
Jindalee will be attending the PDAC Convention in Toronto, Canada over 2-5 March 2025
Jindalee will present to a North American investor audience at Redcloud's 13th annual Pre-PDAC Mining Showcase in Toronto over 27-28 February 2025
With compelling economic metrics demonstrated through its new prefeasibility study, Jindalee Lithium’s McDermitt Project presents a strong case for investors to gain exposure to this critical mineral and participate in the global clean energy transition.
Jindalee Lithium (ASX:JLL,OTCQX:JNDAF) is an Australia-based pure-play US lithium company focused exclusively on its 100-percent-owned McDermitt Lithium Project, currently one of the largest lithium deposits in the US, boasting a resource of 21.5 million tons (Mt) of lithium carbonate equivalent (LCE).
Backed by a newly released (November 2024) prefeasibility study (PFS) demonstrating very compelling economics, the McDermitt Project is poised to play a crucial role in meeting North America’s growing lithium demand for the lucrative battery value chain.
As the US continues to transition to energy independence, demand for lithium is expected to exponentially increase. Jindalee’s McDermitt Project, located in southeast Oregon, is a game-changer for North American lithium supply, critical for meeting the demands of the fast-growing electric vehicle, energy storage and defense sectors.
McDermitt also stands to significantly benefit from the US government’s policies and incentives to boost domestic supply of critical resources. In fact, in a move that signifies the US government's support of the McDermitt Lithium Project, the US Department of Energy's Ames National Laboratory signed a Cooperative Research and Development Agreement with Jindalee's subsidiary HiTech Minerals to develop cutting-edge extraction methods for the McDermitt Project. The Ames National Laboratory spearheads the DOE's Critical Materials Innovation Hub.
Key milestones in the US lithium resource space also provide significant insights into the future prospects for Jindalee’s project. Lithium Americas (TSX:LAC), for instance, has received a total of US$945 million investment from General Motors, which will fund the development, construction and operation of the Thacker Pass project in Humboldt County, Nevada. In October 2024 LAC closed a $2.3 billion loan from the US Department of Energy and in April 2025 announced the Final Investment Decision for Thacker Pass following a $250 million investment from Orion Resource Partners.
Another lithium resource developer in Nevada, Australia-based Ioneer (ASX:INR) has closed a US$996 million loan guarantee from the US Department of Energy to finance the development of its flagship Rhyolite Ridge lithium-boron project.
The US government has taken further action to bolster domestic critical mineral production. On 20 March 2025, President Trump issued a significant executive order titled "Immediate Measures to Increase American Mineral Production", underscoring the urgency and strategic imperative of increasing domestic supply chains for critical minerals. This order builds on previous initiatives by fast-tracking the permitting processes, prioritizing access to mineral-rich federal lands, clarifying regulatory frameworks, and mobilizing substantial financial resources – including Defense Production Act (DPA) funds – towards domestic mineral projects.
As one of the largest lithium resources in the US and situated on federal lands, Jindalee’s McDermitt Lithium Project stands to potentially benefit from these accelerated permitting processes and enhanced government support mechanisms. The clear commitment demonstrated by the US administration highlights the critical strategic advantage of domestically located mineral assets such as McDermitt, reinforcing its importance in securing robust domestic supply chains, essential for energy security
These are just a few examples of current market dynamics that point to a rapidly accelerating lithium resource development in the US.
An experienced management team, with the right blend of experience and expertise in geology, corporate administration and international finance, leads Jindalee to fully capitalize on the potential of its assets.
The economic metrics revealed in the PFS paint a compelling picture of the McDermitt Lithium Project's potential:
Production Capacity: The Project is set to produce 1.8 Mt of battery-grade lithium carbonate over its first 40 years, with an annual output forecast of 47,500 tons per annum (tpa) in the initial 10 years, tapering to 44,300 tpa over the first 40 years.
Financial Metrics: The Project boasts a net present value (NPV) of US$3.23 billion at an 8 percent discount rate, with an internal rate of return (IRR) of 17.9 percent. These figures underscore the Project’s strong economic viability.
Payback Period: Investors can expect a payback period of less than five years, a relatively short timeframe for a project of this magnitude.
Break-even Price: The break-even NPV price is approximately US$14,600/t of lithium carbonate, providing a buffer against market fluctuations.
The PFS estimates a total project cost of US$3.02 billion, which includes a prudent 21 percent contingency margin. This substantial investment is balanced by impressive profitability projections, including an EBITDA margin of 66 percent generating post-tax free cash flow of US$6.6 billion during the first decade of operations. With a pre-tax net operating cashflow margin of 17 percent at current spot prices, McDermitt shows strong cash generation potential.
These financial indicators suggest that McDermitt is not only economically viable but potentially highly profitable, positioning it as an attractive prospect for investors and strategic partners alike.
The McDermitt Project is located in Malheur County on the Oregon-Nevada border and is approximately 35 kilometres west of the town of McDermitt. The 100-percent-owned asset covers 54.6 square kilometres of claims at the northern end of the McDermitt volcanic caldera.
The Project is characterized by its unique sedimentary lithium deposits, primarily composed of lithium-bearing clays, a geological formation that sets McDermitt apart from many other lithium projects worldwide. This sedimentary nature of the deposit offers several advantages:
The lithium-rich clays at McDermitt are part of a broader geological context that includes volcanic tuffs and sedimentary rocks. This geological setting is indicative of a complex depositional history, which has resulted in the concentration of lithium in economically viable quantities.
The 2023 mineral resources estimate (MRE) for the McDermitt Project contains a combined indicated and inferred mineral resource inventory of 3 billion tons at 1,340 parts per million (ppm) lithium for a total of 21.5 Mt LCE at 1,000 ppm cut-off grade.
Ian Rodger is a qualified mining business executive with almost 15 years of experience in various roles including as a mining engineer for Rio Tinto across two large greenfield mine developments, before successfully transitioning into mining corporate finance where he held Executive and Director positions at RFC Ambrian overseeing origination and management of numerous mandates across a range of corporate advisory roles. Rodger was the project director for Oz Minerals (ASX:OZL) where he made significant contributions to successfully define the value potential of the West Musgrave nickel/copper province through the delivery of a portfolio of growth studies. Most notably, he led technical, market and partnership development workstreams, successfully confirming value potential for producing an intermediate Nickel product for the battery value chain.
Rodger holds a Bachelor of Mining Engineering from the University of Queensland, a Masters of Mineral Economics from Curtin University and is also a graduate of the Australian Institute of Company Directors and member of the Australasian Institute of Mining and Metallurgy.
Lindsay Dudfield is a geologist with over 40 years of experience in multi-commodity exploration, primarily within Australia. He held senior positions with the mineral divisions of Amoco and Exxon. In 1987, he became a founding director of Dalrymple Resources NL and spent the following eight years helping acquire and explore Dalrymple’s properties, leading to several greenfield discoveries. In late 1994, Lindsay joined the board of Horizon Mining NL (Jindalee Lithium’s predecessor) and has been responsible for managing Jindalee Lithium since inception. Lindsay is a member of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists, the Geological Society of Australia and the Society of Economic Geologists. He is also a non-executive director of Jindalee spin-out companies Energy Metals (ASX:EME), Dynamic Metals (ASX:DYM) and Alchemy Resources (ASX:ALY).
Wayne Zekulich was appointed to the board as Chair on 1 February 2024. He holds a Bachelor of Business and is a fellow of the Institute of Chartered Accountants. Zekulich is a consultant and non-executive director who has substantial experience in advising, structuring and financing transactions in the infrastructure and resources sectors. He was previously the head of Rothschild in Perth, chief financial officer of Gindalbie Metals Limited, chief development officer of Oakajee Port and Rail and a consultant to a global investment bank. Currently, he is chair of Pantoro (ASX:PNR) and non-executive director of the Western Australian Treasury Corporation. In the not-for-profit sector, he is the past chair of the Lester Prize and is a mentor in the Kilfinan program.
Darren Wates is a corporate lawyer with over 23 years of experience in equity capital markets, mergers and acquisitions, resources, project acquisitions/divestments and corporate governance gained through private practice and in-house roles in Western Australia. Wates is the founder and principal of Corpex Legal, a Perth-based legal practice providing corporate, commercial and resources related legal services, primarily to small and mid-cap ASX listed companies. In this role, he has provided consulting general counsel services to ASX listed company Neometals (ASX:NMT), having previously been employed as legal counsel of Neometals. Wates holds Bachelor's degrees in Law and Commerce and a Graduate Diploma in Applied Finance and Investment.
Paul Brown has over 23 years of experience in the mining industry, most recently with Mineral Resources (ASX:MIN) where he was chief executive – lithium, and chief executive – commodities. Brown has held senior operating roles with Leighton, HWE and Fortescue (ASX:FMG) and has a strong track record in technical leadership, project/studies management, and mine planning and management. Brown is currently CEO of Core Lithium (ASX:CXO). He holds a Master in Mine Engineering.
Game-changing, economically significant lithium resource for North American battery supply chain
Jindalee will be attending the PDAC Convention in Toronto, Canada over 2-5 March 2025
Jindalee will present to a North American investor audience at Redcloud's 13th annual Pre-PDAC Mining Showcase in Toronto over 27-28 February 2025
Redcloud is a Canadian-based investor relations group specialising in the junior resources sector
Jindalee Lithium Limited (ASX: JLL) (OTCQX: JNDAF) (Jindalee, the Company) is pleased to announce that the Company will participate in both the Prospectors and Developers Association of Canada (PDAC) Convention and the Pre-PDAC Mining Showcase, hosted by Redcloud Financial Services Inc. (Redcloud), a globally oriented resource focused financial services platform.
Jindalee can be found at booth 2606 in the Investors Exchange Exhibition Room at the PDAC Convention which will be attended by Jindalee's Chief Executive Officer, Ian Rodger. PDAC, regarded as one of the world's premier resources conferences, will run from Sunday, 2 March 2025 until Wednesday, 5 March 2025 at the Metro Toronto Convention Centre in Ontario, Canada.
Jindalee is also participating in Redcloud's Pre-PDAC Mining Showcase at the Omni King Edward Hotel in Toronto over Thursday 27 and Friday, 28 February 2025. Ian will be presenting at the Pre-PDAC Mining Showcase at 4.00pm local time on Friday, 28 February 2025. Jindalee will also be available to engage with investors in one-on-one meetings at the Pre-PDAC Mining Showcase and encourages interested investors to register for the event.
Jindalee looks forward to updating the North American mining and investment communities on progress at its 100% owned McDermitt Lithium Project which hosts one of the largest lithium resources in the U.S. The Pre-Feasibility Study at McDermitt, released in November 2024, outlines a highly robust multi-generational battery chemicals project1.
To register for the PDAC Convention visit here: https://pdac.ca/convention-2025/attending-2025/registration-2025
For more information and to register for the Pre-PDAC Conference please visit: https://redcloudfs.com/prepdac2025/
Authorised for release by the Jindalee Board of Directors. For further information please contact:
LINDSAY DUDFIELD | IAN RODGER |
Executive Director | Chief Executive Officer |
T: + 61 8 9321 7550 | T: + 61 8 9321 7550 |
E: enquiry@jindaleelithium.com | E: enquiry@jindaleelithium.com |
Â
About Jindalee
Jindalee Lithium is an Australian company focused on developing the McDermitt Lithium Project, one of the largest lithium resources in the U.S. With 100% ownership and unencumbered offtake rights, Jindalee is strategically positioned to support America's energy security and domestic supply of critical minerals. The Company recently completed a Pre-Feasibility Study (PFS) confirming McDermitt's scale, long-life, and low-cost production potential, with strong engagement from U.S. government agencies, including the Department of Energy and Department of Defense. As a deeply undervalued lithium developer, Jindalee presents a compelling investment opportunity ahead of the next lithium market upcycle.
Competent Persons Statement
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market announcements by Jindalee Lithium Limited referenced in this report and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee Lithium Limited's (Jindalee's) current expectations, estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee's future performance. When used in this document, the words such as "anticipate", "could", "plan", "estimate", "expects", "seeks", "intends", "may", "potential", "should", and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
________________________
1Jindalee Lithium ASX announcement 19/11/2024: "McDermitt Lithium Project Pre-Feasibility Study"
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/241723
News Provided by Newsfile via QuoteMedia
Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to announce the final drill results from its 2025 maiden drill program at the Radar Ti-V-Fe Property, located near the port of Cartwright in Labrador, Canada. The Property comprises 24,175-hectares and entirely encloses the Dykes River mafic layered intrusive complex.
Saga Metals Confirms Technical Success with the Drill:
Key drill intercepts from HEZ-06, HEZ-02 & HEZ-03 (final 3 holes of the 7-hole program) include:
Description | DDH | FROM | TO | Length | Fe | TiO2 | V205 |
ID | m | m | m | % | % | % | |
Highest Grade intercept | HEZ-06 | 265 | 293 | 28 | 20.11 | 4.22 | 0.214 |
Entire Hole | HEZ-06 | 1.8 | 293 | 291 | 13.55 | 3.26 | 0.101 |
Layering Sequence | HEZ-06 | 131.5 | 293 | 162 | 14.93 | 3.15 | 0.127 |
Highest Grade intercept | HEZ-02 | 167 | 204 | 37 | 12.40 | 4.17 | 0.069 |
Entire Hole | HEZ-02 | 1.5 | 300 | 298.5 | 12.03 | 3.37 | 0.069 |
Layering Sequence | HEZ-02 | 39.5 | 62.2 | 22.7 | 15.130 | 3.43 | 0.103 |
Highest Grade intercept | HEZ-03 | 178 | 233 | 55 | 11.37 | 4.07 | 0.051 |
Entire Hole | HEZ-03 | 4 | 233 | 229 | 13.12 | 3.35 | 0.079 |
Table 1: Composite grades of HEZ-06, HEZ-02, & HEZ-03
"The Dykes River Intrusion is a layered mafic intrusion. Our initial 7 diamond drill holes comprised 4 holes that tested the semi-massive to massive vanadiferous titanomagnetite layers and 3 holes that were sited mostly above and to the south of the magnetite layers. The 3 holes reported herein will facilitate a complete sampling of the entire intrusive layering sequence. These seven successful drill holes test a highly mineralized zone, confirming the extraordinary potential lying within our 20 km of high magnetic responses and titanomagnetite layers," commented Michael Garagan, CGO & Director of Saga Metals .
Interpretation of the Drill Results for HEZ-06, HEZ-02 & HEZ-03:
HEZ-06, HEZ-02 & HEZ-03 were all drilled within the hangingwall of the oxide layering zones. These layering intercepts bracketed the oxide layering intersected in HEZ-01, HEZ-04, HEZ-05 & HEZ-07, which intercepted the main layers of the titanomagnetite mineralization.
These last three drill holes complete the evaluation over the cross section of the entire magnetic anomaly drilled during this program, which has allowed the team to isolate four separate magmatic layers across the zone of mineralization, which is mappable and trackable. These consistent brackets of VTM mineralization will be the focus of SAGA's efforts for both mapping and metallurgical purposes.
Next Steps for the Radar Project:
The Radar Project has completed its first critical steps with the proof-of-concept 2025 winter drill program, which highlights the significance of the correlation between surface samples, geophysics, and drilling. SAGA is now targeting its other magnetic anomalies across the Property, all of which are larger than the one recently drilled.
Next steps to quickly delineate drill targets will involve completing detailed ground geophysics over the main regional airborne magnetic anomalies, as shown in Figure 2 below. In conjunction with ground-based geophysics over the priority anomalies, SAGA plans to execute a property-wide high-resolution aeromagnetic survey to locate high-priority drilling targets.
Additionally, SAGA has initiated a metallurgy and petrography analysis on the core from the Hawkeye zone. This work will determine the recoverable vanadiferous magnetite and the quality of potential concentrates.
Lastly, SAGA will conduct alternate whole-rock analyses to delineate secondary mineralization of phosphate, manganese, and scandium, as well as certain REE that are prospective in this large mafic layered intrusion.
Drilling Highlights to Date:
(Click here to see SAGA's news release dated May 5, 2025 for full details on holes HEZ-01 & HEZ-04 and here to see SAGA's news release dated May 26, 2025 for full details on holes HEZ-05 & HEZ-07)
Figure 1: 500m strike by 350m width magnetic anomaly drilled in winter 2025 program. (2024 Saga Metals. TMI Magnetic Survey). Shows DDH collars and Lithologies.
Radar Ti-V-Fe Property Overview:
The Company's 100%-owned Radar Property is located 10 km from the coastal city of Cartwright, Labrador, benefiting from tremendous infrastructure, including road access, deep-water port, airstrip and nearby hydro-electric power. The Radar Property comprises 24,175-hectares and entirely encloses the Dykes River intrusive complex.
The Dykes River intrusive complex is a recently recognized Mesoproterozoic layered mafic intrusion (Gower, 2017). It has gained attention due geological similarities to large AMCG-type intrusions and a very extensive titanium–vanadium–iron (Ti-V-Fe) rich layer.
The 2025 drill program confirmed massive to semi-massive oxide layering, hosting titanium and vanadium mineralization, representing only 1/40 th of the approximately 20km long oxide layering zone identified at the Radar project. The geological context identified by Dr. Al Miller's petrographic studies has substantially advanced understanding of the Radar deposit. These findings indicate a titanomagnetite mineralization system which is advantageous for simplified metallurgical processing and potentially improved economic outcomes.
Figure 2: Radar Property map, depicting aeromagnetic anomalies, oxide layering and the site of the 2025 drill program. The Property is well serviced by road access and is conveniently located near the town of Cartwright, Labrador. A compilation of historical aeromagnetic anomalies is shown. SAGA has demonstrated the reliability of the regional airborne magnetic surveys after ground-truthing and drilling in the 2024 and 2025 field programs.
Qualified Person
Paul J. McGuigan, P. Geo. is an Independent Qualified Person as defined under National Instrument 43-101 and has reviewed and approved the technical information related to the Radar Ti-V-Fe Project disclosed in this news release.
About Saga Metals Corp.
Saga Metals Corp. is a North American mining company focused on the exploration and discovery of critical minerals that support the global transition to green energy. The company's flagship asset, the Double Mer Uranium Project, is located in Labrador, Canada, covering 25,600 hectares. This project features uranium radiometrics that highlight an 18km east-west trend, with a confirmed 14km section producing samples as high as 0.428% U 3 O 8 and uranium uranophane was identified in several areas of highest radiometric response (2024 Double Mer Technical Report).
In addition to its uranium focus, SAGA owns the Legacy Lithium Property in Quebec's Eeyou Istchee James Bay region. This project, developed in partnership with Rio Tinto, has been expanded through the acquisition of the Amirault Lithium Project. Together, these properties cover 65,849 hectares and share significant geological continuity with other major players in the area, including Rio Tinto, Winsome Resources, Azimut Exploration, and Loyal Lithium.
SAGA also holds additional exploration assets in Labrador, where the company is focused on discovering titanium, vanadium, and iron ore. With a portfolio that spans key minerals crucial to the green energy transition, SAGA is strategically positioned to play an essential role in the clean energy future.
On Behalf of the Board of Directors
Mike Stier, Chief Executive Officer
For more information, contact:
Saga Metals Corp.
Investor Relations
Tel: +1 (778) 930-1321
Email: info@sagametals.com
www.sagametals.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Disclaimer
This news release contains forward-looking statements within the meaning of applicable securities laws that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipates", "expects", "believes", and similar expressions or the negative of these words or other comparable terminology. All statements other than statements of historical fact, included in this release are forward-looking statements that involve risks and uncertainties. In particular, this news release contains forward-looking information pertaining to the Company's Radar project drill assays. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage, risks and uncertainties involved in the mineral exploration and development industry, and the risks detailed in the Company's final prospectus in Manitoba and amended and restated final prospectus for British Columbia, Alberta and Ontario dated August 30, 2024, filed under its SEDAR+ profile at www.sedarplus.ca, and in the continuous disclosure filings made by the Company with securities regulations from time to time. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements only as expressly required by applicable law.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/e5ca5e4e-48dc-4ebe-86d6-1e728485fb3e
https://www.globenewswire.com/NewsRoom/AttachmentNg/60493398-5a8f-45d1-8c58-4a4fd616859c
News Provided by GlobeNewswire via QuoteMedia
About Altech Batteries Ltd: Â
Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.
The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.
Source:
Altech Batteries Ltd
Contact:
Corporate
Iggy Tan
Managing Director
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com
Martin Stein
Chief Financial Officer
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com
News Provided by ABN Newswire via QuoteMedia
NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FORÂ DISSEMINATION IN THE UNITED STATES.
Saga Metals Corp. (the "Company" or "SAGA") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery in Canada, is pleased to announce that it has closed a first tranche (the " First Tranche ") of its non-brokered private placement announced on May 2, 2025 (the " Offering ") for gross proceeds of $1,239,700.10. The Company has also received a 30-day extension to close the Offering from the TSX Venture Exchange, and accordingly expects to close the final tranche of the Offering on or before June 25, 2025.
On closing of the First Tranche, the Company received gross proceeds of $444,200.10 from the issuance of 1,480,667 flow-through units at a price of $0.30 per unit (" FT Units ") and $795,500 from the issuance of 3,182,000 hard dollar units at a price of $0.25 per unit (" HD Units ").
Each FT Unit consists of one flow-through common share (a " FT Share ") as defined in subsection 66(15) of the Income Tax Act (Canada) (the " Tax Act "), and one transferable common share purchase warrant (a " Warrant "). Each Warrant will entitle its holder to purchase one common share in the capital of the Company (a " Warrant Share ") at a price of $0.50 for 24 months from the closing date of the Offering (the " Closing Date "). The Warrants and the Warrant Shares underlying the FT Units will not qualify as "flow-through shares" under the Tax Act.
Each HD Unit consists of one common share (a " HD Share ") and one Warrant.
All securities issued in connection with the First Tranche are subject to a hold period of four months and one day following the Closing Date pursuant to applicable securities laws.
In connection with the First Tranche, the Company paid an aggregate of $31,710.01 in finder's fees and issued 108,616 finder's warrants (each, a " Finder's Warrant ") to certain finders. Each Finder's Warrant entitles the holder thereof to purchase one common share of the Company at a price of $0.50 per share for a period of 24 months from its date of issue.
Each of the Warrants and Finder's Warrants will be subject to the right of the Company to accelerate the expiry date of the Warrants and Finder's Warrants to a date that is 30 days following dissemination of a news release announcing such acceleration if, at any time, after the Closing Date, the closing price of the Company's common shares equals or exceeds $0.75 for a period of ten consecutive trading days on the TSX Venture Exchange.
The gross proceeds from the FT Units will be used by the Company for "Canadian exploration expenses" that are "flow-through critical mineral mining expenditures" (as such terms are defined in the Tax Act) on the Company's Labrador, Canada properties. The net proceeds of the HD Units will be used by the Company for administrative and general working capital.
Certain insiders of SAGA participated in the First Tranche, acquiring an aggregate of 442,000 HD Units for aggregate gross proceeds of $110,500. Participation of such insiders in the Offering constitutes a "related party transaction" as defined under Multilateral Instrument 61-101 Protection of Minority Security Holders in Special Transactions (" MI 61-101 ") and is exempt from the formal valuation and minority shareholder approval requirements of MI 61-101 as neither the fair market value of the securities issued to the insiders nor the consideration paid by the insiders exceeded 25% of SAGA's market capitalization.
The securities of SAGA have not been and will not be registered under the United States Securities Act of 1933, as amended (the " U.S. Securities Act "), or any state securities laws, and may not be offered or sold, within the United States, unless exemptions from the registration requirements of the U.S. Securities Act and applicable state securities laws are available.
No securities regulatory authority has reviewed or approved of the contents of this news release. This news release does not constitute an offer to sell or a solicitation of an offer to buy any securities of SAGA in any jurisdiction in which such offer, solicitation or sale would be unlawful.
About Saga Metals Corp.
Saga Metals Corp. is a North American mining company focused on the exploration and discovery of critical minerals that support the global transition to green energy. The company's flagship asset, the Double Mer Uranium Project, is located in Labrador, Canada, covering 25,600 hectares. This project features uranium radiometrics that highlight an 18km east-west trend, with a confirmed 14km section producing samples as high as 0.428% U 3 O 8 and uranium uranophane was identified in several areas of highest radiometric response (2024 Double Mer Technical Report).
In addition to its uranium focus, SAGA owns the Legacy Lithium Property in Quebec's Eeyou Istchee James Bay region. This project, developed in partnership with Rio Tinto, has been expanded through the acquisition of the Amirault Lithium Project. Together, these properties cover 65,849 hectares and share significant geological continuity with other major players in the area, including Rio Tinto, Winsome Resources, Azimut Exploration, and Loyal Lithium.
SAGA also holds additional exploration assets in Labrador, where the company is focused on the discovery of titanium, vanadium, and iron ore. With a portfolio that spans key minerals crucial to the green energy transition, SAGA is strategically positioned to play an essential role in the clean energy future.
On Behalf of the Board of Directors
Mike Stier, Chief Executive Officer
For more information, contact:
Saga Metals Corp.
Investor Relations
Tel: +1 (778) 930-1321
Email: info@sagametals.com
www.sagametals.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Disclaimer
This news release contains forward-looking statements within the meaning of applicable securities laws that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipates", "expects", "believes", and similar expressions or the negative of these words or other comparable terminology. All statements other than statements of historical fact, included in this release are forward-looking statements that involve risks and uncertainties. In particular, this news release contains forward-looking information pertaining to the Company's plans and objectives in respect of the terms and conditions of the Offering, the gross proceeds of the Offering, the use of proceeds from the Offering, and the anticipated closing dates of additional tranches of the Offering and the Offering. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, but are not limited to, changes in the structure of the Offering, the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage, risks and uncertainties involved in the mineral exploration and development industry, and the risks detailed in the Company's final prospectus in Manitoba and amended and restated final prospectus for British Columbia, Alberta and Ontario dated August 30, 2024, filed under its SEDAR+ profile at www.sedarplus.ca, and in the continuous disclosure filings made by the Company with securities regulations from time to time. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements only as expressly required by applicable securities law.
News Provided by GlobeNewswire via QuoteMedia
Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to announce additional drill results from its 2025 maiden drill program at the Radar Ti-V-Fe Project, located near the port of Cartwright in Labrador, Canada. These results further validate the presence of a strong, arcuate magnetic-high anomaly identified in regional magnetic surveys within the central zone of the Dykes River layered mafic intrusive complex.
Saga Metals Confirms Additional Geological Success with the Drill:
Key drill intercepts from HEZ-05 & HEZ-07 (2 additional holes of the 7-hole program) include:
Description | DDH | FROM | TO | Length | Fe | TiO2 | V205 |
ID | m | m | m | % | % | % | |
Highest Grade intercept | HEZ-07 | 185 | 205.2 | 20.2 | 31.354 | 6.324 | 0.435 |
Layering Sequence_01 | HEZ-07 | 86.8 | 103.23 | 16.43 | 25.559 | 5.007 | 0.356 |
Layering Sequence_02 | HEZ-07 | 147.5 | 205.2 | 57.7 | 27.090 | 5.305 | 0.365 |
Layering Sequence_03 | HEZ-07 | 225.7 | 236 | 10.3 | 27.549 | 5.339 | 0.377 |
Full Hole | HEZ-07 | 2.3 | 314 | 311.7 | 15.831 | 2.855 | 0.183 |
Highest Grade intercept_S | HEZ-05 | 236 | 261 | 25 | 19.918 | 4.144 | 0.213 |
Layering Sequence | HEZ-05 | 117.2 | 304.5 | 187.3 | 17.998 | 3.753 | 0.177 |
Full Hole | HEZ-05 | 4.50 | 459.00 | 455.50 | 13.777 | 2.691 | 0.122 |
Table 1: Composite grades of HEZ-07 & HEZ-05
Sample Number | DDH | FROM | TO | Length | Fe | TiO2 | V205 |
ID | m | m | m | % | % | % | |
1473004 | HEZ-07 | 178 | 178.5 | 0.5 | 45.4 | 9.1 | 0.66 |
1473055 | HEZ-07 | 201 | 201.5 | 0.5 | 43.6 | 9 | 0.632 |
1473002 | HEZ-07 | 177 | 177.5 | 0.5 | 43.9 | 8.8 | 0.631 |
1473113 | HEZ-07 | 235 | 235.5 | 0.5 | 42 | 8.7 | 0.591 |
1472452 | HEZ-05 | 208.5 | 209 | 0.5 | 34.7 | 7.4 | 0.403 |
Table 2: High-grade samples from HEZ-07 & HEZ-05 show correlation to higher Titanomagnetite content in samples.
The SAGA team has completed an assessment of assay results from drill holes HEZ-05 and HEZ-07. Geochemical analysis confirms a consistent Ti-V-Fe relationship, aligning well with the oxide layering previously observed in HEZ-01 and HEZ-04. Notably, HEZ-05 contains over 180 meters of core, and HEZ-07 nearly 100 meters, both averaging over 25% titanomagnetite content. Several standout samples, such as those listed in Table 2, report titanomagnetite concentrations as high as 60%.
HEZ-05, a twin of HEZ-04 but drilled at a 70-degree dip, exhibits a strong geological correlation, extending confidence in the continuity of oxide layering down to a vertical depth of 300 meters. Meanwhile, HEZ-07, which targeted a distinct magnetic anomaly, confirmed the extension of oxide layering observed in HEZ-01. This extension appears to be laterally displaced by sinistral faulting relative to the main body. Supporting this interpretation, multiple fault structures were encountered, and several intercepts revealed fine-grained, massive magnetite layers up to 3-meters thick—the highest-grade intervals observed across all drill holes.
The initial seven-hole, 2,200-meter drill program has successfully tested the primary target area, covering a 500 by 350-meter panel. With the inclusion of recent assays from HEZ-05 and HEZ-07, the continuity of high-grade oxide mineralization is now supported to a vertical depth of 300 meters. These new results reinforce earlier findings from HEZ-01 and HEZ-04, confirming the presence of extensive and consistently mineralized oxide layers.
Drilling Highlights to Date:
Figure 1: 500m strike by 350m width magnetic anomaly drilled in the winter 2025 program. (2024 Saga Metals. TMI Magnetic Survey). Shows DDH collars and Lithologies.
Drilling also confirmed massive to semi-massive oxide layering, hosting titanium and vanadium mineralization, with significant widths up to 210 meters within the drill core. The geological context identified by Dr. Al Miller's petrographic studies has substantially advanced understanding of the Radar deposit. These findings indicate a titanomagnetite mineralization system which is advantageous for simplified metallurgical processing and potentially improved economic outcomes.
The 2025 drill campaign represents 1/40 th of the approximately 20km long oxide layering zone identified at the Radar project. Following these encouraging results, Saga Metals plans to systematically expand exploration using proven and accurate methodologies—magnetic surveys followed by targeted drilling.
"These additional results are consistent with HEZ-01 & HEZ-04 which demonstrate what we can expect when intercepting oxide layering throughout the property. This is by far the most important take home and revelation from all 4 holes that have returned assays; exceptional consistency and width," commented Michael Garagan, CGO & Director of Saga Metals . "Additionally, HEZ-07 despite being offset from the main layering sequence has consistent high-grades and shows that even the structural offsets within this 1.6-billion-year-old layered mafic intrusion show signs of economic potential."
Figure 2: The prospective inferred ~20km aerial oxide layering zone on the Radar property. Compilation of analytical geophysics as acquired from historical sources, which SAGA has proven confidence in after the 2024 field programs.
Radar Ti-V-Fe Property Overview:
The Company's 100%-owned Radar Property is located 10 km from the coastal city of Cartwright, Labrador, benefiting from tremendous infrastructure including, road access, deep-water port, airstrip and nearby hydro-electric power. The Radar Property comprises 24,175-hectares and entirely encloses the Dykes River intrusive complex.
The Dykes River intrusive complex is a recently recognized Mesoproterozoic layered mafic intrusion (Gower, 2017). It has gained attention due geological similarities to large AMCG-type intrusions and a very extensive titanium–vanadium–iron (Ti-V-Fe) rich layer.
Regional airborne magnetic surveys first highlighted the mafic oxide layer and indicated an arcuate 20 km long exploration target.
Figure 3: Map of the Radar project highlighting the oxide layering, road access, and proximity to the town of Cartwright, Labrador. SAGA has proven confidence in the compilation of analytical geophysics acquired from historical sources after the 2024 field programs.
About Saga Metals Corp.
Saga Metals Corp. is a North American mining company focused on exploring and discovering critical minerals that support the global transition to green energy. The company's flagship asset, the Double Mer Uranium Project, is located in Labrador, Canada, covering 25,600 hectares. This project features uranium radiometrics that highlight an 18km east-west trend, with a confirmed 14km section producing samples as high as 0.428% U 3 O 8 and uranium uranophane was identified in several areas of highest radiometric response (2024 Double Mer Technical Report).
In addition to its uranium focus, SAGA owns the Legacy Lithium Property in Quebec's Eeyou Istchee James Bay region. This project, developed in partnership with Rio Tinto, has been expanded through the acquisition of the Amirault Lithium Project. Together, these properties cover 65,849 hectares and share significant geological continuity with other major players in the area, including Rio Tinto, Winsome Resources, Azimut Exploration, and Loyal Lithium.
SAGA also holds additional exploration assets in Labrador, where the company is focused on the discovery of titanium, vanadium, and iron ore. With a portfolio that spans key minerals crucial to the green energy transition, SAGA is strategically positioned to play an essential role in the clean energy future.
Qualified Person
Paul J. McGuigan, P. Geo. is an Independent Qualified Person as defined under National Instrument 43-101 and has reviewed and approved the technical information related to the Radar Ti-V Project disclosed in this news release.
On Behalf of the Board of Directors
Mike Stier, Chief Executive Officer
For more information, contact:
Saga Metals Corp.
Investor Relations
Tel: +1 (778) 930-1321
Email: info@SAGAmetals.com
www.SAGAmetals.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Disclaimer
This news release contains forward-looking statements within the meaning of applicable securities laws that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipates", "expects", "believes", and similar expressions or the negative of these words or other comparable terminology. All statements other than statements of historical fact, included in this release are forward-looking statements that involve risks and uncertainties. In particular, this news release contains forward-looking information pertaining to the Company's Radar project drill assays. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage, risks and uncertainties involved in the mineral exploration and development industry, and the risks detailed in the Company's final prospectus in Manitoba and amended and restated final prospectus for British Columbia, Alberta and Ontario dated August 30, 2024, filed under its SEDAR+ profile at www.sedarplus.ca, and in the continuous disclosure filings made by the Company with securities regulations from time to time. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements only as expressly required by applicable law.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/44616e6d-1c2c-4c60-819a-641bf8731b12
https://www.globenewswire.com/NewsRoom/AttachmentNg/14a32395-b45e-419d-bcd1-59dbb3a9705d
https://www.globenewswire.com/NewsRoom/AttachmentNg/7e0dbed9-d174-4484-aac4-67acb7aa68df
News Provided by GlobeNewswire via QuoteMedia
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â