? Silvercorp Intersects Vein LM5 With 0.91 Metres True Width Grading 6,455 Grams Per Tonne Silver and 10 Grams Per Tonne Gold at the LME Mine, Ying Mining District, China

 
 

  Trading Symbol
 TSX: SVM
  NYSE American: SVM  

 

 Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX: SVM) (NYSE American: SVM) is pleased to report results from its 2021 exploration programs at the LME mine. Extensive exploration drilling and tunneling are ongoing at the LME mine, and all other mines at the Ying Mining District, Henan Province China .

 
 

  Silvercorp Metals Inc. Logo (CNW Group/Silvercorp Metals Inc) 

 
 

From October 1, 2020 to May 31, 2021 , 17,752 metres ("m") from a total of 113 diamond drill holes, including 98 underground holes and 15 surface holes, were completed at the LME mine.  Assay results for 102 holes have been received, with 52 holes intercepting mineralization. Currently, seven rigs are drilling at the LME mine.

 

  Drilling Intersects High-Grade Veins in and outside the Resource Areas  

 

The diamond drilling programs at the LME mine  targeted blocks of known silver-lead-zinc veins in the resource areas that were previously missed due to limited drilling or tunneling, changes in the strikes and dips, and/or pinch-swelling of the pay-zones in the veins.  Since access tunnels are already in place, any discovered high-grade blocks can quickly be converted to reserves and mined.

 

The high-grade intercepts for this period are associated with parallel veins LM5, LM5E, LM5E1, LM5E2, M5W, and LM5W2.  Other veins include LM4W, LM4W2, LM6 and its parallel veins LM6E, LM6E2, LM6W and LM6W1.

 

Step-out drilling at the LME mine also hit high-grade silver-lead-zinc mineralization, including veins LM61 and LM66 to the south and vein ML18E to the north. Hole ZKG20AT1704 confirmed that the north-south striking vein T17E at the TLP mine extended southward to the area between the TLP and LME mines. These discoveries confirm the potential of high-grade silver-lead mineralization extending beyond the defined resource area of the LME mine.

 

Highlights of high-grade intercepts of vein LM5, LM6 and their parallel veins at the LME mine:

 
  •   Hole   ZKL5202SC intersected a 0.92 m interval ( 0.91 m true width) of vein LM5 grading 6,455 grams per tonne ("g/t") silver ("Ag"), 5.28% lead ("Pb"), 1.19% zinc ("Zn"), 10.00 g/t gold ("Au"), and 0.29% copper ("Cu") at the 498 m elevation;
  •  
  •   Hole   ZKL51LM4E204 intersected a 0.76 m interval ( 0.68 m true width) of vein LM5E grading 1,538 g/t Ag, 5.65% Pb, 1.89% Zn, 0.73 g/t Au, and 0.38% Cu at the 573 m elevation;
  •  
  •   Hole   ZKL53LM4E208 intersected a 0.71 m interval ( 0.65 m true width) of vein LM5W2 grading 1,902 g/t Ag, 1.48% Pb, 0.32% Zn, 0.01 g/t Au, and 0.48% Cu at the 633 m elevation;
  •  
  •   Hole   ZKL5801SC intersected a 0.94 m interval ( 0.53 m true width) of vein LM6E2 grading 3,014 g/t Ag, 5.51% Pb, 0.39% Zn, 0.20 g/t Au, and 0.11% Cu at the 502 m elevation;
  •  
  •   Hole   ZKL53LM602 intersected a 0.65 m interval ( 0.64 m true width) of vein LM6W grading 1,596 g/t Ag, 2.06% Pb, 0.63% Zn, 0.05 g/t Au, and 0.27% Cu at the 680 m elevation; and
  •  
  •   Hole   ZKLDB1712 intersected a 1.14 m interval ( 1.08 m true width) of vein LM61 grading 13.70 g/t Au, 19 g/t Ag, 0.51% Pb, 0.08% Zn, and 0.01% Cu at the 681 m elevation.
  •  

  In-fill Drilling of Sub-Horizontal Gold Zone LM4E2  

 

During this period, 22 out of the 44 holes targeting the sub-horizontal gold structures of LM4E2 intersected gold mineralization (Table 1).

 
  •   Hole   ZKL55LM4E203 intersected a 1.16 m interval ( 0.93 m true width) of vein LM4E2 grading 5.43 g/t Au and 70 g/t Ag at the 581 m elevation.
  •  

  Table 1: Selected intercepts from the 2021 drill programs at the LME Mine  

 
 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    
 

   Hole ID   

 
 

   From
(m)
 
 

 
 

   To
(m)
 
 

 
 

   Elevation
(m)
 
 

 
 

   Interval
(m)
 
 

 
 

   True Width
(m)
 
 

 
 

   Ag
(g/t)
 
 

 
 

   Pb
(%)
 
 

 
 

   Zn
(%)
 
 

 
 

   Au
(g/t)
 
 

 
 

   Cu
( %)
 
 

 
 

   Vein   

 
 

   Ore Type   

 
 

  ZKG20AT1704  

 
 

  91.46  

 
 

  92.16  

 
 

  872  

 
 

  0.70  

 
 

  0.66  

 
 

  389  

 
 

  1.29  

 
 

  1.41  

 
 

  0.05  

 
 

  0.04  

 
 

  T17E  

 
 

  Ag-Pb  

 
 

  ZKL51ALM4E201  

 
 

  23.28  

 
 

  24.03  

 
 

  593  

 
 

  0.75  

 
 

  0.46  

 
 

  5  

 
 

  5.41  

 
 

  0.24  

 
 

  0.10  

 
 

  0.02  

 
 

  LM4W  

 
 

  Ag-Pb  

 
 

  ZKL51ALM4E202  

 
 

  35.07  

 
 

  36.32  

 
 

  620  

 
 

  1.25  

 
 

  0.88  

 
 

  490  

 
 

  0.94  

 
 

  0.59  

 
 

  0.01  

 
 

  0.06  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL51ALM4E204  

 
 

  23.19  

 
 

  23.75  

 
 

  638  

 
 

  0.56  

 
 

  0.52  

 
 

  326  

 
 

  0.74  

 
 

  0.21  

 
 

  0.01  

 
 

  0.10  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL51ALM4E204  

 
 

  112.87  

 
 

  113.61  

 
 

  581  

 
 

  0.74  

 
 

  0.68  

 
 

  2,148  

 
 

  5.84  

 
 

  2.48  

 
 

  0.38  

 
 

  0.51  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL51ALM4E205  

 
 

  19.31  

 
 

  19.83  

 
 

  641  

 
 

  0.52  

 
 

  0.50  

 
 

  635  

 
 

  2.51  

 
 

  0.90  

 
 

  0.03  

 
 

  0.28  

 
 

  LM6W1  

 
 

  Ag-Pb  

 
 

  ZKL51BLM4E201  

 
 

  24.50  

 
 

  25.13  

 
 

  640  

 
 

  0.63  

 
 

  0.51  

 
 

  123  

 
 

  0.28  

 
 

  0.15  

 
 

  0.01  

 
 

  0.09  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL51LM4E202  

 
 

  32.06  

 
 

  33.26  

 
 

  626  

 
 

  1.20  

 
 

  0.75  

 
 

  290  

 
 

  0.85  

 
 

  0.32  

 
 

  0.01  

 
 

  0.07  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL51LM4E203  

 
 

  23.74  

 
 

  28.83  

 
 

  634  

 
 

  5.09  

 
 

  1.01  

 
 

  104  

 
 

  0.75  

 
 

  0.18  

 
 

  0.01  

 
 

  0.05  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL51LM4E204  

 
 

  99.51  

 
 

  102.96  

 
 

  586  

 
 

  3.45  

 
 

  1.02  

 
 

  772  

 
 

  1.84  

 
 

  0.93  

 
 

  0.03  

 
 

  0.24  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL51LM4E204  

 
 

  121.16  

 
 

  121.92  

 
 

  573  

 
 

  0.76  

 
 

  0.68  

 
 

  1,538  

 
 

  5.65  

 
 

  1.89  

 
 

  0.73  

 
 

  0.38  

 
 

  LM5E  

 
 

  Ag-Pb  

 
 

  ZKL5201SC  

 
 

  26.42  

 
 

  27.09  

 
 

  489  

 
 

  0.67  

 
 

  0.56  

 
 

  199  

 
 

  0.84  

 
 

  0.29  

 
 

  0.04  

 
 

  0.03  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL5201SC  

 
 

  54.73  

 
 

  55.79  

 
 

  475  

 
 

  1.06  

 
 

  0.49  

 
 

  215  

 
 

  1.47  

 
 

  0.39  

 
 

  0.31  

 
 

  0.03  

 
 

  LM5E  

 
 

  Ag-Pb  

 
 

  ZKL5202SC  

 
 

  21.50  

 
 

  22.42  

 
 

  498  

 
 

  0.92  

 
 

  0.91  

 
 

  6,455  

 
 

  5.28  

 
 

  1.19  

 
 

  10.00  

 
 

  0.29  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL5202SC  

 
 

  52.83  

 
 

  54.05  

 
 

  489  

 
 

  1.22  

 
 

  1.20  

 
 

  395  

 
 

  0.56  

 
 

  0.04  

 
 

  0.04  

 
 

  0.08  

 
 

  LM5E  

 
 

  Ag-Pb  

 
 

  ZKL5202SC  

 
 

  63.30  

 
 

  63.92  

 
 

  487  

 
 

  0.62  

 
 

  0.92  

 
 

  345  

 
 

  1.30  

 
 

  0.10  

 
 

  0.05  

 
 

  0.04  

 
 

  LM9  

 
 

  Ag-Pb  

 
 

  ZKL5202Y  

 
 

  184.44  

 
 

  185.37  

 
 

  889  

 
 

  0.93  

 
 

  0.72  

 
 

  247  

 
 

  0.37  

 
 

  1.76  

 
 

  0.01  

 
 

  0.04  

 
 

  LM18E1  

 
 

  Ag-Pb  

 
 

  ZKL5203SC  

 
 

  29.80  

 
 

  31.04  

 
 

  475  

 
 

  1.24  

 
 

  0.98  

 
 

  149  

 
 

  0.28  

 
 

  0.09  

 
 

  0.39  

 
 

  0.03  

 
 

  [1]  

 
 

  Ag-Pb  

 
 

  ZKL5204SC  

 
 

  23.36  

 
 

  23.94  

 
 

  485  

 
 

  0.58  

 
 

  0.50  

 
 

  837  

 
 

  3.17  

 
 

  0.14  

 
 

  0.76  

 
 

  0.03  

 
 

  LM5W  

 
 

  Ag-Pb  

 
 

  ZKL52LM6W01  

 
 

  22.76  

 
 

  23.32  

 
 

  541  

 
 

  0.56  

 
 

  0.30  

 
 

  200  

 
 

  0.48  

 
 

  2.05  

 
 

  0.03  

 
 

  0.06  

 
 

  LM6W1  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E201  

 
 

  62.51  

 
 

  63.60  

 
 

  544  

 
 

  1.09  

 
 

  0.47  

 
 

  14  

 
 

  0.21  

 
 

  0.18  

 
 

  2.13  

 
 

  0.04  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53ALM4E202  

 
 

  72.92  

 
 

  74.02  

 
 

  542  

 
 

  1.10  

 
 

  0.95  

 
 

  14  

 
 

  0.22  

 
 

  0.21  

 
 

  1.22  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53ALM4E202  

 
 

  79.18  

 
 

  79.79  

 
 

  537  

 
 

  0.61  

 
 

  0.53  

 
 

  1  

 
 

  0.03  

 
 

  0.01  

 
 

  2.66  

 
 

  0.01  

 
 

  LM4  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E202  

 
 

  281.67  

 
 

  283.34  

 
 

  370  

 
 

  1.67  

 
 

  0.52  

 
 

  204  

 
 

  0.64  

 
 

  0.36  

 
 

  0.46  

 
 

  0.03  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E202  

 
 

  314.97  

 
 

  316.25  

 
 

  343  

 
 

  1.28  

 
 

  0.79  

 
 

  138  

 
 

  0.02  

 
 

  0.03  

 
 

  0.01  

 
 

  0.01  

 
 

  LM5E  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E203  

 
 

  163.55  

 
 

  164.51  

 
 

  510  

 
 

  0.96  

 
 

  0.77  

 
 

  104  

 
 

  0.27  

 
 

  0.46  

 
 

  0.01  

 
 

  0.16  

 
 

  LM5W2  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E204  

 
 

  89.14  

 
 

  90.64  

 
 

  561  

 
 

  1.50  

 
 

  1.18  

 
 

  26  

 
 

  0.75  

 
 

  0.21  

 
 

  3.23  

 
 

  0.03  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53ALM4E204  

 
 

  157.88  

 
 

  159.62  

 
 

  529  

 
 

  1.74  

 
 

  0.79  

 
 

  177  

 
 

  3.33  

 
 

  2.25  

 
 

  0.06  

 
 

  0.05  

 
 

  LM5W  

 
 

  Ag-Pb  

 
 

  ZKL53ALM4E205  

 
 

  54.15  

 
 

  55.52  

 
 

  565  

 
 

  1.37  

 
 

  1.05  

 
 

  3  

 
 

  0.04  

 
 

  0.02  

 
 

  2.30  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53ALM4E207  

 
 

  82.72  

 
 

  83.55  

 
 

  571  

 
 

  0.83  

 
 

  0.65  

 
 

  2  

 
 

  0.04  

 
 

  0.00  

 
 

  2.50  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53LM4E202  

 
 

  97.77  

 
 

  99.08  

 
 

  544  

 
 

  1.31  

 
 

  0.98  

 
 

  12  

 
 

  0.16  

 
 

  0.05  

 
 

  1.40  

 
 

  0.03  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL53LM4E202  

 
 

  132.69  

 
 

  134.22  

 
 

  523  

 
 

  1.53  

 
 

  1.14  

 
 

  2  

 
 

  0.02  

 
 

  0.01  

 
 

  1.62  

 
 

  0.01  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL53LM4E208  

 
 

  29.52  

 
 

  30.23  

 
 

  633  

 
 

  0.71  

 
 

  0.65  

 
 

  1,902  

 
 

  1.48  

 
 

  0.32  

 
 

  0.01  

 
 

  0.48  

 
 

  LM5W2  

 
 

  Ag-Pb  

 
 

  ZKL53LM602  

 
 

  23.73  

 
 

  24.84  

 
 

  696  

 
 

  1.11  

 
 

  1.09  

 
 

  341  

 
 

  0.16  

 
 

  0.13  

 
 

  0.05  

 
 

  0.35  

 
 

  LM4W  

 
 

  Ag-Pb  

 
 

  ZKL53LM602  

 
 

  41.6  

 
 

  44.04  

 
 

  690  

 
 

  2.44  

 
 

  2.39  

 
 

  118  

 
 

  0.73  

 
 

  0.31  

 
 

  0.05  

 
 

  0.02  

 
 

  LM4  

 
 

  Ag-Pb  

 
 

  ZKL53LM602  

 
 

  73.36  

 
 

  74.01  

 
 

  680  

 
 

  0.65  

 
 

  0.64  

 
 

  1,596  

 
 

  2.06  

 
 

  0.63  

 
 

  0.05  

 
 

  0.27  

 
 

  LM6W  

 
 

  Ag-Pb  

 
 

  ZKL53LM603  

 
 

  64.54  

 
 

  65.38  

 
 

  645  

 
 

  0.84  

 
 

  0.74  

 
 

  718  

 
 

  0.41  

 
 

  0.43  

 
 

  0.00  

 
 

  0.10  

 
 

  LM4  

 
 

  Ag-Pb  

 
 

  ZKL53LM603  

 
 

  108.98  

 
 

  110.56  

 
 

  604  

 
 

  1.58  

 
 

  1.38  

 
 

  432  

 
 

  0.92  

 
 

  0.38  

 
 

  0.00  

 
 

  0.04  

 
 

  LM6W  

 
 

  Ag-Pb  

 
 

  ZKL53LM603  

 
 

  179.78  

 
 

  180.31  

 
 

  540  

 
 

  0.53  

 
 

  0.47  

 
 

  165  

 
 

  0.23  

 
 

  0.06  

 
 

  0.03  

 
 

  0.01  

 
 

  LM5W2  

 
 

  Ag-Pb  

 
 

  ZKL5403SC  

 
 

  4.12  

 
 

  8.19  

 
 

  499  

 
 

  4.07  

 
 

  2.90  

 
 

  280  

 
 

  0.45  

 
 

  0.23  

 
 

  0.28  

 
 

  0.02  

 
 

  LM6E2  

 
 

  Ag-Pb  

 
 

  ZKL5403SC  

 
 

  129.98  

 
 

  130.76  

 
 

  388  

 
 

  0.78  

 
 

  0.56  

 
 

  696  

 
 

  6.53  

 
 

  0.97  

 
 

  0.00  

 
 

  0.28  

 
 

  LM5E2  

 
 

  Ag-Pb  

 
 

  including  

 
 

  7.59  

 
 

  8.19  

 
 

  496  

 
 

  0.60  

 
 

  0.47  

 
 

  1,238  

 
 

  2.04  

 
 

  0.82  

 
 

  1.24  

 
 

  0.06  

 
 

  LM6E2  

 
 

  Ag-Pb  

 
 

  ZKL5404SC  

 
 

  44.52  

 
 

  45.39  

 
 

  477  

 
 

  0.87  

 
 

  0.76  

 
 

  239  

 
 

  0.24  

 
 

  0.11  

 
 

  0.05  

 
 

  0.02  

 
 

  LM5W  

 
 

  Ag-Pb  

 
 

  ZKL54ALM6W01  

 
 

  2.95  

 
 

  3.38  

 
 

  552  

 
 

  0.43  

 
 

  0.30  

 
 

  454  

 
 

  1.44  

 
 

  0.14  

 
 

  0.15  

 
 

  0.05  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL54ALM6W01  

 
 

  38.78  

 
 

  40.26  

 
 

  541  

 
 

  1.48  

 
 

  0.53  

 
 

  256  

 
 

  0.14  

 
 

  0.16  

 
 

  0.06  

 
 

  0.07  

 
 

  LM6W  

 
 

  Ag-Pb  

 
 

  ZKL54ALM6W01  

 
 

  129.54  

 
 

  130.08  

 
 

  511  

 
 

  0.54  

 
 

  0.39  

 
 

  29  

 
 

  0.08  

 
 

  0.05  

 
 

  1.59  

 
 

  0.01  

 
 

  LM4W2  

 
 

  Ag-Pb  

 
 

  ZKL55ALM4E203  

 
 

  38.41  

 
 

  39.04  

 
 

  570  

 
 

  0.63  

 
 

  0.45  

 
 

  186  

 
 

  1.40  

 
 

  0.20  

 
 

  0.83  

 
 

  0.52  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55ALM4E204  

 
 

  28.84  

 
 

  29.73  

 
 

  583  

 
 

  0.89  

 
 

  0.78  

 
 

  65  

 
 

  0.47  

 
 

  0.48  

 
 

  1.41  

 
 

  0.03  

 
 

  LM6W  

 
 

  Ag-Pb  

 
 

  ZKL55ALM4E204  

 
 

  33.78  

 
 

  35.77  

 
 

  579  

 
 

  1.99  

 
 

  0.88  

 
 

  9  

 
 

  0.16  

 
 

  0.12  

 
 

  1.73  

 
 

  0.01  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL55ALM4E204  

 
 

  50.26  

 
 

  51.65  

 
 

  568  

 
 

  1.39  

 
 

  1.22  

 
 

  154  

 
 

  0.83  

 
 

  0.63  

 
 

  0.24  

 
 

  0.03  

 
 

  LM6E  

 
 

  Ag-Pb  

 
 

  ZKL55ALM4E205  

 
 

  27.18  

 
 

  29.25  

 
 

  591  

 
 

  2.07  

 
 

  0.83  

 
 

  24  

 
 

  0.18  

 
 

  0.12  

 
 

  1.17  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55ALM4E205  

 
 

  50.88  

 
 

  51.42  

 
 

  581  

 
 

  0.54  

 
 

  0.43  

 
 

  828  

 
 

  0.53  

 
 

  0.23  

 
 

  0.04  

 
 

  0.06  

 
 

  LM6E  

 
 

  Ag-Pb  

 
 

  ZKL55ALM4E207  

 
 

  76.91  

 
 

  77.88  

 
 

  593  

 
 

  0.97  

 
 

  0.58  

 
 

  108  

 
 

  0.32  

 
 

  0.25  

 
 

  1.28  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55LM4E201  

 
 

  65.09  

 
 

  69.39  

 
 

  559  

 
 

  4.30  

 
 

  1.03  

 
 

  14  

 
 

  0.34  

 
 

  0.19  

 
 

  2.05  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55LM4E202  

 
 

  84.70  

 
 

  85.92  

 
 

  565  

 
 

  1.22  

 
 

  1.00  

 
 

  27  

 
 

  0.67  

 
 

  0.21  

 
 

  1.98  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55LM4E203  

 
 

  26.44  

 
 

  27.60  

 
 

  581  

 
 

  1.16  

 
 

  0.93  

 
 

  70  

 
 

  0.57  

 
 

  0.26  

 
 

  5.43  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL55LM4E203  

 
 

  78.30  

 
 

  79.10  

 
 

  539  

 
 

  0.80  

 
 

  0.63  

 
 

  2  

 
 

  0.35  

 
 

  0.00  

 
 

  1.51  

 
 

  0.01  

 
 

  LM5W2  

 
 

  Ag-Pb  

 
 

  ZKL55LM4E204  

 
 

  47.45  

 
 

  48.49  

 
 

  578  

 
 

  1.04  

 
 

  0.98  

 
 

  16  

 
 

  0.09  

 
 

  0.27  

 
 

  2.22  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL5601Y  

 
 

  297.12  

 
 

  298.02  

 
 

  811  

 
 

  0.90  

 
 

  0.83  

 
 

  177  

 
 

  1.56  

 
 

  0.48  

 
 

  0.04  

 
 

  0.01  

 
 

  LM3_1  

 
 

  Ag-Pb  

 
 

  ZKL5602Y  

 
 

  126.54  

 
 

  127.73  

 
 

  897  

 
 

  1.19  

 
 

  1.00  

 
 

  103  

 
 

  4.17  

 
 

  0.60  

 
 

  0.05  

 
 

  0.06  

 
 

  LM18E1  

 
 

  Ag-Pb  

 
 

  ZKL5602Y  

 
 

  152.39  

 
 

  153.64  

 
 

  893  

 
 

  1.25  

 
 

  1.05  

 
 

  37  

 
 

  3.74  

 
 

  0.39  

 
 

  0.05  

 
 

  0.05  

 
 

  LM2_1  

 
 

  Ag-Pb  

 
 

  ZKL57LM4E201  

 
 

  65.15  

 
 

  66.23  

 
 

  554  

 
 

  1.08  

 
 

  0.83  

 
 

  5  

 
 

  0.25  

 
 

  0.03  

 
 

  2.00  

 
 

  0.03  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL57LM4E204  

 
 

  46.03  

 
 

  47.56  

 
 

  585  

 
 

  1.53  

 
 

  0.91  

 
 

  14  

 
 

  0.30  

 
 

  0.36  

 
 

  1.20  

 
 

  0.02  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL57LM4E206  

 
 

  75.18  

 
 

  80.32  

 
 

  594  

 
 

  5.14  

 
 

  0.61  

 
 

  321  

 
 

  1.91  

 
 

  0.89  

 
 

  0.16  

 
 

  0.04  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL57LM601  

 
 

  89.62  

 
 

  90.96  

 
 

  807  

 
 

  1.34  

 
 

  1.32  

 
 

  311  

 
 

  0.73  

 
 

  0.31  

 
 

  0.05  

 
 

  0.05  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKL57LM601  

 
 

  120.89  

 
 

  123.60  

 
 

  794  

 
 

  2.71  

 
 

  2.67  

 
 

  143  

 
 

  2.42  

 
 

  0.08  

 
 

  0.05  

 
 

  0.02  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL5801SC  

 
 

  4.9  

 
 

  5.84  

 
 

  502  

 
 

  0.94  

 
 

  0.53  

 
 

  3,014  

 
 

  5.51  

 
 

  0.39  

 
 

  0.20  

 
 

  0.11  

 
 

  LM6E2  

 
 

  Ag-Pb  

 
 

  ZKL5802SC  

 
 

  5.53  

 
 

  6.5  

 
 

  500  

 
 

  0.97  

 
 

  0.81  

 
 

  328  

 
 

  0.32  

 
 

  0.10  

 
 

  0.05  

 
 

  0.05  

 
 

  LM6E2  

 
 

  Ag-Pb  

 
 

  ZKL58ALM6E201  

 
 

  129.67  

 
 

  130.52  

 
 

  522  

 
 

  0.85  

 
 

  0.79  

 
 

  210  

 
 

  0.22  

 
 

  0.25  

 
 

  0.10  

 
 

  0.04  

 
 

  LM6E2  

 
 

  Ag-Pb  

 
 

  ZKL58ALM6E201  

 
 

  190.78  

 
 

  192.56  

 
 

  484  

 
 

  1.78  

 
 

  1.64  

 
 

  88  

 
 

  1.40  

 
 

  0.46  

 
 

  0.07  

 
 

  0.06  

 
 

  LM5E1  

 
 

  Ag-Pb  

 
 

  ZKL61B01  

 
 

  80.70  

 
 

  81.55  

 
 

  590  

 
 

  0.85  

 
 

  0.31  

 
 

  38  

 
 

  0.10  

 
 

  0.23  

 
 

  1.59  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL61E02  

 
 

  33.61  

 
 

  34.98  

 
 

  625  

 
 

  1.37  

 
 

  1.36  

 
 

  85  

 
 

  1.54  

 
 

  0.39  

 
 

  2.16  

 
 

  0.04  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL63ALM4E205  

 
 

  41.74  

 
 

  43.29  

 
 

  634  

 
 

  1.55  

 
 

  0.71  

 
 

  149  

 
 

  1.45  

 
 

  0.96  

 
 

  4.23  

 
 

  0.60  

 
 

  LM5  

 
 

  Ag-Pb  

 
 

  ZKL63ALM4E205  

 
 

  76.36  

 
 

  78.66  

 
 

  618  

 
 

  2.30  

 
 

  0.54  

 
 

  60  

 
 

  0.70  

 
 

  0.14  

 
 

  0.91  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL63LM4E206  

 
 

  39.03  

 
 

  40.11  

 
 

  633  

 
 

  1.08  

 
 

  0.74  

 
 

  2  

 
 

  0.04  

 
 

  0.02  

 
 

  1.95  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 

  ZKL64Y09  

 
 

  49.20  

 
 

  49.74  

 
 

  806  

 
 

  0.54  

 
 

  0.47  

 
 

  18  

 
 

  3.35  

 
 

  0.19  

 
 

  0.05  

 
 

  0.01  

 
 

  LM2_2  

 
 

  Ag-Pb  

 
 

  ZKL64Y10  

 
 

  36.31  

 
 

  36.81  

 
 

  826  

 
 

  0.50  

 
 

  0.43  

 
 

  19  

 
 

  3.30  

 
 

  0.15  

 
 

  0.01  

 
 

  0.01  

 
 

  LM2E  

 
 

  Ag-Pb  

 
 

  ZKL64Y11  

 
 

  31.34  

 
 

  31.83  

 
 

  830  

 
 

  0.49  

 
 

  0.40  

 
 

  13  

 
 

  4.46  

 
 

  0.08  

 
 

  0.01  

 
 

  0.01  

 
 

  LM2E  

 
 

  Ag-Pb  

 
 

  ZKL68Y01  

 
 

  107.42  

 
 

  107.92  

 
 

  726  

 
 

  0.50  

 
 

  0.38  

 
 

  392  

 
 

  2.31  

 
 

  0.21  

 
 

  0.03  

 
 

  0.02  

 
 

  LM6  

 
 

  Ag-Pb  

 
 

  ZKLDB1712  

 
 

  238.15  

 
 

  239.29  

 
 

  681  

 
 

  1.14  

 
 

  1.08  

 
 

  19  

 
 

  0.51  

 
 

  0.08  

 
 

  13.70  

 
 

  0.01  

 
 

  LM61  

 
 

  Au  

 
 

  ZKLDB51LM4E202  

 
 

  0.89  

 
 

  2.00  

 
 

  902  

 
 

  1.11  

 
 

  1.10  

 
 

  156  

 
 

  0.12  

 
 

  0.06  

 
 

  0.01  

 
 

  0.09  

 
 

  LM66  

 
 

  Ag-Pb  

 
 

  ZKLDB56ALM4W01  

 
 

  264.50  

 
 

  265.30  

 
 

  952  

 
 

  0.80  

 
 

  0.79  

 
 

  397  

 
 

  0.58  

 
 

  0.12  

 
 

  0.10  

 
 

  0.04  

 
 

  LM4W  

 
 

  Ag-Pb  

 
 

  ZKLDB57ALM503  

 
 

  380.87  

 
 

  382.80  

 
 

  691  

 
 

  1.93  

 
 

  1.81  

 
 

  2  

 
 

  0.01  

 
 

  0.01  

 
 

  2.01  

 
 

  0.01  

 
 

  LM4E2  

 
 

  Au  

 
 
 

[1] No vein id assigned

 

  Quality Control  

 

Drill cores are NQ size. Drill core samples, limited by apparent mineralization contacts or shear/alteration contacts, were split into halves by saw cutting. The half cores are stored in the Company's core shacks for future reference and checks, and the other half core samples are shipped in securely sealed bags to the Chengde Huakan 514 Geology and Minerals Test and Research Institute in Chengde, Hebei Province , China , 226 km northeast of Beijing , the Zhengzhou Nonferrous Exploration Institute Lab in Zhengzhou , Henan Province , China , and the Analytical Lab of the Inner Mongolia Geological Exploration Bureau in Hohhot, Inner Mongolia, China . All the three labs are ISO9000 certified analytical labs. For analysis, the sample is dried and crushed to minus 1 mm and then split to a 200-300 g subsample which is further pulverized to minus 200 mesh. Two subsamples are prepared from the pulverized sample. One is digested with aqua regia for gold analysis with atomic absorption spectroscopy ("AAS"), and the other is digested with two-acids for analysis of silver, lead, zinc and copper with AAS.

 

Channel samples are collected along sample lines perpendicular to the mineralized vein structure in exploration tunnels. Spacing between sampling lines is typically 5 m along strike. Both the mineralized vein and the altered wall rocks are cut by continuous chisel chipping. Sample length ranges from 0.2 m to more than 1 m , depending on the width of the mineralized vein and the mineralization type. Channel samples are prepared and assayed with AAS at Silvercorp's mine laboratory ( Ying Lab ) located at the mill complex in Luoning County, Henan Province , China . The Ying lab is officially accredited by the Quality and Technology Monitoring Bureau of Henan Province and is qualified to provide analytical services. The channel samples are dried, crushed and pulverized. A 200 g sample of minus 160 mesh is prepared for assay. A duplicate sample of minus 1 mm is made and kept in the laboratory archives. Gold is analysed by fire assay with AAS finish, and silver, lead, zinc and copper are assayed by two-acid digestion with AAS finish.

 

A routine quality assurance/quality control ("QA/QC") procedure is adopted to monitor the analytical quality at each lab. Certified reference materials ("CRMs"), pulp duplicates and blanks are inserted into each batch of lab samples. QA/QC data at the lab are attached to the assay certificates for each batch of samples.

 

The Company maintains its own comprehensive QA/QC program to ensure best practices in sample preparation and analysis of the exploration samples. Project geologists regularly insert CRM, field duplicates and blanks to each batch of 30 core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending approximately 3-5% of the pulp samples to higher level labs to check for lab bias.  Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by project geologists.

 

  Guoliang Ma , P. Geo., Manager of Exploration and Resource of the Company, is the Qualified Person for Silvercorp under NI 43-101 and has reviewed and given consent to the technical information contained in this news release.

 

  About Silvercorp  

 

Silvercorp is a profitable Canadian mining company producing silver, lead and zinc metals in concentrates from mines in China . The Company's goal is to continuously create healthy returns to shareholders through efficient management, organic growth and the acquisition of profitable projects. Silvercorp balances profitability, social and environmental relationships, employees' wellbeing, and sustainable development.  For more information, please visit our website at www.silvercorp.ca .

 

For further information

 

Lon Shaver
Vice President
Silvercorp Metals Inc.

 

Phone: (604) 669-9397
Toll Free: 1(888) 224-1881
Email: investor@silvercorp.ca  
Website: www.silvercorpmetals.com  

 

   CAUTIONARY DISCLAIMER - FORWARD LOOKING STATEMENTS   

 

  Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information.  Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining District; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.  

 

  Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: social and economic impacts of COVID-19; fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licenses; title to properties; property interests;  joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations;  competition;  operations and political conditions; regulatory environment in China and Canada;  environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.  

 

  This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2020 under the heading "Risk Factors".  Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended.  Accordingly, readers should not place undue reliance on forward-looking statements or information.  

 

  The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.  

 

   CAUTIONARY NOTE TO US INVESTORS   

 

  The disclosure in this news release and referred to herein was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the "SEC").  The terms "proven mineral reserve", "probable mineral reserve" and "mineral reserves" used in this news release are in reference to the mining terms defined in the Canadian Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions have been adopted by NI 43-101.  Accordingly, information contained in this news release providing descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar information made public by other U.S. companies subject to the United States federal securities laws and the rules and regulations thereunder.  

 

  Investors are cautioned not to assume that any part or all of mineral resources will ever be converted into reserves. Pursuant to CIM Definition Standards, "Inferred mineral resources" are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling.  Such geological evidence is sufficient to imply but not verify geological and grade or quality continuity.  An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.  Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases.  Investors are cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable.  Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit measures.  

 

  Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from standards in the SEC Industry Guide 7.  Effective February 25, 2019 , the SEC adopted new mining disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year beginning on or after January 1, 2021.  The SEC Modernization Rules replace the historical property disclosure requirements included in SEC Industry Guide 7.  As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "Measured Mineral Resources", "Indicated Mineral Resources" and "Inferred Mineral Resources".  In addition, the SEC has amended its definitions of "Proven Mineral Reserves" and "Probable Mineral Reserves" to be substantially similar to corresponding definitions under the CIM Definition Standards.  During the period leading up to the compliance date of the SEC Modernization Rules, information regarding mineral resources or reserves contained or referenced in this news release may not be comparable to similar information made public by companies that report according to U.S. standards.  While the SEC Modernization Rules are purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards.  Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules.  

 
 
 

 Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/silvercorp-intersects-vein-lm5-with-0-91-metres-true-width-grading-6-455-grams-per-tonne-silver-and-10-grams-per-tonne-gold-at-the-lme-mine-ying-mining-district-china-301316931.html  

 

SOURCE Silvercorp Metals Inc

 

 

 

 Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/June2021/22/c9650.html  

 
 

News Provided by Canada Newswire via QuoteMedia

The Conversation (0)
Rapid Successfully Undertakes $10.5M Capital Raising to Fund Acquisition of the Webbs and Conrads NSW Silver Projects

Rapid Successfully Undertakes $10.5M Capital Raising to Fund Acquisition of the Webbs and Conrads NSW Silver Projects

Rapid Critical Metals Limited (‘Rapid,’ ‘RCM’ or ‘Company’) is pleased to announce that the Company has received firm commitments from institutional, sophisticated and professional investors for the placement of 437,500,000New Fully Paid Ordinary Shares (New Shares) at an issue price of A$0.024 per new share (post 12-for-1 consolidation) to raise gross proceeds of A$10.5 million (Placement). The Placement comprises two tranches:

Keep reading...Show less
Silver bars with rising chart, "Weekly Editor's Picks" text overlay.

Editor's Picks: Silver Price Hits 13 Year High, Gold Takes a Breather

Gold was on the decline this week, closing just below US$3,370 per ounce, after tensions in the Middle East pushed it past the US$3,430 level toward the end of last week.

All eyes were on the US Federal Reserve, which in a widely expected move left interest rates unchanged on Wednesday (June 18) following its two day meeting. The central bank cut rates in December 2024, but has kept them steady for its last four gatherings.

US President Donald Trump wasn't pleased, calling Powell "too late" in a Thursday (June 19) post on Truth Social. While speculation that Trump will fire Powell has died down, the president did recently say he intends to announce his next pick for the Fed leader position "very soon."

Keep reading...Show less
Silver metallic dice spelling "ETF" against stock chart background.

10 Silver ETFs for Every Investing Style in 2025

Investors looking for exposure to the silver price and silver-mining companies should consider silver exchange-traded funds (ETFs).

Spurred by moves in the gold market, safe-haven buying as well as increasing demand from industrial sectors, silver saw strong price movements in the first half of 2025, breaching US$37 per ounce for the first time since 2011.

While silver has often been seen as a more approachable precious metal owing to its lower per ounce price, its performance has lagged gains seen in the gold price over the past few years. However, silver stole some of the spotlight in the second quarter of 2025 as it saw significant gains on the back of geopolitical tension and economic uncertainty from the US trade and tariff policy.

Keep reading...Show less
Silver bars and US$100 bills with a rising chart overlay.

Silver Price Surges to US$37, Highest Value Since May 2011

After being overshadowed by gold early in the year, silver has been in the spotlight in recent weeks.

The white metal broke through the US$37 per ounce mark on Tuesday (June 17) for the first time since May 2011.

Recent economic and geopolitical events have raised analysts’ expectations of a September rate cut from the US Federal Reserve, helping to fuel safe-haven buying of silver and gold.

Keep reading...Show less

Latest Press Releases

Related News

×