Altiplano Obtains Exploitation Permit at Maria Luisa

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce that the Exploitation Permit Application for the Maria Luisa historical Gold-Copper mine has been approved by the Chilean mining authority Servicio Nacional de Geologia y Mineria (SERNAGEOMIN). The Maria Luisa project is located within the Atacama Region 100 km north of La Serena in Incahuasi, Chile.

This approval provides the Company the authorization to begin underground exploration and development work at Maria Luisa. With the approval in place, the Company plans to establish an underground decline system designed to reach gold-copper mineralized veins through multiple access points on multiple levels. The initial decline system will enter at the southwest corner of the property and advance in a southeast direction for approximately 350 metres to intersect the mineralized zone beneath the historical workings (Figure 1.).

CEO Alastair McIntyre commented "I am pleased the approval process for the Maria Luisa gold - copper project has been completed and we can now focus on the development phase. Historical work at Maria Luisa has yielded very good results including areas of past production where approximately 6.89 grams per tonne (g/t) gold and 1.89% copper were recovered. In addition, the relatively under-explored area to the NW, where a separate NS vein structure occurs has yielded underground chip samples of 8.73 grams per tonne gold over 5.74 m, provides us with an exciting new area to explore and develop."

Figure 1. Plan Map of Maria Luisa

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4303/96760_ab97686fb4e9c8cc_001.jpg

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4303/96760_ab97686fb4e9c8cc_001full.jpg

*Estimation of quantity and grade is conceptual in nature with insufficient work to define a mineral resource, and further exploration may or may not define a resource at Maria Luisa (M. Dufresne, NI 43-101 Technical Report, February 2017). In addition, a decision to commence underground exploration and development at the Maria Luisa site is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with this decision.

The design process involves accessing the northwest-southeast trending mineralized Au-Cu veins through crosscuts on 4 separate levels designed to create up to 8 mining faces (Figure 2.). The company plans to initially extract up to 3,000 tonnes of mineralized gold-copper material in Phase I with future opportunity to expand to 5,000 tonnes (see news release 14 June 2021). The development work will also be guided by a surface and underground drill program to assist with future grade control. The construction time is expected to be approximately 6 months with fully funded Phase 1 costs anticipated at US$600,000. During the construction/development phase, the company will have opportunity to extract Au-Cu mineralized bulk samples that can be sold to nearby processing plants to offset some of the development costs in advance of a full ramp up.

Figure 2. Underground Mine Model

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4303/96760_ab97686fb4e9c8cc_002.jpg

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/4303/96760_ab97686fb4e9c8cc_002full.jpg

The Company is currently finalizing a review process to select a contract miner for the construction and development of the decline. This process is expected to be completed in the next few weeks where work can begin immediately.

About Altiplano

Altiplano Metals Inc. (APN: TSX‐V) is a Canadian mining company focused on the acquisition and development of near-term cash flowing assets and exploration projects of significant scale. Altiplano's goal is to grow into a mid-tier producer of copper, gold and silver with immediate plans of generating profits from three cash flowing projects in 2021. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value.

John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed and approved the technical contents of this document.

Altiplano is part of the Metals Group of companies, managed by an award-winning team of professionals who stand for technical excellence, painstaking project selection and uncompromising corporate governance, with a proven ability to capitalize on investment opportunities and deliver shareholder returns.

ON BEHALF OF THE BOARD

/s/ "John Williamson"
Chairman

For further information, please contact:
Alastair McIntyre, CEO
alastairm@apnmentals.com
Tel: (416) 434 3799

Jeremy Yaseniuk, Director
jeremyy@apnmetals.com
Tel: (604) 773-1467

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. Any decision to commence production or begin underground development is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with any production decision. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/96760

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Copper wire.

Lobo Tiggre: Copper is My Highest-Confidence Trade for 2025 — Here's Why

Lobo Tiggre, CEO of IndependentSpeculator.com, gave the Investing News Network his updated thoughts on the US economy, as well as his outlook for gold, silver and uranium in 2025.

However, he said his highest-confidence trade for next year is copper.

"I think that it's easier to see — and highly likely to see — copper moving higher next year," Tiggre explained.

Keep reading...Show less
Large chunk of copper.

29Metals Shares Feasibility Study and Final Investment Decision for Gossan Valley Project

29Metals (ASX:29M) has announced a feasibility study and final investment decision for the Gossan Valley project at its Golden Grove volcanic-hosted massive sulphide mine in Western Australia.

The feasibility study is an update to the 2022 version of the document. It outlines production of 4,000 tonnes of copper and 20,000 tonnes of zinc annually at Gossan Valley over an initial mine life of seven years.

CEO James Palmer said the development of Gossan Valley is the "next logical development option" when it comes to moving forward at Golden Grove, which was first discovered in 1971.

Keep reading...Show less
Somerset Minerals Logo

Acquisition of High-Grade Copper Project Adjacent to White Cliff Minerals

Somerset Minerals Ltd (“Somerset” or the “Company”) (ASX:SMM) is pleased to advise that it has entered into a conditional agreement to acquire 100% of the issued capital of Sentinel Resources Pty Ltd (“Sentinel”), which, through its local subsidiary, holds the Coppermine Project (the “Project”) in Nunavut, Canada.

Importantly, the Coppermine Project hosts 1,055 km2 of the prospective Copper Creek Formation basalts, and is interpreted to include the strike extensions to White Cliff’s high priory targets of Vision, Stark, Thor and Rocket (Figure 2 & 3), with the prospectivity of the wider project area also supported by extensive surface sampling and historic exploration (Table 1). Importantly, Somerset holds the ground entirely around and along strike from White Cliff’s recently acquired Danvers prospect which contains a non-JORC or NI 43-101 resource of 4.16Mt @ 2.96% Cu.

Keep reading...Show less
US$100 bills.

Lundin Mining to Divest Neves-Corvo and Zinkgruvan Operations for US$1.52 Billion

Lundin Mining (TSX:LUN,OTC Pink:LUNMF) has entered a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden (STO:BOL) for up to US$1.52 billion.

The sale, announced by the company on Monday (December 9), will see Boliden acquire full ownership of Somincor, the company operating Neves-Corvo, as well as Zinkgruvan Mining Aktiebolag and its associated entities.

Lundin expects to receive upfront cash consideration of US$1.37 billion at closing, based on financial conditions as of August 31, 2024. Interest will accrue at 5 percent annually until the closing date.

Keep reading...Show less

Lundin Mining Announces Sale of Neves-Corvo and Zinkgruvan for Total Consideration of up to $1.52 Billion

Lundin Mining logo (CNW Group/Lundin Mining Corporation)

TSX: LUN) (Nasdaq Stockholm: LUMI) Lundin Mining Corporation ("Lundin Mining" or the "Company") announces today it has signed a definitive agreement to sell its Neves-Corvo operation in Portugal and Zinkgruvan operation in Sweden to Boliden AB (OM: BOL) ("Boliden") for up to $1.52 billion in total consideration (the "Transaction"). Unless otherwise stated, all numbers are presented in United States dollars.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Business handshake.

Rio Tinto and Sumitomo Partner to Advance Winu Copper-Gold Project

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) has signed a term sheet with Sumitomo Metal Mining (TSE:5713) for a joint venture to advance the Winu copper-gold project in Western Australia.

The partnership, announced on Wednesday (December 4), seeks to develop both companies’ exploration initiatives.

Sumitomo will acquire a 30 percent equity stake in the Winu project for US$399 million, including an initial payment of US$195 million and US$204 million in deferred considerations tied to project milestones and other conditions.

Keep reading...Show less

Latest Press Releases

Related News

×