Base Metals

Northern Lights Resources Corp. is pleased to announce an update to the ongoing core drilling program at the Tin Cup Prospect on the Company' 100% owned Secret Pass Gold Project in Mohave County, Arizona Drilling has been completed on two drill holes, TC21-02 and TC21-03 . Drilling is continuing on the third hole, currently at a depth of approximately 80 metres. The initial drill program of four holes at the Tin Cup ...

Northern Lights Resources Corp. ("Northern Lights" or the "Company") (CSE:NLR)(OTCQB:NLRCF) is pleased to announce an update to the ongoing core drilling program at the Tin Cup Prospect on the Company' 100% owned Secret Pass Gold Project in Mohave County, Arizona

Drilling has been completed on two drill holes, TC21-02 (175 metre total depth) and TC21-03 (230 metre total depth). Drilling is continuing on the third hole, (TS21-04) currently at a depth of approximately 80 metres. The initial drill program of four holes at the Tin Cup prospect is expected to be completed in early December.

CEO, Jason Bahnsen, commented "Our initial 4-hole drill program at Tin Cup is going well and is expected to be completed in early December. Initial drill results are encouraging with strong mineralization evident in the drill core received to date. We have now dispatched the first hole to the assay lab and will release the results when received in early 2022."

The drill holes completed to date (TC21-02 and TC21-03) intercepted zones of moderate to strong mineralization within the altered andesite and rhyolite dikes. The mineralization of fracture fill and disseminated pyrite occurs within sections of moderate to strong hematite and propylitic alteration with weak to moderate sericite and silicification. Brecciated and gouge filled fault zones were encountered in both drill holes with disseminated pyrite present. Gold mineralization at the Tin Cup is primarily associated with the northwest trending structures and splays, predominantly in the andesite and margins of the rhyolite dikes.

The core samples from the first drill hole (TS21-02) have been sent to Skyline Laboratories in Tucson Arizona for assay.

Seven exploration drill holes have been approved at the Tin Cup Prospect (total 1,350 metres planned), see Table 1. Initially, 4 drill holes out of the permitted holes will be drilled (TC21-02, TC21-03, TC21-04, TC21-06), targeting the confirmation of historic high-grade mineralization that was identified by historic reverse circulation (RC) drilling in the 1980s.

Table 1 - Planned Drill Holes at Tin Cup Prospect

Hole No.

Location

Azimuth (o)

Dip (o)

Length (m)

TC21-02

Tin Cup

220

-45

175

TC21-03

Tin Cup

220

-55

225

TC21-04

Tin Cup

310

-50

250

TC21-05

Tin Cup

220

-65

400

TC21-06

Tin Cup

040

-60

100

TC21-07

Tin Cup

180

-45

100

TC21-08

Tin Cup

100

Total

1,350

Figure 1 - Drilling at TC21-02

Competent Persons Statement

Information in this report relating to Exploration Results is based on information reviewed by Mr. Lee R. Beasley, a Certified Professional Geologist who is a Member of the American Institute of Professional Geologists, and a consultant to Northern Lights Resources. Mr. Beasley has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Qualified Person for the purposes of NI43-101 Standards of Disclosure for Mineral Projects. Mr. Beasley consents to the inclusion of the data in the form and context in which it appears.

For further information, please contact:

Albert Timcke, Executive Chairman and President
Email: rtimcke@northernlightsresources.com
Tel: +1 604 608 6163

Jason Bahnsen, Chief Executive Officer
Email: Jason@northernlightsresources.com
Tel: +1 604 608 6163

Shawn Balaghi, Investor Relations
Email: shawn@northernlightsresources.com
Tel: +1 604 773 0242

About Northern Lights Resources Corp.

Northern Lights Resources Corp is a growth-oriented exploration and development company that is advancing two projects: The 100% owned, Secret Pass Gold Project located in Arizona; and the Medicine Springs silver-zinc-lead Project located in Elko County Nevada where Northern Lights, in joint venture with Reyna Silver are earning 100% ownership. Northern Lights Resources is a member of the Arizona Mining Association.

Northern Lights Resources trades under the ticker of "NLR" on the CSE and "NLRCF" on the OTCQB. This and other Northern Lights Resources news releases can be viewed at www.sedar.com and www.northernlightsresources.com.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to: the terms and conditions of the proposed private placement; use of funds; the business and operations of the Company after the proposed closing of the Offering. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: general business, economic, competitive, political and social uncertainties; delay or failure to receive board, shareholder or regulatory approvals; and the uncertainties surrounding the mineral exploration industry. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

SOURCE: Northern Lights Resources Corp.



View source version on accesswire.com:
https://www.accesswire.com/676111/Tin-Cup-Drilling-Update

News Provided by ACCESSWIRE via QuoteMedia

Fortuna provides update on political events in Burkina Faso

Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) reports that its Yaramoko gold Mine located in Burkina Faso, its workforce and associated supply chains have not been affected by the current political situation and its operations continue as normal.

The Company continues to monitor the situation and will provide updates as and when required.

Keep reading... Show less

SILVERCORP INTERSECTS 1.35 METRES TRUE WIDTH GRADING 2,532 GRAMS PER TONNE SILVER AND 14.38% ZINC FROM VEIN S31 AT THE SGX MINE

Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX: SVM) (NYSE American: SVM) is pleased to report additional high-grade intercepts from its 2021 exploration program at the SGX mine. Extensive exploration drilling and tunneling are ongoing at the SGX mine and all other mines in the Ying Mining District, Henan Province China .

Keep reading... Show less
Thunderstruck grants options to buy 1.4M shares

Thunderstruck grants options to buy 1.4M shares

Thunderstruck Resources Ltd. (The "Company") wishes to announce that the board of directors has granted 1,400,000 options at an exercise price of $.065, for a period of five years, to directors, officers, employees and consultants.

About Thunderstruck Resources

Keep reading... Show less

Endeavour Silver - Standing on the Bridge to a More Exciting Outlook

Full year production results and 2022 guidance. Compared to 2020, silver, and gold production in 2021 increased 38.6% and 13.8% to 4,870,787 ounces and 42,262 ounces, respectively. Strong full year operational performance was due, in part, to higher throughput and grades at the Guanacevi mine. At year-end, Endeavour held 1,028,340 ounces of silver and 1,044 ounces of gold bullion and 54,270 ounces of silver and 2,630 ounces of gold in concentrate inventory. In 2022, silver production is expected to range from 4.2 million to 4.8 million ounces, while gold production is expected to range from 31,000 to 35,000 ounces. Updating production and earnings estimates. We are updating our 2021 and 2022 EPS estimates to $(0.01) and $0.14 from $0.02 and $0.15, respectively. Our 2021 EBITDA estimates are $37.9 million and $65.9 million compared to our prior estimates of $44.8 million and $67.2 million, respectively. Our 2022 estimates reflect lower production, partially offset by sales from inventory, and a higher share count to reflect equity issuance related to the recently announced Pitarrilla acquisition. Fourth quarter earnings date. EXK will release fourth quarter 2021 financial results before the market open on March 10, 2022, and management will host a conference call for investors on the same day at 1:00 pm ET. We anticipate discussion to center on sources of future growth, including Terronera, Pitarrilla, and Parral. With respect to Terronera, once financing is in place, the board will approve construction which is expected to take 24 months with commercial production expected in the first half of 2024. Rating is Market Perform. We remain impressed with how the company's intermediate and long-term growth pipeline is developing. We think near-term risk and reward is balanced given steady production levels in 2022 and 2023 and a relatively high operating cost profile which could improve when Terronera goes into commercial production. Read More >>

News Provided by Channelchek via QuoteMedia

Keep reading... Show less

Endeavour Silver Provides 2022 Guidance, Including Production of 4.2-4.8 Million oz Silver and 31,000-35,000 oz Gold for 6.7-7.6 Million oz Silver Equivalent¹

Endeavour Silver Corp. ("Endeavour" or the "Company") (NYSE: EXK; TSX: EDR) is pleased to announce its consolidated production and cost guidance as well as its capital and exploration budgets for 2022. All dollar amounts are in US dollars (US$).

2022 Production and Cost Guidance Highlights

Keep reading... Show less

Endeavour Silver Announces Filing of NI 43-101 Reports on Guanacevi and Bolanitos Projects

Endeavour Silver Corp. ("Endeavour" or the "Company") (TSX: EDR, NYSE: EXK) announces today that it filed two technical reports (the "Technical Reports") prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects.

The Technical Reports are titled "NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Guanaceví Project, Durango State, Mexico" and "NI 43-101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Bolañitos Project, Guanajuato State, Mexico". Both Technical Reports have an effective date of December 31, 2020 and support the disclosure made by the Company in its February 3, 2021 news release announcing the updated 2020 Mineral Reserve and Resource Estimates. There are no material differences in the Technical Reports from the information disclosed in the February 3, 2021 news release and the date of this filing.

Keep reading... Show less

Latest Press Releases

Related News

×