Copper Fox Files Preliminary Economic Assessment of Van Dyke Project on SEDAR

Copper Fox Metals Inc. (TSXV: CUU) ('Copper Fox' or the 'Company'), through its wholly owned subsidiary Desert Fox Copper Inc., are pleased to report that it has filed on SEDAR a National Instrument 43-101 ("NI 43-101") technical report titled "NI 43-101 Preliminary Economic Assessment Technical Report for the Van Dyke Copper Project" dated February 26, 2021, prepared by Moose Mountain Technical Services ("MMTS") and Ausenco. The results of the Preliminary Economic Assessment ("PEA") for the Van Dyke project were disclosed in a previous news release dated January 12, 2021.

Elmer B. Stewart, President and CEO of Copper Fox stated, "The four-fold increase in value over that demonstrated by the 2015 PEA, and significant potential to increase the resource base through exploration, has shown the Van Dyke deposit to be a technically sound, in-situ copper recovery (ISCR) project. While the PEA is preliminary in nature, the results of which are speculative, the study has indicated several opportunities for additional value-added work programs to be completed which, if successful, would significantly de-risk the project."

PEA Recommendations:

  • A diamond drilling program to expand the size of the resource and upgrade the existing Indicated and Inferred Resources to a higher resource classification.
  • Proceed to the permitting stage to obtain an Arizona Protection Permit and the Underground Injection Control Permit for Class III Wells.
  • Complete an ISCR pilot test program designed to further investigate overall metal recoveries, connectivity between wells, refine well field design, and determine the extent of rock stimulation required, if any.
  • The total recommended budget is estimated to be $US15.5 million.

The PEA used the technical report that Copper Fox filed on SEDAR May 5, 2020 entitled "NI 43-101 Technical Report and Updated Resource Estimate for the Van Dyke Copper Project" dated May 4, 2020 with Ms. Sue Bird, P.Eng and R. Lane P.Geo, as Qualified Persons. The 2020 resource estimate resulted in an upgrade in resource classification and an increase in soluble copper content of the deposit.

2020 Resource Estimate used in the 2020 PEA:


Metal (Mlbs)
ClassKTonnesTCu
(%)
ASCu (%)CNCu
(%)
RecCu
(%)
Recovery (%)Soluble CuTotal Cu
Indicated 97,6370.330.230.040.2490517 717
Inferred168,0260.270.170.040.19906991,007

 

(%)=percent, TCu=total copper, Soluble Cu=estimated pounds of recoverable copper, Mlbs=million pounds
Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2020 PEA Highlights:



Base Case
Production and Cost SummaryUnits2015 PEA2020 PEA
Life of Mine (LOM)years1117
Copper Cathode SoldMillion lbs.456.91101.0
Copper Price$US/lb3.003.15
Gross RevenueM$US1,370.03,468.3
RoyaltiesM$US31.582.5
Total Cash Costs M$US550.21,075.8
Total Cash Costs ($/lb recovered copper)$US/lb copper1.200.98
C1 Cash Costs ($/lb recovered copper)*$US/lb copper1.080.86
Sustaining Costs ($/lb recovered copper)$US/lb copper0.150.07
All In sustaining cost (AISC)**$US/lb copper1.361.14
Initial Capital Costs (includes contingency)M$US204.4290.5
TaxesM$US110.9321.0
Cashflow Parameters and Outputs
Discount Rate%8.0%7.5%
Pre-tax Net Free Cash FlowM$US453.11,757.3
Pre-tax NPVM$US213.1798.6
Pre-tax IRR%0.448.4%
Pre-tax Paybackyears2.32.0
Post-tax Net Free Cash FlowM$US342.21,436.3
Post-tax NPVM$US149.5644.7
Post-tax IRR%27.9%43.4%
Post-tax Paybackyears2.92.1
* includes mining, processing, site services, G&A, transportation, and Royalty Costs.
** includes Total Cash Cost, Sustaining Capital, Royalties, Severance Taxes


The following table summarizes the project economics to copper prices:
(Base Case @$US3.15/lb)


Copper Price ($US)
ProductionUnit$US3.15$US3.30$US3.50
Gross RevenueM$US3,468.33,633.53,853.7
RoyaltiesM$US82.586.491.7
TaxesM$US321.0350.4389.7
AISC ($lb/recovered copper)$US/lb.1.141.151.15
Cashflow Parameters and OutputsUnit$US3.15$US3.30$US3.50
Pre-tax Net Free Cash Flow-EBITDAM$US1,757.31,901.42,093.5
Pre-tax NPVM$US798.6870.9966.7
Pre-tax IRRM$US48.4%51.3%55.1
Post Tax Net Free Cash FlowM$US1,436.31,551.01,703.8
Post-tax NPVM$US644.7701.8777.9
Post-tax IRRM$US43.4%45.8%49.1%

 

The results of the 2021 PEA are preliminary in nature as it includes an inferred mineral resource which is considered too speculative geologically to have the economic considerations applied that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecasts will be realized or that any of the resources will ever be upgraded to reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Figures below show the project LOM annualized copper production and projected post-tax-free cash flow.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/2177/75671_table1.jpg

Projected LOM Production (MLb)

To view an enhanced version of this table, please visit:
https://orders.newsfilecorp.com/files/2177/75671_coppertable1.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/2177/75671_table2.jpg

Projected Post-Tax Cash Flow

To view an enhanced version of this table, please visit:
https://orders.newsfilecorp.com/files/2177/75671_coppertable2.jpg

Qualified Persons:

Sue Bird - P.Eng. of MMTS, R. Lane - P.Geo., of MMTS, T. Meintjes - P.Eng., of MMTS and Jim Norine P.E, of Ausenco are the QP's pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects. Elmer B. Stewart, MSc. P. Geol., President and CEO of Copper Fox, is the Company's non-independent, nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, and has reviewed and approves the scientific and technical information disclosed in this news release.

About Copper Fox:

Copper Fox is a Tier 1 Canadian resource company listed on the TSX Venture Exchange (TSXV: CUU) focused on copper exploration and development in Canada and the United States. The principal assets of Copper Fox and its wholly owned Canadian and United States subsidiaries, being Desert Fox Copper Inc., and Northern Fox Copper Inc. are the 25% interest in the Schaft Creek Joint Venture with Teck Resources Limited on the Schaft Creek copper-gold-molybdenum-silver project located in northwestern British Columbia and a 100% ownership of the Van Dyke oxide copper project located in Miami, Arizona. For more information on Copper Fox's other mineral properties and investments visit the Company's website at https://www.copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart
President and Chief Executive Officer

For additional information contact:

Lynn Ball: investor@copperfoxmetals.com
(844) 464-2820 or (403) 264-2820

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains forward-looking statements within the meaning of the Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward-looking information within the meaning of the Canadian securities laws (collectively, "forward-looking information"). Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements regarding: A diamond drilling program to expand and upgrade the existing resources; obtaining an Arizona Protection Permit and the Underground Injection Control Permit for Class III Wells; an ISCR pilot test program designed to further investigate overall metal recoveries, connectivity between wells, refine well field design, and determine the extent of rock stimulation if required; and a recommended budget estimated to be $US15.5 million.

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions regarding, among other things: the geological advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with industry standards and the reliability of historical reports. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the diamond drilling program may not result in expanding or upgrading the existing resources or be completed at all; the Arizona Protection Permit and the Underground Injection Control Permit for Class III Wells may not be obtained; the ISCR pilot test program may not result in any significant improvements in overall metal recoveries, demonstrate connectivity between wells, revisions to well field design, or determine the extent of rock stimulation if required; and the estimated $US15.5 million budget to complete the program may not be accurate; the financial markets and the overall economy may deteriorate; the need to obtain additional financing and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events, or developments, except as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/75671

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Anax Metals (ASX:ANX)

Anax Metals Limited (ASX: ANX) – Trading Halt

Description

The securities of Anax Metals Limited (‘ANX’) will be placed in trading halt at the request of ANX, pending it releasing an announcement. Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of the commencement of normal trading on Friday, 11 October 2024 or when the announcement is released to the market.

Keep reading...Show less
Bars of copper.

Austral Resources' Positive Scoping Study Expands Copper Pipeline

Austral Resources (ASX:AR1) released the results of a positive scoping study conducted by independent consultant ERM Australia on Friday (October 4).

The study focused on several of the company's key deposits, namely Lady Annie, Lady Brenda, Mount Clarke and Flying Horse.

The study found that Austral could mine approximately 128,000 tonnes of contained copper from these deposits using two methods. The majority, about 112,000 tonnes, would be processed via flotation.

Additionally, the total includes about 15,600 tonnes of contained copper oxide, as well as transitional ore, that can be mined and processed on-site at Austral’s Mt Kelly solvent extraction-electrowinning (SX/EW) processing facility.

Keep reading...Show less

Ero Copper to Release Third Quarter 2024 Operating and Financial Results on November 5, 2024

Ero Copper Corp. (TSX: ERO, NYSE: ERO) (the "Company") will publish its third quarter 2024 operating and financial results on Tuesday, November 5, 2024 after market close. The Company will host a conference call to discuss the results on Wednesday, November 6, 2024 at 11:30am Eastern time (8:30am Pacific time).

CONFERENCE CALL DETAILS

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Hudbay Reaches a Mutually Agreed Settlement in Longstanding Civil Lawsuits Related to Former Guatemala Operations

Hudbay Minerals Inc. ("Hudbay" or the "company") (TSX, NYSE: HBM) today announced that it has reached a final settlement with all plaintiffs in three civil lawsuits brought against the company regarding alleged actions that occurred in Guatemala in 2007 and 2009. This settlement concludes all outstanding legal matters related to Hudbay's former activities in Guatemala. Hudbay was named in the civil suits because of its ownership of the Fenix nickel project, which was acquired in 2008. In one of the lawsuits, brought by 11 female plaintiffs, the allegations against the Guatemalan company that owns the project predate Hudbay's ownership. In 2011, Hudbay divested itself of its holdings in Guatemala and has had no operations there since that time.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Ero Copper Reports Temporary Power Disruption at the Tucumã Operation Following Severe Windstorm

Ero Copper Corp. (TSX: ERO, NYSE: ERO) ("Ero" or the "Company") announces that its Tucumã Operation has experienced a temporary power disruption following a severe localized windstorm that occurred in the southwest region of the Carajás Mineral Province in Pará State, Brazil on October 5, 2024. The Company's workforce is safe, and there has been no damage to infrastructure at the Tucumã Operation.

The regional power grid, including the main 230kV transmission line servicing the region, sustained damage during the storm, resulting in a loss of power to more than 200,000 residents as well as major industrial users. Power has since been fully restored to residential communities and partially restored to industrial consumers. The owner and operator of the transmission line has advised that full power restoration to industrial consumers, including the Company's Tucumã Operation, is expected within two weeks.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Map showing Queensland, Australia.

Northern Queensland’s Rich Copper Resource

Copper is a versatile metal that has a long list of commercial and industrial uses. Australia has 11 percent of world reserves of copper and the state of Queensland, particularly its northern region, produces more than 20 percent of Australia’s copper output. This high-quality copper is refined to 99.99 percent purity.

As electrification and decarbonization efforts ramp up around the world, Northern Queensland and its rich deposits and well-developed mining infrastructure will continue to be a copper hub. Government programs to bolster copper mining, smelting and refining will support the industry even further.

Copper is considered a critical mineral by many jurisdictions around the world as it’s an essential component in green energy products and infrastructure. Demand for copper is expected to double by 2050, which is triggering investments in copper at all levels of the supply chain worldwide.

Keep reading...Show less

Latest Press Releases

Related News

×