or the " Company ") is pleased to announce that it has closed the third and final tranche (the " Final Tranche ") of its non-brokered private placement (the " Offering... Keep Reading...
Providence Gold Mines Inc. La Dama de Oro Gold & Financing Update

Providence Gold Mines Inc. La Dama de Oro Gold & Financing Update

(TheNewswire) VANCOUVER, January 9, 2026 TheNewswire - Providence Gold Mines Inc. (TSX-V: PHD) ("Providence" or the "Company") The Company wishes that all our shareholders have had a wonderful Holiday Season and prosperity for the New Year. With the holiday season ending, the Company is pleased... Keep Reading...
55 North Mining Secures 100% Ownership of the Last Hope Gold Project

55 North Mining Secures 100% Ownership of the Last Hope Gold Project

TORONTO, ON / ACCESS Newswire / January 7, 2026 / 55 North Mining Inc. (CSE:FFF,OTC:FFFNF)(FSE:6YF) ("55 North" or the "Company") is pleased to announce that it has completed the required property payment on its Last Hope Gold Project (the "Project"), resulting in 55 North now owning 100% of the... Keep Reading...
New Found Gold Celebrates Milestone Year: Transformation to an Emerging Canadian Gold Producer

New Found Gold Celebrates Milestone Year: Transformation to an Emerging Canadian Gold Producer

New Found Gold Corp. (TSXV: NFG) (NYSE American: NFGC) ("New Found Gold" or the "Company") is pleased to highlight a transformational 2025 in which the Company has evolved from an early-stage exploration company to an emerging Canadian gold producer with a multi-asset portfolio focused on a... Keep Reading...
Heliostar Achieves Full-Year 2025 Production Guidance and Grows Cash to $41M

Heliostar Achieves Full-Year 2025 Production Guidance and Grows Cash to $41M

HIGHLIGHTS: 2025 Production of 34,098 GEOs (32,990 gold ounces and 80,527 silver ounces) Cash balance of US$41M as of December 31, 2025 Heliostar Metals Ltd. (TSXV: HSTR,OTC:HSTXF) (OTCQX: HSTXF) (FSE: RGG1) ("Heliostar" or the "Company") is pleased to announce that it produced 8,459 Gold... Keep Reading...
LAURION Intersects High-Grade Gold, Silver and Zinc at Ishkoday A-Zone/McLeod/CRK Zone, Confirming Structural Continuity Along Mineralized Corridor

LAURION Intersects High-Grade Gold, Silver and Zinc at Ishkoday A-Zone/McLeod/CRK Zone, Confirming Structural Continuity Along Mineralized Corridor

(TheNewswire) Anchors to: Drill hole LBX25-095 3.50 m@ 1.40 g/t Au and 2.30% Zn (162.50 m to 166.00 m) including: 0.70 m @ 5.97 g/t Au,18.4 g/t Ag and 10.8% Zn. 4.50 m@ 2.00 g/t Au, 5.75 g/t Ag and 1.22% Zn(188.00 m to 192.50 m), including: 0.50 m @ 3.30 g/t Au,17.8 g/t Ag and 6.84% Zn (188.00 m... Keep Reading...
Imminent Gold Production and Cashflow from White Dam Project

Imminent Gold Production and Cashflow from White Dam Project

Pacgold (PGO:AU) has announced Imminent Gold Production and Cashflow from White Dam ProjectDownload the PDF here. Keep Reading...

Interactive Chart

Latest Press Releases

Related News