copper

Unkur Copper-Silver Project Update

AZARGA METALS CORP. ("Azarga Metals" or the "Company") (TSXV:AZR) is pleased to announce that the Preliminary Economic Assessment ("PEA"), incorporating an updated Mineral Resource estimate for Azarga Metals 100% owned Unkur Copper-Silver Project in Eastern Russia being completed by consultants Wardell Armstrong International ("WAI") continues to progress

The PEA study will now consider various operating scenarios at Unkur including a low capital and operating cost heap-leaching scenario. Because of this WAI recommended additional metallurgical test work with the aim of demonstrating lower reagent consumption for Unkur ore in the leach cycle. This took time to initiate and complete. However, the tests are scheduled to complete in the next 2-3 weeks and the PEA incorporating these results should be available in the coming 6-8 weeks.

Michael Hopley, President and CEO commented: "Heap-leaching to extract both the copper and silver at Unkur is an important option to consider because it creates the potential for lower capital expenditure and a shorter timeline to production. As such, the results of the additional metallurgical test work are essential to the outcome of the PEA."

Azarga Metals is also currently planning a physical exploration program in the eastern part of the Unkur Copper-Silver Project ("Unkur East") to start in August 2021. As reported on January 19 this year, results of a reconnaissance geochemical program confirmed the presence of extensive copper and silver mineralization at Unkur East, likely representing an eastern limb of the Unkur syncline. Unkur East remains relatively under-explored and the exploration program planned for later this year proposes to drill the area for the first time.

Qualified Person

Azarga Metals' President and CEO Michael Hopley, a Qualified Person as defined by NI 43-101, verified the data disclosed and has reviewed and approved the disclosure contained in this Press Release.

About Azarga Metals Corp.

Azarga Metals is a mineral exploration and development company that owns 100% of the Unkur Copper-Silver Project in the Zabaikalsky administrative region in eastern Russia. On completion of a first phase physical exploration program in 2016-2018, the Company estimated an Inferred Resource of 62 million tonnes at 0.53% copper and 38.6g/t silver for the project in the report entitled "Technical Report and Preliminary Economic Assessment for the Unkur Copper-Silver Project, Kodar-Udokan, Russian Federation" dated effective 30, August 2018 authored by Tetra Tech Mining & Minerals.

AZARGA METALS CORP.

"Michael Hopley"

Michael Hopley,
President and Chief Executive Officer

For further information please contact: Doris Meyer, at +1 604 536-2711 ext. 6, visit www.azargametals.com or follow us on Twitter @AzargaMetals. The address of the head office of Azarga Metals is Unit 1 - 15782 Marine Drive, White Rock, BC V4B 1E6, British Columbia, Canada.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement:

This news release contains forward-looking statements that are based on the Corporation's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current planned exploration activities; conclusions of economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in mineralization grade or recovery rates; accidents, labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not a guarantee of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

SOURCE: Azarga Metals Corp.



View source version on accesswire.com:
https://www.accesswire.com/639769/Unkur-Copper-Silver-Project-Update

News Provided by ACCESSWIRE via QuoteMedia

The Conversation (0)
Azarga Metals

Azarga Metals

Exploring and Developing High-Quality Copper-Silver Projects in Russia

Exploring and Developing High-Quality Copper-Silver Projects in Russia Keep Reading...
Keep reading...Show less
Colorful mineral rocks with "5 Top Canadian Mining Stocks This Week" text.

Top 5 Canadian Mining Stocks This Week: Torr Metals Gains 53 Percent

Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian news impacting the resource sector.Statistics Canada released its July consumer price index (CPI) data on Monday (August 17). The... Keep Reading...
Close-up of raw copper nuggets with a shiny, metallic surface.

BHP, SiTration Launch Arizona Copper Recovery Pilot Program

BHP (ASX:BHP,NYSE:BHP,LSE:BHP) and MIT spin-out SiTration announced the launch of a pilot program in Arizona to extract copper from legacy mining wastewater.SiTration’s process previously demonstrated the ability to yield London Metal Exchange (LME) Grade A copper in bench-scale testing without... Keep Reading...
Clem Chambers, gold bars.

Clem Chambers: Copper, Platinum to Surge, Plus When I'll Buy Gold Again

Clem Chambers, CEO of aNewFN.com, shares his latest thoughts on gold and silver, including the price levels where he would be a buyer again. For now, he's more interested in platinum, where he's identified a stock he likes, and copper. "I am in copper and I am long, and it's done really well.... Keep Reading...
Close-up of a map highlighting the Philippines with text reading: Philippines, Mindoro Island, Panay Island, Samar Island, Cebu.

Philippines' US$200 Billion Tampakan Copper Mine Moves Closer to Reality After Decades of Delay

Dominion Holdings (PSE:DHI), backed by the billionaire Sy and Consunji families, is executing a three-way merger to absorb control of the Tampakan copper-gold project, positioning itself to become the largest listed mining company in the Philippines.To facilitate the transaction and future... Keep Reading...
Five bronze cylinders of varying heights stand on a reflective surface against an orange background.

Lundin Cuts Copper Target After Another Storm Hits Chile

Lundin Mining (TSX:LUN,OTCPL:LUNMF) lowered its full-year copper production guidance after a second winter storm in Chile's Atacama region damaged infrastructure and disrupted operations at the Caserones mine.Severe weather re-damaged a transmission tower serving Caserones that repair crews had... Keep Reading...
Advanced quantum computer hardware with complex copper wiring and futuristic design.

Wired in Metal: AI and the Changing Copper Cycle

The world is witnessing the start of a new copper supercycle.Copper supply and demand have long been dependent on electricity and industrial sectors, with the previous mining cycle cemented by infrastructure projects, manufacturing expansion and rapid city growth. The growing focus on generative... Keep Reading...

Interactive Chart

Latest Press Releases

Related News