Lithium Universe Ltd  Becancour Lithium Refinery - Preliminary Feasibility Study

Lithium Universe Ltd Becancour Lithium Refinery - Preliminary Feasibility Study

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce the results of its Preliminary Feasibility Study( PFS) for the Becancour Lithium Carbonate Refinery in Quebec, Canada. The PFS confirms the viability of a strong lithium conversion project, even within a below-average pricing environment.

Highlights

The Lithium Universe Strategy

- Positive, robust Becancour Refinery PFS even in low pricing environment

- LU7 has a counter cyclical strategy - develop project, ready for price recovery

- Closing the Lithium Conversion Gap - growth in resource and end market projects

The Financial Modelling

- Economically viable with excellent pre-tax NPV8% of approximately US$779M

- IRR (pre-tax) of approximately 23.5% and payback of 3.5 years based on;

- Price forecast of US$1,170/t SC6 and US$20,970/t for battery grade Li2CO3

- Current spot price is approx. US$775/t SC6 and US$10,680/t for battery grade LC

- Operating costs at around US$3,976/tonne; capital cost estimate of US$494 million

- Expected annual revenue of approx US$383 million and EBITDA of around US$147 million

- Project break even at around US$780 /t (SC6) and around US$14,000 per tonne LC

The Design

- LU7 offers a solution to worldwide lithium conversion failures and startup problems

- Using proven Jiangsu Refinery operating technology and lithium industry experience

- Producing up to 18,270 tonnes/year of green battery-grade lithium carbonate

- Smaller off-the-shelf style plant rather than large difficult-to-operate facilities

- Initial focus on lithium carbonate production - feed for LFP batteries

- Assumptions based on real operating data and experience - not new aspirant

The Location

- Quebec ideal trans-Atlantic lithium conversion centre, comparable to China

- Feedstock from Canada, Brazil and Africa - end market North America

- Critical cost benefits - cheap green power, transport mine/end market savings, US/Canada tariffs

- 95% GHG emission reduction with Hydro Quebec's green energy

Next Steps

- Offtake discussions with interested OEMs underway

- LU7 continues to progress full Definitive Feasibility Study

The Company plans to build a reliable, low-risk lithium conversion refinery with an annual capacity of up to 18,270 tonnes, utilizing proven expertise from the Jiangsu processing model. The facility will produce environmentally friendly, battery-grade lithium carbonate. The Company aims to establish a Canadianbased lithium chemicals business, purchasing spodumene feedstock from both domestic suppliers and international markets, including Brazil and Africa and producing a battery grade lithium carbonate product. This aligns with the Company's broader vision of contributing to the North Atlantic lithium supply chain and closing the Lithium Conversion Gap.

The project's economics are highly favourable, even with conservative price assumptions. The refinery is economically viable with a pre-tax Net Present Value (NPV) of approximately US$779 million, using an 8% discount rate, and a pre-tax Internal Rate of Return (IRR) of around 23.5%. The payback period is estimated at 3.5 years. The financial model is built on cautious price forecasts of US$1,170 per tonne for spodumene concentrate (SC6) and US$20,970 per tonne for battery-grade lithium carbonate equivalent (LCE). LU7's directors believe they have a reasonable basis for using the assumed price in the study of US$20,970 per tonne for battery grade lithium carbonate. Key operational assumptions include 86% plant availability and 88% lithium recovery. At full production capacity, the project is expected to generate approximately US$383 million in annual revenue, with costs totalling around US$236 million, leading to an annual EBITDA of approximately US$147 million and a gross margin of in the region of 38%. Post-tax, the NPV at an 8% discount rate is estimated at approximately US$501 million. The capital cost for the project is estimated at US$494 million, which includes a contingency of US$68 million. The capital cost estimate is based on advanced design specifications from the Jiangsu Lithium Refinery model, ensuring robust financial planning and projection. These factors highlight the project's strong financial viability, even under conservative pricing conditions.

MANAGEMENT COMMENT

Lithium Universe Chairman, Iggy Tan said "The successful completion of our Preliminary Feasibility Study is a significant milestone for the company, especially given that we only launched in August of last year. Early on, we recognized that bridging the lithium conversion gap in North America, leveraging our accumulated lithium expertise and the proven technology from Jiangsu, was a clear and strategic path forward."

"Our counter-cyclical strategy is centered on advancing projects during market downturns, allowing us to strategically position ourselves for growth as the market rebounds. We are dedicated to funding and constructing a proven, low-risk lithium conversion refinery in Quebec, marking the first step toward establishing Quebec as the lithium conversion hub for the Transatlantic region."

"The strong NPV and returns for the project indicate an economically viable project. We will be looking to secure strategic partners at the project level to help fund the project. There is significant interest from OEMs with spodumene offtake supply seeking conversion outside of China, and discussions are already underway. We are confident that the Becancour lithium refinery, with an annual capacity of 18,270 tonnes, will emerge as a leader in producing green, battery-grade lithium carbonate."

"The Company will advance quickly to complete a Definitive Feasibility Study and finalise offtake partnerships".

COUNTER CYCLICAL STRATEGY

Leveraging experience with cyclical movements in the lithium market, Lithium Universe utilizes a counter-cyclical strategy focused on developing projects during market downturns to strategically position itself as the market recovers. Although the recent oversupply of lithium has resulted in price declines, the Company remains confident in the strong long-term demand for lithium, driven by the growing electric vehicle (EV) and energy storage sectors. This ongoing demand underscores the need for continued investment in lithium mining and refining projects. LU7 believes that the current market conditions provide an optimal window for project development. With falling and depressed prices, less viable projects and weaker players have been cleared out of the market, leaving space for more robust and well-prepared companies. By advancing its Becancour Lithium Carbonate Refinery during this downturn, LU7 aims to be ready for a price recovery and capitalize on future growth, ensuring its plac in the evolving lithium market.

Over the past four years, lithium prices have experienced significant fluctuations due to the expanding electric vehicle (EV) market and increased demand for energy storage. From 2020 to early 2022, prices surged as supply struggled to keep pace with demand driven by the global shift towards cleaner energy. By 2022, lithium carbonate and hydroxide prices had risen over 400%, influenced by COVID-19-related supply disruptions. As of late 2023, prices have begun to stabilize due to new mining and refining projects. Although recent oversupply has led to price declines, long-term demand for lithium remains strong, necessitating continued investment in mining and refining.

The lithium market is currently undergoing a rebalancing phase due to oversupply and strategic production shutdowns by major producers. Companies and operations such as Core Lithium, Greenbushes JV, Mineral Resources, Albemarle's Kemerton and more recently, CATL's Yichun mine and Arcadium's Mt Cattlin have either slowed production or halted operations in response to recent price drops. Despite these supply adjustments, demand for lithium remains robust, particularly from growing EV sales in China. LU7 believes that prices are expected to recover to more sustainable levels over the next 12-18 months, although not reaching the unsustainable peaks of 2021-2022. This market rebalancing is essential for the sustainability of future lithium projects and the overall market. LU7's counter-cyclical strategy means developing a project during market downturns to benefit when the market recovers.

CLOSING THE LITHIUM CONVERSION GAP

Currently, over 90% of global LFP battery manufacturing is concentrated in China, but North America is rapidly expanding its capacity. Ford plans to build a $3.5 billion factory in Michigan with an annual capacity of 35 gigawatt-hours (GWh) by 2026, while Tesla is developing a facility in Nevada with a 10 GWh capacity focused on improving charging speed and energy density. LG Energy Solutions is investing $5.6 billion in Arizona to produce LFPs for energy storage systems and EVs.

By 2028, North America is expected to add nearly 1,000 GWh of battery manufacturing capacity, supporting the production of 10 to 13 million electric vehicles annually. Key states like Georgia, Kentucky, and Michigan will lead this growth. Canada is also investing in the sector, with partnerships from Volkswagen, Stellantis, and others, helping to secure its position in the global automotive market and meet the rising demand for EVs.

The Company estimates that 850,000t of LCE per annum will be required to satisfy demand in North America by 2028.

*To view the full details of the announcement, please visit:
https://abnnewswire.net/lnk/WY641GJW



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd



Contact:
Alex Hanly
Chief Executive Officer
Lithium Universe Limited
Tel: +61 448 418 725
Email: info@lithiumuniverse.com

Iggy Tan
Chairman
Lithium Universe Limited
Email: info@lithiumuniverse.com

News Provided by ABN Newswire via QuoteMedia

LU7:AU
Lithium Universe

Lithium Universe Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Lithium Universe (ASX:LU7)

Lithium Universe


Keep reading...Show less
Lithium Universe Ltd  Quebec Carbonate Interview

Lithium Universe Ltd Quebec Carbonate Interview

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce that its Chairman, Iggy Tan, recently participated in an interview titled "Quebec Carbonate" on the Rock Stock Channel Podcast.

The interview emphasises the Company's strategic choice to focus on lithium carbonate over hydroxide, reflecting shifting market demand towards safer and cheaper lithium iron phosphate (LFP) batteries. Mr Tan outlines the competitive advantages of Quebec for lithium processing, including access to inexpensive hydro power, lower labor costs (vs Australia), proximity to mines, and favourable tariff conditions. He reports strong financial projections of the Company's PFS based on conservative pricing assumptions, indicating a robust internal rate of return and payback period for their operations.

The interview underscores the urgency and growth potential for lithium supply chains outside of China, positioning Lithium Universe as a key player in this sector.

To view the Interview, please visit:
https://www.abnnewswire.net/lnk/15Y6K65C



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Settlement of Tranche 1 Share Placement

Lithium Universe Ltd Settlement of Tranche 1 Share Placement

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce that further to its announcement dated 31 October 2024 (LU7 Completes Share Placement and Launches Entitlement Offer) (Announcement), it has now settled the first tranche of its share placement to sophisticated and professional investors (Tranche 1).

Highlights

- Successful settlement of Tranche 1 of the share placement to sophisticated and professional investors, raising $1.94 million

- Entitlement Offer to open to shareholders on 11 November 2024

- Tranche 2 of the Placement (subject to shareholder approval) is anticipated to be completed on or around 9 December 2024, raising $0.20 million

- Funds will be predominately used to further progress the Definitive Feasibility Study and the payment of the Becancour land option costs

Tranche 1 under the Company's Placement comprised of 161,791,667 fully paid ordinary shares (Shares), which have been issued today under the Company's existing capacities under Listing Rules 7.1 (15% capacity) and 7.1A (10% capacity). The Shares were issued at a price of A$0.012 per share, raising A$1,941,500. In addition, subject to shareholder approval, the Tranche 1 investors will be entitled to one new option for every share subscribed to, with an expiry date of 12 January 2026 and an exercise price of $0.03 (Options).

As detailed within the Announcement, the Company advised that it would be conducting an additional placement to sophisticated and professional investors, which will be subject to shareholder approval (Tranche 2), as well as a pro-rata 1 for 10 non-renounceable entitlement offer (Entitlement Offer). Investors under the Tranche 2 placement and Entitlement Offer will also receive options on the same term as the Tranche 1 investors.

Tranche 2 Placement

The Tranche 2 placement comprises of 16,666,667 shares, with the issue of such shares being subject to shareholder approval. The Company will seek shareholder approval at an upcoming general meeting, which is scheduled to be held on or around Monday, 9 December 2024.

Entitlement Offer

The Entitlement Offer will open on Monday, 11 November 2024 and has been made under a transaction-specific prospectus that was lodged with ASIC and ASX on 1 November 2024.



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Quarterly Activities Report

Lithium Universe Ltd Quarterly Activities Report

Melbourne, Australia (ABN Newswire) - Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) recently announced the results of its Preliminary Feasibility Study( PFS) for the Becancour Lithium Carbonate Refinery in Quebec, Canada. The PFS confirms the viability of a strong lithium conversion project, even within a below-average pricing environment.

The Company plans to build a reliable, low-risk lithium conversion refinery with an annual capacity of up to 18,270 tonnes, utilizing proven expertise from the Jiangsu processing model.

The facility will produce environmentally friendly, battery-grade lithium carbonate. The Company aims to establish a Canadian-based lithium chemicals business, purchasing spodumene feedstock from both domestic suppliers and international markets, including Brazil and Africa and producing a battery grade lithium carbonate product.

This aligns with the Company's broader vision of contributing to the North Atlantic lithium supply chain and closing the Lithium Conversion Gap. The project's economics are highly favourable, even with conservative price assumptions. The refinery is economically viable with a pre-tax Net Present Value (NPV) of approximately US$779 million, using an 8% discount rate, and a pre-tax Internal Rate of Return (IRR) of around 23.5%.

The payback period is estimated at 3.5 years. The financial model is built on cautious price forecasts of US$1,170 per tonne for spodumene concentrate (SC6) and US$20,970 per tonne for battery-grade lithium carbonate equivalent (LCE).

LU7's directors believe they have a reasonable basis for using the assumed price in the study of US$20,970 per tonne for battery grade lithium carbonate. Key operational assumptions include 86% plant availability and 88% lithium recovery.

At full production capacity, the project is expected to generate approximately US$383 million in annual revenue, with costs totalling around US$236 million, leading to an annual EBITDAof approximately US$147 million and a gross margin of in the region of 38%. Post-tax, the NPV at an 8% discount rate is estimated at approximately US$501 million.

The capital cost for the project is estimated at US$494 million, which includes a contingency of US$68 million. The capital cost estimate is based on advanced design specifications from the Jiangsu Lithium Refinery model, ensuring robust financial planning and projection.

These factors highlight the project's strong financial viability, even under conservative pricing conditions.

*To view the full quarterly report, please visit:
https://abnnewswire.net/lnk/CFSD11IG



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Completes Share Placement and Launches Entitlement Offer

Lithium Universe Ltd Completes Share Placement and Launches Entitlement Offer

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce the following Placement.

Highlights

- Binding commitments received to raise $2.14 million

- Launch of pro-rata Non-Renounceable Entitlement Offer to raise $1.02 million

- Issue price of the Placement and Entitlement Offer is $0.0125 per share

- A total of $3.16 million in capital raising

- Participants in Placement and Entitlement Offer to receive free attaching options

- On the basis of 1 option for every 1 share issued with exercise price of $0.03 and expiry date of 12 January 2026

- Tranche 2 Shares and all Options to be issued under the Placement are subject to shareholder approval

- Funds will mainly be used to complete the Becancour Lithium Refinery DFS

- Maintains momentum, closer to establishing a lithium refinery in Becancour

Placement

The Company has received binding commitments from sophisticated and professional investors pursuant to a placement to raise $2.14 million by the issue of 171,320,000 fully paid shares ("Shares") at an issue price of $0.0125 per Share ("Placement"). The Placement is to be undertaken in two tranches:

- Tranche 1: issuing 155,320,000 Shares raising $1,941,500; and

- Tranche 2: issuing 16,000,000 Shares and raising $200,000, to be approved at a shareholders meeting, expected to be 9 December 2024 ("Shareholders Meeting").

The issue date of the Tranche 1 Placement Shares is to take place on 8 November 2024.

Participants in the Placement will also receive, subject to shareholder approval (to be undertaken at the Shareholders Meeting), free attaching options on the basis of one (1) option for every one (1) share issued, with each option having an exercise price of $0.03 and expiry date of 12 January 2026 ("Options"). The Company intends to list the Options as soon as possible. The issue of the Tranche 1 Placement Shares will be made out of the Company's existing placement capacity under Listing Rule 7.1 and 7.1A.

Included in the Tranche 2 Placement is an amount of $90,000 from Iggy Tan, Patrick Scallan and Gernot Abl.

The share issues will also be subject to shareholder approval at the forthcoming shareholders meeting.

The Placement was jointly managed by SP Corporate Advisory (Joint Lead Manager), Ignite Equity (Joint Lead Manager), and GBA Capital (Co-Manager). The costs associated with the Placement was a 6% fee on all funds raised.

Executive Chairman, Mr Iggy Tan stated "We are pleased with the outcome of the Placement in a challenging market, which reaffirms support for the Company's strategy to complete the Definitive Feasibility Study for the Becancour Lithium Refinery. On September 30, 2024, the Company reached a significant milestone, having released the positive and robust Preliminary Feasibility Study, displaying strong fundamentals despite the current low lithium pricing environment.

The Company is highly committed to our shareholders, and I am pleased we can offer them the same investment terms extended to sophisticated and professional investors. The Board and Management Team remains dedicated to engaging with our existing shareholders and delivering against our strategy. If fully subscribed, proceeds from the Placement and Entitlement Offer will strengthen our balance sheet, bringing us closer to establishing an operational lithium conversion plant in Becancour, Quebec."

*To view full details of the Entitlement Offer, please visit:
https://abnnewswire.net/lnk/L4NB5291



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Proposed issue of securities - LU7

Lithium Universe Ltd Proposed issue of securities - LU7

Melbourne, Australia (ABN Newswire) -



About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  CERENERGY Battery Project Funding Update

Altech Batteries Ltd CERENERGY Battery Project Funding Update

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce an update on funding of the CERENERGY(R) sodium-chloride solid-state battery project in Saxony, Germany.

Highlights

- Financing plan and target structure in place

- Funding investment teaser documents and data room established

- Reach out to 10 commercial banks and 2 venture debt funds - all positive interests

- Shortlisting potential lead bank

- Equity Funding - potential sale of minority interest of the project to realise capital and strategic value

- Discussions and draft term sheets shared with investors

- Offtake agreement LOI signed with ZISP

On 14 June 2024, the Company, through its Germany subsidiary Altech Batteries GmbH ("ABG"), announced the appointment of global big four professional services firm ("funding adviser") to assist in securing finance for the construction of Altech's 120MWh CERENERGY(R) battery manufacturing plant in Germany. The project's financing strategy is structured across three key areas: debt, equity, and grants.

These sources will cover not only the capital expenditures but also financing costs, working capital, debt service coverage, and an additional contingency for potential business interruptions, See Figure 1*.

DEBT PROCESS

A funding invitation document (investment teaser) has been finalised and distributed to various financial institutions for debt funding in the project. The Group has engaged ten commercial banks and two venture debt funds in a first market round, receiving predominantly positive initial feedback. Several of these institutions have expressed strong interest in participating in the financing. The Group is now in the process of shortlisting potential lenders to identify the most suitable financial partners for the project. To support a thorough due diligence process, a secure data room has been set up, providing detailed project information to interested financiers and ensuring full transparency. The DFS financial model has been adjusted to stress-test various funding scenarios tailored to the lending institutions ABG has engaged with. Further steps involve determining the most suitable banks to form a syndicate and appointing a lead bank to guide the lending process. This syndicate will play a crucial role in structuring the financing arrangement to meet the project's requirements.

EQUITY FUNDING

In addition to ongoing debt financing efforts, the Group has engaged several equity advisers to support the equity component of the project's funding package. As part of this strategy, the Altech Group plans to divest a minority interest in the project to one or two strategic investors. This partial divestment aims to attract investors who can bring not only capital, but also strategic value to the project, aligning with the CERENERGY(R) project's long-term growth and sustainability objectives.

The Group is specifically targeting large utility groups, data centre operators, investment funds and corporations that are heavily involved in the green energy transition. These entities are seen as ideal partners due to their strong alignment with the project's focus on sustainable energy solutions, as well as their capacity to provide substantial financial backing.

To date, significant progress has been made in these equity discussions. Several Non-Disclosure Agreements (NDAs) have been signed, allowing for deeper engagement with prospective investors. Altech has also circulated draft term sheets to a number of interested parties, outlining the proposed terms and conditions for investment. These documents serve as a starting point for negotiations, paving the way for more detailed discussions regarding the potential equity stake and partnership structure.

The strategic decision to divest a portion of the project is aimed at reducing the overall financial burden on the Company while bringing in experienced partners who can contribute to the project's success. By securing both the equity and debt components, the Company aims to finalise the full financing package, ensuring the timely construction and commissioning of the CERENERGY(R) battery plant. The next steps will focus on advancing these discussions and converting interest into formal commitments, which are crucial for moving forward with the project.

OFFTAKE ARRANGEMENTS

On 13 September 24, Altech announced the execution of an Offtake Letter of Intent between Zweckverband Industriepark Schwarze Pumpe (ZISP) and Altech Batteries GmbH. Under this Offtake Letter of Intent (LOI), ZISP will purchase 30 MWh of energy storage capacity annually, consisting of 1MWh GridPacks, for the first five years of production. The price of these batteries has been agreed and aligns with the sales price contained within Altech's Definitive Feasibility Study. The purchase of these batteries is subject to performance tests, battery specifications and the batteries meeting customer requirements. This offtake LOI constitutes an important aspect of the financing process. This lays the foundation for additional offtake arrangements, which are currently in progress. These agreements are vital for advancing our financing and construction timelines for the CERENERGY(R) project.

CEO and MD Mr Iggy Tan stated "The funding stage of any project is the most complex and challenging process of any project. Securing a big four funding adviser with expertise and a global network is a major step in our financing efforts. Altech is advancing both debt and equity discussions, along with offtake agreements, to fully fund the CERENERGY(R) project. We are seeing strong interest, especially from European banks and potential equity partners".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/PO741A78

To view MD Iggy Tan explain the Funding, please visit:
https://www.abnnewswire.net/lnk/23705649



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. (CSE: EPR) ("E-Power" or the "Company") announces that it has closed a third and final tranche of the private placement previously announced on September 24, 2024 (the "Private Placement"). The oversubscribed private placement was originally announced for $420,000, but a total of $526,264 was raised in all three tranches.

An aggregate of 3,150,000 units (the " Units") of the Company were issued in the third and final tranche at a price of $0.05 per Unit for gross proceeds of $157,500, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date. (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Mawson Finland Limited Presents Downhole EM  Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited Presents Downhole EM Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce results from downhole electro-magnetic "DHEM" geophysical surveys conducted at the Rajapalot gold-cobalt project in Finland

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - EDDY

Canadian Investment Regulatory Organization Trade Resumption - EDDY

Trading resumes in:

Company: Edison Lithium Corp.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Corp. (TSXV: EDDY) (OTC Pink: EDDYF) (FSE: VV0) ("Edison" or the "Company") is pleased to announce that, effective November 12, 2024, it has accepted a non-binding purchase offer letter from Mava Gasoil LLC ("Mava"), a corporation based in Houston Texas, for the sale of 100% of the interest in the Company's Argentina subsidiary, Resource Ventures S.A. ("ReVe"), in consideration for USD$3,500,000. One of the LEXI claims owned by ReVe and the royalties on that mining property, and the PINAC mining properties owned by ReVe are excluded from the sale and will be retained by Edison.

ReVe controls the rights to prospective lithium brine claims in the province of Catamarca, Argentina. The claims are principally located in the two geologic basins known as the Antofalla Salar and the Pipanaco Salar. ReVe's assets on closing of the disposition to Mava will include 30 mining concessions covering approximately 104,538 hectares area in Catamarca Province, Argentina. The Company will retain and focus its Argentinian efforts on 8 mining concessions covering approximately 35,000 hectares area in Catamarca Province, Argentina, which are not subject to the sale and amount to approximately 25% of the claims currently held by ReVe.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe

Lithium Universe Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×