Valor Resources

Quarterly Activities/Appendix 5B Cash Flow Report April 28, 2023

Outstanding exploration results confirm the world- class pedigree of Valor’ s uranium assets in Canada and copper- silver assets in Peru, withprocess underway to crystallise value f rom this outstanding portfolio

Valor Resources Limited (Valor) or (the Company) (ASX: VAL) is pleased to present its Quarterly Report and Cash Flow Report.


HIGHLIGHTS

CANADIAN URANIUM – ATHABASCA BASIN:

  • Four priority targets identified at the Cluff Lake Uranium Proje ct:
    • Two of the targets at the Moose Lake Prospect prioritised for drilling.
    • High-grade rare earth results of up to 9.15% TREO returned from sampling of historic trenches at Moose Lake.
  • Three significa nt copper targets identified following a review of historical exploration data on new mineral cla ims at the Surprise Creek Project:
    • Bob Lake – historical drilling results of up to 9m @ 2.07% Cu and 27.3g/t Ag from surface and 2.5m @ 5.58% Cu and 17.43g/t Ag from 6.1m.
    • Ellis Bay (Zone 25) – historical drilling results of up to 6.6m @ 1.31% Cu from 11m and 4m @ 0.60% Cu from 8m.
    • Waterloo – historical channel sampling of trenches with results of up to 1.39% Cu over 4.5m and 2.41% Cu over 3m.
  • Drill permit applications submitted at the Hidde n Bay Uranium Project, located just 20km south-southwest of the historic Rabbit Lake Mine (Cameco), which produced 203Mlbs of uranium concentrate over 41 years:
    • Drill targets at Hidden Bay comprise radon-in-soil anomalies which are partly coincident with gravity anomalies.
    • Targets located close to the Athabasca unconformity, with potential for both basement-hosted and Athabasca sandstone-hosted uranium deposits.

PERUVIAN COPPER:

  • Peruvian Ministry of Energy and Mines approves the DIA – “Declaracion de Impacto Ambiental” (Environmental Impact Statement for Exploration), allowing for up to 120 holes to be drilled within the approved Effective Area at the Picha Copper Project
  • Ongoing fieldwork and geochemical surface sampling at Picha highlights new targets at Cuti and Fundicion South and enhances existing targets at Ichucollo, Maricate and Cumbre Coya.
  • Fieldwork continuing at the Charaque Project with project-wide geochemical soil sampling program currently underway.

CORPORATE:

  • Process underway to maximise the value of the Peruvian asset portfolio through a corporate restructure/transaction.

Figure 1: Athabasca Basin Projects

CLUFF LAKE URANIUM PROJECT

Several priority drill targets have been defined at the Cluff Lake Uranium Project following the interpretation of airborne gravity gradiometry (AGG) and magnetic data acquired by the Company in June 2022, re-processing of historical airborne EM data (MEGATEM) and initial reconnaissance fieldwork. Details of the targets were reported in the ASX announcement dated 8th February 2023 titled “Final priority drill targets selected for Cluff Lake Uranium Project field season”.


Click here for the full ASX Release

This article includes content from Valor Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

VAL:AU
The Conversation (0)
Investment establishes valuation of C$50M for the polymetallic Häggån project

Investment establishes valuation of C$50M for the polymetallic Häggån project

Aura Energy Limited (ASX: AEE, AIM: AURA) (“Aura” or “the Company”) is pleased to announce that MMCAP International Inc. SPC (‘MMCAP’) and certain other strategic investors (together the ‘Strategic Investors’) will provide funding of C$10 million for a 19.7% interest in the Company’s... Keep Reading...
Close-up of Kazakhstan flag with sun and eagle design on blue fabric.

Laramide Exits Kazakhstan Uranium Project After Government Policy Shifts

Laramide Resources (TSX:LAM,OTCQX:LMRXF) has pulled out of a greenfield uranium exploration venture in Kazakhstan, citing policy changes that it says have effectively shut the door on economically viable foreign investment in the country’s uranium sector.The Toronto-based company announced on... Keep Reading...
Resource Expansion Drilling Confirms 3,000 metres of New Uranium Trends with Best Drill Hole of 1.4 GT over 7.6 metres

Resource Expansion Drilling Confirms 3,000 metres of New Uranium Trends with Best Drill Hole of 1.4 GT over 7.6 metres

Resource expansion drilling of 50 holes completed at Lo Herma as planned yielding significant mineralised extensions over 3km to the north of proposed Mine Units 1 and 2. Drilling delivered AMU’s strongest intercept to date ahead of 2026 MRE and Scoping Study updates at AMU’s flagship Lo Herma ISR Uranium Project in Wyoming’s Powder River Basin.

American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to advise that 2025 resource expansion drilling at its Lo Herma ISR uranium project in Wyoming’s Powder River Basin (Lo Herma, the Project) has been completed according to plan with the drilling of 50... Keep Reading...
Completes phase one drilling and expands Sybella-Barkly

Completes phase one drilling and expands Sybella-Barkly

Basin Energy (BSN:AU) has announced Completes phase one drilling and expands Sybella-BarklyDownload the PDF here. Keep Reading...

Interactive Chart

Latest Press Releases

Related News