Marvel Announces Phase II Drilling Follow-up at the KLR-Walker Uranium Project, Athabasca Basin

Marvel Announces Phase II Drilling Follow-up at the KLR-Walker Uranium Project, Athabasca Basin

Marvel Discovery Corp. (TSX-V:MARV)(Frankfurt:O4T)(OTCQB:MARVF); ("Marvel" or the "Company") is pleased to announce a Phase II follow-up drilling program at the DD and Highway Zone within the KLR-Walker Uranium Project ("the Property") in the Athabasca Basin (Figure 1). The Phase II drill program would consist of 4 holes totaling approximately 2,400 m. The start date of the program has yet to be determined. A total of 1,343 m was completed through 6 diamond drill holes in the spring of 2023 which intersected 841 ppm U3O8 over 1.07 m at the DD Zone and 553 ppm U3O8 over 1.89 m at the Highway Zone (see press release dated May 17, 2023

About the forthcoming program, Karim Rayani, Chief Executive Officer, commented, "The Company is extremely excited about the 2023 Phase II program. We have successfully followed up on historical surface and backpack uranium mineralization along key structures with Phase I. Our Phase II program is to test these structures and associated uranium mineralization at depth to unlock the potential presence of a Tier I uranium discovery."

Marvel Discovery Corp., Thursday, June 22, 2023, Press release picture
Figure 1. Highway North, Walker and KLR claim groups along the Key Lake Fault with prominent VTEM conductor trends.

Figure 1. Highway North, Walker and KLR claim groups along the Key Lake Fault with prominent VTEM conductor trends.

All uranium mineralization encountered in the Phase I drill program consisted of stringer mineralization coincident with a regional scale fault, the Key Lake Shear Zone. The Key Lake Shear is part of the Wollaston-Mudjactic Transition Zone ("WMTZ") of the eastern Athabasca Basin. The WMTZ hosts the highest-grade uranium mines in the world (Figure 2). Drilling during the Phase II program will target uranium mineralization down dip within the fault zones. Like its neighbor to the west, the Arrow Deposit, owned by NexGen Energy lies along a similar structural corridor as the Marvel properties. The Arrow Deposit1, which has undergone a Positive Feasibility Study with robust economics contains Probable Reserves of 239.6 million lbs of U3O8 at an average of 2.37% U3O8 and Measured and Indicated Resources of 256.7 million lbs at an average grade of 3.1% U3O8. The Arrow Deposit is the largest undeveloped uranium deposit in Canada.

Marvel Discovery Corp., Thursday, June 22, 2023, Press release picture
Figure 2. Location of the Walker- KLR Uranium Project in the WMTZ Zone, host to the highest-grade uranium deposits in the world.

Qualified Person

The technical content of this news release has been reviewed and approved by Mike Kilbourne, P.Geo., who is a Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.

References

Arrow Deposit1 https://www.nexgenenergy.ca/rook-1-project/default.aspx#feasibility-study

About Marvel Discovery Corp.

Marvel, listed on the TSX Venture Exchange for over 25 years, is a Canadian based emerging resource company. The Company is systematically exploring its extensive property positions in:

  • Newfoundland (Slip, Gander North, Gander South, Victoria Lake, Baie Verte, and Hope Brook - Au Prospects)
  • Atikokan, Ontario (BlackFly - Au Prospect)
  • Elliot Lake, Ontario (East Bull - Ni-Cu-PGE Prospect)
  • Quebec (Duhamel -Ni-Cu-Co prospect & Titanium, Vanadium, and Chromium Prospect)
  • Prince George, British Columbia (Wicheeda North - Rare Earth Elements Prospect)

The Company's website is: https://marveldiscovery.ca/

ON BEHALF OF THE BOARD
Marvel Discovery Corp.
"Karim Rayani"
Karim Rayani
President/Chief Executive Officer, Director
Tel: 604 716 0551 email: k@r7.capital

Disclaimer for Forward-Looking Information:

Certain statements in this release are forward-looking statements which reflect the expectations of management. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Forward-looking statements in this press release relate to, among other things: completion of the proposed Arrangement. Actual future results may differ materially. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. There is no assurance any of the conditions for closing will be met. Forward-looking statements reflect the beliefs, opinions, and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these times. Except as required by law, the Company does not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE:Marvel Discovery Corp.



View source version on accesswire.com:
https://www.accesswire.com/763153/Marvel-Announces-Phase-II-Drilling-Follow-up-at-the-KLR-Walker-Uranium-Project-Athabasca-Basin

News Provided by ACCESSWIRE via QuoteMedia

MARV:CA
The Conversation (0)
Marvel Discovery Acquires Strategic Ground In Elliot Lake, ON

Marvel Discovery Acquires Strategic Ground In Elliot Lake, ON

Marvel Discovery Corp. (TSX-V:MARV)(FRA:O4T)(OTCQB:MARVF) ("Marvel" or the "Company") is pleased to announce that it has acquired 100% of additional ground ("Pecors West") east of Elliot Lake to complement its East Bull Property. The additional land package of 805 hectares (ha) brings the land holdings in the area to a total of 6,157 ha. (Figure 1

The Pecors West property has the potential to host three unique styles of mineralization under the critical metals criteria:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Marvel Resumes Exploration of Gold Anomaly at Victoria Lake

Marvel Resumes Exploration of Gold Anomaly at Victoria Lake

Marvel Discovery Corp. (TSXV:MARV)(Frankfurt:O4T)(OTCQB:MARVF) ("Marvel" or the "Company") is pleased to announce that the Company is planning a till sampling exploration program at its Victoria Lake Property for Q2 2024. The project is being planned as a follow-up to reconnaissance till and soil sampling completed in 2023 that identified anomalous gold. The Victoria Lake Property is situated over more than 15 kilometres of the Victoria Lake Shear Zone (VLSZ), part of an extensive fault corridor within Central Newfoundland that Honsberger et al. (2022)1 identified as emerging as one of the most prospective orogenic gold domains in Atlantic Canada. The project will further follow up on the second highest regional gold-in-till sample identified by the Newfoundland Geoscience Atlas, which reported 785 ppb Au from a sample collected within Marvel's Victoria Lake project

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Marvel Completes Drilling at Duhamel, Nickel-Copper-Cobalt Project, North of Quebec City

Marvel Completes Drilling at Duhamel, Nickel-Copper-Cobalt Project, North of Quebec City

Marvel Discovery Corp. (TSX-V:MARV)(Frankfurt:O4T)(MARVF:OTCQB); ( "Marvel " or the "Company" ) is pleased to report that the Company has completed drilling operations on its Ni-Cu-Co and Ti-V-Cr Duhamel property (the " Property ") located 350 kilometers (km) north of Quebec City, QC (Figure 1

Karim Rayani, Chief Executive Officer , states , "We are thrilled with the results of our inaugural drill campaign at our Duhamel project. Every hole was successful in intersecting our interpreted target horizons -intersecting disseminated, semi-massive and/or massive sulfide zones. At this state we have decided to pause our drilling operations and now will focus our efforts on both field and desktop studies to help us gain a better understanding of both the genesis and structural setting of these exciting massive sulfide zones. While we wait for assays on all holes, we will be conducting low frequency Borehole and Surface Time Domain Electromagnetics to assist with future targeting areas. Our field geologist is most excited with these initial results and seeing mineralized textures suggestive of these sulfides being part of a much larger sulfide pool, and we eagerly anticipate the Geophysical results to help us vector towards the higher conductance and thicker sulfide zones."

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Marvel Closes Final Tranche of Private Placement

Marvel Closes Final Tranche of Private Placement

Marvel Discovery Corp. (TSXV:MARV)(FSE:O4T)(OTCQB:MARVF) (the "Company") announces that it has closed the final tranche of its previously announced non-brokered private placement (the "Private Placement") by issuing 2,525,000 non flow-through units (the "NFT Units") at $0.04 per NFT Unit for gross proceeds of $101,000 (the "Final Tranche

Each NFT Unit consists of one non flow-through share (an "NFT Share") and one share purchase warrant (a "Warrant"). Each Warrant entitles the holder thereof to acquire an additional NFT Share at an exercise price of $0.075 per NFT Share for a period of five years.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Marvel's CEO Issues Corporate Update Letter to Shareholders

Marvel's CEO Issues Corporate Update Letter to Shareholders

VANCOUVER, BC / ACCESSWIRE/ February 7, 2024 / Marvel Discovery Corp. (TSX-V:MARV)(Frankfurt:O4T)(MARVF:OTCQB); ( "Marvel " or the "Company" ) is pleased to report a corporate update letter in an address to shareholders from its Chief Executive Officer, Karim Rayani.

Dear Shareholders ,

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
ION Announces US$13.5M Joint Venture on Urgakh Naran, Corporate Updates and Update on Rare Earths Transaction

ION Announces US$13.5M Joint Venture on Urgakh Naran, Corporate Updates and Update on Rare Earths Transaction

Lithium ION Energy Limited (TSXV: ION) (FSE: ZA4) ("ION" or the "Company") is pleased to share that it has entered into a binding Joint Venture Agreement with SureFQ Ltd. ("SureFQ") for the advancement of the Urgakh Naran project in Mongolia, in which ION will continue to hold a 20% free carried interest through to commercial production.

Highlights:

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Agreement to Secure EUR2.5M in Funding

Altech Batteries Ltd Agreement to Secure EUR2.5M in Funding

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to advise that it is in the process of selling its land in Johor to help fund the ongoing development of the CERENERGY(R) battery project and the Silumina Anodes(TM) battery materials project, as well as to support general working capital requirements.

Highlights

- Altech, subject to receipt of shareholder approval, will have the ability to drawdown up to EUR2.5M in cash funding

- Agreement reached with major shareholder Deutsche Balaton AG to provide funding

- Funding to be provided as Bearer Bonds with interest payable at 7.0% per annum

- Bearer Bonds secured by Altech's Malaysian land

- Repayment of the Bearer Bonds anticipated to be from sale of Altech's Malaysian land

- Shareholder meeting to approve facility anticipated for late April 2025

The Company has also entered into a binding Bond Note Subscription Deed with its major shareholder Deutsche Balaton AG, under which Altech can drawdown up to EUR2.5M in cash in the form of interest-bearing Bearer Bonds.

This funding will allow Altech to progress with its projects without the dilutionary impact to shareholders of a capital raise via a share issue. The repayment of the Bearer Bonds is secured by Altech's Malaysian land and requires Altech shareholder approval, and a General Meeting is anticipated to be convened in late April 2025.

Key terms of the Subscription Agreement are as follows:

- Total Bearer Bond facility of up to EUR2.5M to be drawdown in EUR500K amounts with interest payable at 7.0% per annum.

- Altech shareholders approving the grant of security to Deutsche Balaton AG over its Malaysian land in accordance with any requirement of the ASX, or the ASX granting a waiver from any requirement of the listing rules to obtain shareholder approval.

- a Security and Security Trust Agreement has been entered into under which Altech's 100% owned subsidiary Altech Chemicals Sdn Bhd has pledged security over its Malaysian land as well as a guarantee of repayment of the Bearer Bonds.

- Repayment of Bearer Bonds by maturity date of 31 October 2026.

- Default clauses applicable standard for Subscription Deeds of this nature.

Altech has placed its Malaysian land in Johor on the market for sale. Proceeds from the sale of the land are expected to provide sufficient funds to enable the Bearer Bonds to be repaid in full.



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
SAGA Metals Extends Claims at the Radar Project by 26% to Cover 20km Inferred Oxide Zone

SAGA Metals Extends Claims at the Radar Project by 26% to Cover 20km Inferred Oxide Zone

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, announces the addition of 180 claims spanning 4,500-hectares, increasing the total size of the Radar Titanium-Vanadium (Ti-V) project from 17,250-hecatres to 21,750-hectares. This addition now encompasses the 20km inferred oxide zone starting from the 2025 Hawkeye drill program area heading west towards the new claim boundary.

Michael Garagan, CGO & Director of SAGA comments: "Important information garnered from the combined field & drill programs suggests the oxide layer zone at Hawkeye may be contiguous to Trapper and possibly as far as SAGA's claim extension. These additional claims were strategic in an effort to ensure we've secured the full extent of mineralization. The team will look to apply magnetic geophysical continuity over the entire ‘inferred layering zone of the Dykes River' intrusion. The recently completed drill program over the prospective Hawkeye zone is our proof of concept to a much larger system."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×