
Jindalee will be attending the PDAC Convention in Toronto, Canada over 2-5 March 2025
Jindalee will present to a North American investor audience at Redcloud's 13th annual Pre-PDAC Mining Showcase in Toronto over 27-28 February 2025
With compelling economic metrics demonstrated through its new prefeasibility study, Jindalee Lithium’s McDermitt Project presents a strong case for investors to gain exposure to this critical mineral and participate in the global clean energy transition.
Jindalee Lithium (ASX:JLL,OTCQX:JNDAF) is an Australia-based pure-play US lithium company focused exclusively on its 100-percent-owned McDermitt Lithium Project, currently one of the largest lithium deposits in the US, boasting a resource of 21.5 million tons (Mt) of lithium carbonate equivalent (LCE).
Backed by a newly released (November 2024) prefeasibility study (PFS) demonstrating very compelling economics, the McDermitt Project is poised to play a crucial role in meeting North America’s growing lithium demand for the lucrative battery value chain.
As the US continues to transition to energy independence, demand for lithium is expected to exponentially increase. Jindalee’s McDermitt Project, located in southeast Oregon, is a game-changer for North American lithium supply, critical for meeting the demands of the fast-growing electric vehicle, energy storage and defense sectors.
McDermitt also stands to significantly benefit from the US government’s policies and incentives to boost domestic supply of critical resources. In fact, in a move that signifies the US government's support of the McDermitt Lithium Project, the US Department of Energy's Ames National Laboratory signed a Cooperative Research and Development Agreement with Jindalee's subsidiary HiTech Minerals to develop cutting-edge extraction methods for the McDermitt Project. The Ames National Laboratory spearheads the DOE's Critical Materials Innovation Hub.
Key milestones in the US lithium resource space also provide significant insights into the future prospects for Jindalee’s project. Lithium Americas (TSX:LAC), for instance, has received a total of US$945 million investment from General Motors, which will fund the development, construction and operation of the Thacker Pass project in Humboldt County, Nevada. In October 2024 LAC closed a $2.3 billion loan from the US Department of Energy and in April 2025 announced the Final Investment Decision for Thacker Pass following a $250 million investment from Orion Resource Partners.
Another lithium resource developer in Nevada, Australia-based Ioneer (ASX:INR) has closed a US$996 million loan guarantee from the US Department of Energy to finance the development of its flagship Rhyolite Ridge lithium-boron project.
The US government has taken further action to bolster domestic critical mineral production. On 20 March 2025, President Trump issued a significant executive order titled "Immediate Measures to Increase American Mineral Production", underscoring the urgency and strategic imperative of increasing domestic supply chains for critical minerals. This order builds on previous initiatives by fast-tracking the permitting processes, prioritizing access to mineral-rich federal lands, clarifying regulatory frameworks, and mobilizing substantial financial resources – including Defense Production Act (DPA) funds – towards domestic mineral projects.
As one of the largest lithium resources in the US and situated on federal lands, Jindalee’s McDermitt Lithium Project stands to potentially benefit from these accelerated permitting processes and enhanced government support mechanisms. The clear commitment demonstrated by the US administration highlights the critical strategic advantage of domestically located mineral assets such as McDermitt, reinforcing its importance in securing robust domestic supply chains, essential for energy security
These are just a few examples of current market dynamics that point to a rapidly accelerating lithium resource development in the US.
An experienced management team, with the right blend of experience and expertise in geology, corporate administration and international finance, leads Jindalee to fully capitalize on the potential of its assets.
The economic metrics revealed in the PFS paint a compelling picture of the McDermitt Lithium Project's potential:
Production Capacity: The Project is set to produce 1.8 Mt of battery-grade lithium carbonate over its first 40 years, with an annual output forecast of 47,500 tons per annum (tpa) in the initial 10 years, tapering to 44,300 tpa over the first 40 years.
Financial Metrics: The Project boasts a net present value (NPV) of US$3.23 billion at an 8 percent discount rate, with an internal rate of return (IRR) of 17.9 percent. These figures underscore the Project’s strong economic viability.
Payback Period: Investors can expect a payback period of less than five years, a relatively short timeframe for a project of this magnitude.
Break-even Price: The break-even NPV price is approximately US$14,600/t of lithium carbonate, providing a buffer against market fluctuations.
The PFS estimates a total project cost of US$3.02 billion, which includes a prudent 21 percent contingency margin. This substantial investment is balanced by impressive profitability projections, including an EBITDA margin of 66 percent generating post-tax free cash flow of US$6.6 billion during the first decade of operations. With a pre-tax net operating cashflow margin of 17 percent at current spot prices, McDermitt shows strong cash generation potential.
These financial indicators suggest that McDermitt is not only economically viable but potentially highly profitable, positioning it as an attractive prospect for investors and strategic partners alike.
The McDermitt Project is located in Malheur County on the Oregon-Nevada border and is approximately 35 kilometres west of the town of McDermitt. The 100-percent-owned asset covers 54.6 square kilometres of claims at the northern end of the McDermitt volcanic caldera.
The Project is characterized by its unique sedimentary lithium deposits, primarily composed of lithium-bearing clays, a geological formation that sets McDermitt apart from many other lithium projects worldwide. This sedimentary nature of the deposit offers several advantages:
The lithium-rich clays at McDermitt are part of a broader geological context that includes volcanic tuffs and sedimentary rocks. This geological setting is indicative of a complex depositional history, which has resulted in the concentration of lithium in economically viable quantities.
The 2023 mineral resources estimate (MRE) for the McDermitt Project contains a combined indicated and inferred mineral resource inventory of 3 billion tons at 1,340 parts per million (ppm) lithium for a total of 21.5 Mt LCE at 1,000 ppm cut-off grade.
Ian Rodger is a qualified mining business executive with almost 15 years of experience in various roles including as a mining engineer for Rio Tinto across two large greenfield mine developments, before successfully transitioning into mining corporate finance where he held Executive and Director positions at RFC Ambrian overseeing origination and management of numerous mandates across a range of corporate advisory roles. Rodger was the project director for Oz Minerals (ASX:OZL) where he made significant contributions to successfully define the value potential of the West Musgrave nickel/copper province through the delivery of a portfolio of growth studies. Most notably, he led technical, market and partnership development workstreams, successfully confirming value potential for producing an intermediate Nickel product for the battery value chain.
Rodger holds a Bachelor of Mining Engineering from the University of Queensland, a Masters of Mineral Economics from Curtin University and is also a graduate of the Australian Institute of Company Directors and member of the Australasian Institute of Mining and Metallurgy.
Lindsay Dudfield is a geologist with over 40 years of experience in multi-commodity exploration, primarily within Australia. He held senior positions with the mineral divisions of Amoco and Exxon. In 1987, he became a founding director of Dalrymple Resources NL and spent the following eight years helping acquire and explore Dalrymple’s properties, leading to several greenfield discoveries. In late 1994, Lindsay joined the board of Horizon Mining NL (Jindalee Lithium’s predecessor) and has been responsible for managing Jindalee Lithium since inception. Lindsay is a member of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Geoscientists, the Geological Society of Australia and the Society of Economic Geologists. He is also a non-executive director of Jindalee spin-out companies Energy Metals (ASX:EME), Dynamic Metals (ASX:DYM) and Alchemy Resources (ASX:ALY).
Wayne Zekulich was appointed to the board as Chair on 1 February 2024. He holds a Bachelor of Business and is a fellow of the Institute of Chartered Accountants. Zekulich is a consultant and non-executive director who has substantial experience in advising, structuring and financing transactions in the infrastructure and resources sectors. He was previously the head of Rothschild in Perth, chief financial officer of Gindalbie Metals Limited, chief development officer of Oakajee Port and Rail and a consultant to a global investment bank. Currently, he is chair of Pantoro (ASX:PNR) and non-executive director of the Western Australian Treasury Corporation. In the not-for-profit sector, he is the past chair of the Lester Prize and is a mentor in the Kilfinan program.
Darren Wates is a corporate lawyer with over 23 years of experience in equity capital markets, mergers and acquisitions, resources, project acquisitions/divestments and corporate governance gained through private practice and in-house roles in Western Australia. Wates is the founder and principal of Corpex Legal, a Perth-based legal practice providing corporate, commercial and resources related legal services, primarily to small and mid-cap ASX listed companies. In this role, he has provided consulting general counsel services to ASX listed company Neometals (ASX:NMT), having previously been employed as legal counsel of Neometals. Wates holds Bachelor's degrees in Law and Commerce and a Graduate Diploma in Applied Finance and Investment.
Paul Brown has over 23 years of experience in the mining industry, most recently with Mineral Resources (ASX:MIN) where he was chief executive – lithium, and chief executive – commodities. Brown has held senior operating roles with Leighton, HWE and Fortescue (ASX:FMG) and has a strong track record in technical leadership, project/studies management, and mine planning and management. Brown is currently CEO of Core Lithium (ASX:CXO). He holds a Master in Mine Engineering.
Game-changing, economically significant lithium resource for North American battery supply chain
Jindalee will be attending the PDAC Convention in Toronto, Canada over 2-5 March 2025
Jindalee will present to a North American investor audience at Redcloud's 13th annual Pre-PDAC Mining Showcase in Toronto over 27-28 February 2025
Redcloud is a Canadian-based investor relations group specialising in the junior resources sector
Jindalee Lithium Limited (ASX: JLL) (OTCQX: JNDAF) (Jindalee, the Company) is pleased to announce that the Company will participate in both the Prospectors and Developers Association of Canada (PDAC) Convention and the Pre-PDAC Mining Showcase, hosted by Redcloud Financial Services Inc. (Redcloud), a globally oriented resource focused financial services platform.
Jindalee can be found at booth 2606 in the Investors Exchange Exhibition Room at the PDAC Convention which will be attended by Jindalee's Chief Executive Officer, Ian Rodger. PDAC, regarded as one of the world's premier resources conferences, will run from Sunday, 2 March 2025 until Wednesday, 5 March 2025 at the Metro Toronto Convention Centre in Ontario, Canada.
Jindalee is also participating in Redcloud's Pre-PDAC Mining Showcase at the Omni King Edward Hotel in Toronto over Thursday 27 and Friday, 28 February 2025. Ian will be presenting at the Pre-PDAC Mining Showcase at 4.00pm local time on Friday, 28 February 2025. Jindalee will also be available to engage with investors in one-on-one meetings at the Pre-PDAC Mining Showcase and encourages interested investors to register for the event.
Jindalee looks forward to updating the North American mining and investment communities on progress at its 100% owned McDermitt Lithium Project which hosts one of the largest lithium resources in the U.S. The Pre-Feasibility Study at McDermitt, released in November 2024, outlines a highly robust multi-generational battery chemicals project1.
To register for the PDAC Convention visit here: https://pdac.ca/convention-2025/attending-2025/registration-2025
For more information and to register for the Pre-PDAC Conference please visit: https://redcloudfs.com/prepdac2025/
Authorised for release by the Jindalee Board of Directors. For further information please contact:
LINDSAY DUDFIELD | IAN RODGER |
Executive Director | Chief Executive Officer |
T: + 61 8 9321 7550 | T: + 61 8 9321 7550 |
E: enquiry@jindaleelithium.com | E: enquiry@jindaleelithium.com |
Â
About Jindalee
Jindalee Lithium is an Australian company focused on developing the McDermitt Lithium Project, one of the largest lithium resources in the U.S. With 100% ownership and unencumbered offtake rights, Jindalee is strategically positioned to support America's energy security and domestic supply of critical minerals. The Company recently completed a Pre-Feasibility Study (PFS) confirming McDermitt's scale, long-life, and low-cost production potential, with strong engagement from U.S. government agencies, including the Department of Energy and Department of Defense. As a deeply undervalued lithium developer, Jindalee presents a compelling investment opportunity ahead of the next lithium market upcycle.
Competent Persons Statement
The Company confirms that it is not aware of any further new information or data that materially affects the information included in the original market announcements by Jindalee Lithium Limited referenced in this report and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. To the extent disclosed above, the Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
Forward-Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include but are not limited to statements concerning Jindalee Lithium Limited's (Jindalee's) current expectations, estimates and projections about the industry in which Jindalee operates, and beliefs and assumptions regarding Jindalee's future performance. When used in this document, the words such as "anticipate", "could", "plan", "estimate", "expects", "seeks", "intends", "may", "potential", "should", and similar expressions are forward-looking statements. Although Jindalee believes that its expectations reflected in these forward-looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond the control of Jindalee and no assurance can be given that actual results will be consistent with these forward-looking statements.
________________________
1Jindalee Lithium ASX announcement 19/11/2024: "McDermitt Lithium Project Pre-Feasibility Study"
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/241723
News Provided by Newsfile via QuoteMedia
Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company specializing in the discovery of critical minerals, is pleased to announce the addition of 97 new claims covering 2,425 hectares, increasing the total area of the Radar Ti-V-Fe Project to 24,175 hectares.
The Company's 100%-owned Radar Property is strategically located just 10 kilometres from the coastal city of Cartwright, Labrador. The location offers excellent infrastructure advantages, including:
With the recent expansion, the Radar Property now fully encompasses the Dykes River intrusive complex, a recently identified Mesoproterozoic layered mafic intrusion (Gower, 2017). The complex has garnered significant interest due to its geological resemblance to large AMCG-type intrusions and the presence of an extensive titanium-vanadium-iron (Ti-V-Fe) enriched layer containing vanadiferous titanomagnetite ("VTM").
Regional airborne magnetic surveys highlighted the mafic oxide layer, revealing an arcuate exploration target extending over 20 kilometers in length.
Michael Garagan, CGO & Director of SAGA commented: "To lay claim to the entire Dykes River Intrusion is an important milestone for SAGA and its shareholders. Throughout history, many of these mineralized geological settings have been shared amongst multiple companies vying to advance their projects. It's a unique and significant opportunity to hold the entire 160 square km intrusion mapped at the surface and benefits from tremendous infrastructure. The claim acquisition consolidates the entire intrusion and allows the company to delegate zones for both additional infrastructure and further exploration. We've only just begun uncovering the true potential and extent of the oxide layering hosted within the intrusion."
Figure 1: Map of the Radar project highlighting the oxide layering, road access, and proximity to the town of Cartwright, Labrador. SAGA's 2024 field programs now confirm compilation of historical airborne geophysics.
Saga Metals Confirms Geological Success with Drilling:
The Company recently reported assays from the first two of seven holes drilled on the Hawkeye zone of the Radar Ti-V-Fe property. Please click here to review the full press release on drill holes #1 and #4. Highlights are listed below.
Highlights:
Drilling also confirmed massive to semi-massive oxide layering, hosting VTM mineralization, with significant widths up to 210 meters within the drill core. The geological context identified by Dr. Al Miller's petrographic studies substantially advanced the understanding of Radar Property mineralization. These findings indicate that the VTM mineralization system is advantageous for simplified metallurgical processing and potentially improves economic outcomes.
Figure 2: The prospective oxide layering zone on the Radar property extends for an inferred 20km strike length, as shown on a compilation of historical airborne geophysics, which SAGA confirmed in the 2024 field programs.
Figure 3: Hawkeye Zone displays a  500m strike by 350m width magnetic anomaly drilled in the winter 2025 program. (2024 Saga Metals. TMI Magnetic Survey).
Given the success of the maiden drill program within the Hawkeye zone over a 500 m strike and the strong correlation between drill core, rock samples and geophysics (Figure 3), SAGA plans to repeat this model over the five priority targets along the 20 km strike length of the oxide layer. The geophysical anomaly drilled in the Hawkeye zone is potentially one of the lesser anomalies. Early indications from geophysics being conducted over the Trapper zone report an even stronger magnetic response.
Qualified Person
Paul J. McGuigan, P. Geo. is an Independent Qualified Person as defined under National Instrument 43-101 and has reviewed and approved the technical information related to the Radar Ti-V-Fe Project disclosed in this news release.
About Saga Metals Corp.
Saga Metals Corp. is a North American mining company focused on the exploration and discovery of critical minerals that support the global transition to green energy. The company's flagship asset, the Double Mer Uranium Project, is located in Labrador, Canada, covering 25,600 hectares. This project features uranium radiometrics that highlight an 18km east-west trend, with a confirmed 14km section producing samples as high as 0.428% U 3 O 8 and uranium uranophane was identified in several areas of highest radiometric response (2024 Double Mer Technical Report).
In addition to its uranium focus, SAGA owns the Legacy Lithium Property in Quebec's Eeyou Istchee James Bay region. This project, developed in partnership with Rio Tinto, has been expanded through the acquisition of the Amirault Lithium Project. Together, these properties cover 65,849 hectares and share significant geological continuity with other major players in the area, including Rio Tinto, Winsome Resources, Azimut Exploration, and Loyal Lithium.
SAGA also holds additional exploration assets in Labrador, where the company is focused on the discovery of titanium, vanadium, and iron ore. With a portfolio that spans key minerals crucial to the green energy transition, SAGA is strategically positioned to play an essential role in the clean energy future.
On Behalf of the Board of Directors
Mike Stier, Chief Executive Officer
For more information, contact:
Saga Metals Corp.
Investor Relations
Tel: +1 (778) 930-1321
Email: info@SAGAmetals.com
www.SAGAmetals.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Disclaimer
This news release contains forward-looking statements within the meaning of applicable securities laws that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipates", "expects", "believes", and similar expressions or the negative of these words or other comparable terminology. All statements other than statements of historical fact, included in this release are forward-looking statements that involve risks and uncertainties. In particular, this news release contains forward-looking information pertaining to the Company's Radar Ti-V-Fe project. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage, risks and uncertainties involved in the mineral exploration and development industry, and the risks detailed in the Company's final prospectus in Manitoba and amended and restated final prospectus for British Columbia, Alberta and Ontario dated August 30, 2024, filed under its SEDAR+ profile at www.sedarplus.ca, and in the continuous disclosure filings made by the Company with securities regulations from time to time. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements only as expressly required by applicable law.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/e5fcaa32-0144-4ab1-8675-6311908d44c5
https://www.globenewswire.com/NewsRoom/AttachmentNg/4d825e7b-917e-4d9b-a851-f4e0bb4edee0
https://www.globenewswire.com/NewsRoom/AttachmentNg/19f0eab7-33e1-4997-b231-965227540f9a
News Provided by GlobeNewswire via QuoteMedia
(TheNewswire)
VANCOUVER, BC TheNewswire - MAY 7 th 2025 American Salars Lithium Inc. ("AMERICAN SALARS" OR THE "COMPANY") (CSE: USLI, OTC: USLIF, FWB: Z3P, WKN: A3E2NY ) announces that it has commenced a Phase 2 sampling program on its 100% owned, highly prospective 18,083 Hectares (180 sq km) Hardrock LCT ("Lithium-Cesium-Tantalum") Pegmatite Project including Rare Earth Elements ("REEs") and Critical Minerals (the "Jaguaribe Project ").
The Jaguaribe Project is located in the Jaguaribe/Solonópole region in the State of Ceará, in Northern Brazil and hosts multiple extensive Lithium and REE bearing pegmatite dykes that have returned initial Phase 1 sample discoveries of up to 3.72% Li 2 O, 2.15% Li 2 O and 1.58% Li 2 O as well as 554.5 ppm of Cesium,
135 ppm of Tantalum, 177 ppm of Niobium. One sample showed high values for Rubidium (>10,000ppm); Tin (675 ppm) and Zinc (387ppm).
American Salars CEO & Director R. Nick Horsley states, " We are thrilled to launch the second phase of exploration at our Jaguaribe Project, building on the promising lithium and rare earth element (REE) discoveries from phase one. Brazil is a global hub for hard rock lithium production, and our Jaguaribe Project, located in a well-known pegmatite district, has already yielded high-grade lithium samples and significant REE values. This next phase will focus on identifying and sampling additional pegmatites to further delineate the scale and quality of this critical mineral-rich region."
The initial phase 1 exploration program revealed multiple long and wide pegmatite dykes that measure up to 30 meters in width and up to 300 meters in length that are largely unexplored. American Salars has secured field crews, a Brazil focussed senior geologist, and lithium specialist QP to oversee a more extensive Phase 2 work program to map new pegmatite outcrops as well as sampling new and known areas of mineralization. The Company has secured sampling and exploration crews and is working with local Brazil based geological consultants to help plan a follow up drilling program to test priority targets.
About the Jaguaribe Property
The Jaguaribe Property covers historic artisanal mining sites previously mined for lithium, coltan (tantalum and niobium) and tin.
Initial sampling of the Jaguaribe Pegmatites returned Spodumene bearing pegmatite samples that graded up to 3.72% Li2O as well as Rare Earth Elements.
Phase 2 sampling will test multiple additional LCT Pegmatite targets.
Ideal project location - Historical Pegmatite Province Brazil.
4-hour drive on paved roads to port and international airport (Fortaleza).
The topography, land use and vegetation at Jaguaribe Property is well suited for exploration activities.
Arid, sparsely populated farmland, no rain forest.
Northern Brazil provides shipping routes and deep-water ports to North American and European battery chemical markets.
Figure 1. Geological Map of the Solonópole/Jaguaribe Region, with location of the Jaguaribe claim blocks shown in YELLOW color .
Multi elements ICP analysis (55 elements) of 13 pegmatites sampled across the Jaguaribe Project, returned: Lithium, Rubidium, Tantalum and Niobium. Of the 13 samples, one (VM-EJ-R-01) is mineralized with Lithium at (3.72% Li2O), a normal occurrence, because it was the first geological reconnaissance work carried out on the Project. The presence of Li bearing Lepidolite and Spodumene minerals were observed in the pegmatites during the initial fieldwork.
Pegmatite VM-EJ-01 is an LCT (Lithium-Cesium-Tantalum) pegmatite, in addition to samples of 3.72 Li2O, anomalous values of 554.5 ppm of Cesium and 135 ppm of Tantalum were recorded, accompanied by 177 ppm of Niobium and high values for Rubidium (>10,000ppm); Tin (675 ppm) and Zinc (387ppm). Initial fieldwork also detected two additional pegmatites with 2.15% and 1.58% Li2O, respectively, which led to the exploration and acquisition of the 10 claim blocks that make up the Jaguribe Property.
Figure 2. LCT pegmatite Outcrops and Surface Samples from vein in a North -Northeast direction and embedded in gneiss.
Figure 3. Location of the Pegmatite Districts of Ceará, Brazil.
Geochemical Characteristics of Pegmatites, Jaguaribe Project, Ceará, Brazil
A multi-element analyse was conducted at the SGS laboratory for 58 elements including REE, from 12 samples from the Jaguaribe Project. These samples were analyzed by the ICM90A method: determination with fusion in sodium peroxide-ICP OES/ICP MS.
Geochemistry of the Pegmatites samples from the Jaguaribe Project area, was compared with the standard sample or standard analysis provided by the SGS laboratory, with the common elements and their contents in an LCT-type Pegmatite (Lithium, Cesium and Tantalum).
The pegmatite from the VM-R-01 Pegmatite sample, which contained Lepidolite and a content of 1.54% Li 2 O, shows a strong geochemical correlation with the standard sample, in terms of the contents of Li, Cs, and Ta, the latter being much higher (135 ppm Ta) than the Ta content of the SGS standard sample (18 ppm Ta). The VM-R-1 sample also shows a correlation with the SGS standard, in terms of Rb, Nb, Sn and P. Other pegmatite samples from the Jaguaribe Project, namely VM-R-6 and VM-R-7, are iron enriched and present less marked correlations, in relation to the contents of the standard sample only in the elements Li, Rb and Ba, although they show anomalous geochemical values of Cs.
The results of the VM-R-8 and VM-R-10 analyses show a good correlation with the results of the SGS standard sample, regarding the contents of Rb, Ba, Cs, Ta, Nb and P, but the Li levels fell, respectively, to 110 ppm and less than 10 ppm. This sharp drop in the Li levels of these samples is mainly due to the leaching of Li minerals by surface waters, notably Spodumene, a phenomenon observed in most of the pegmatites in the region, whose Li levels increase substantially in the subsurface in mining pits, in the companies' research excavations and mainly in drill holes.
QUALIFIED PERSON
The technical content regarding the Jaguaribe Project, in this release has been reviewed and approved by Mitchell E. Lavery, P. Geo, who is an Independent Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
ABOUT AMERICAN SALARS
American Salars Lithium is an exploration company focused on exploring and developing high-value battery metals projects to meet the demands of the advancing electric vehicle market.
All Stakeholders are encouraged to follow the Company on its social media profiles on , , TikTok , and Instagram .
On Behalf of the Board of Directors,
" R. Nick Horsley "
R. Nick Horsley, CEO
For further information, please contact:
American Salars Lithium Inc.
Phone: 604.740.7492
E-Mail: info@americansalars.com
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
Disclaimer for Forward-Looking Information
Certain statements in this release are forward-looking statements, which reflect the expectations of management regarding American Salar's intention to continue to identify potential transactions and make certain corporate changes and applications. Forward looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Such statements are subject to risks and uncertainties that may cause actual results, performance, or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits American Salars will obtain from them. These forward-looking statements reflect managements' current views and are based on certain expectations, estimates and assumptions which may prove to be incorrect. A number of risks and uncertainties could cause actual results to differ materially from those expressed or implied by the forward-looking statements, including American Salars results of exploration or review of properties that American Salars does acquire. These forward-looking statements are made as of the date of this news release and American Salars assumes no obligation to update these forward-looking statements, or to update the reasons why actual results differed from those projected in the forward-looking statements, except in accordance with applicable securities laws.
Copyright (c) 2025 TheNewswire - All rights reserved.
News Provided by TheNewsWire via QuoteMedia
The Board of Directors of Albemarle Corp. (NYSE: ALB) announced today that it declared a quarterly common stock dividend of $0.405 per share. This marks Albemarle's 126 th consecutive quarterly cash dividend.
The dividend, which has an annualized rate of $1.62 , is payable July 1, 2025 , to shareholders of record at the close of business as of June 13, 2025 .
About Albemarle Â
Albemarle Corp. (NYSE: ALB) leads the world in transforming essential resources into critical ingredients for mobility, energy, connectivity and health. We partner to pioneer new ways to move, power, connect and protect with people and planet in mind. A reliable and high-quality global supply of lithium and bromine allows us to deliver advanced solutions for our customers. Learn more about how the people of Albemarle are enabling a more resilient world at Albemarle.com , LinkedIn and on X (formerly known as Twitter) @AlbemarleCorp .
Albemarle regularly posts information to www.albemarle.com , including notification of events, news, financial performance, investor presentations and webcasts, non-GAAP reconciliations, U.S. Securities and Exchange Commission filings and other information regarding the company, its businesses and the markets it serves.
Forward-Looking Statements
This press release contains statements concerning our expectations, anticipations and beliefs regarding the future, including, without limitation, statements related to future dividends and results, which may constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Actual results could differ materially from the views expressed. Factors that could cause actual results to differ materially from the statements expressed or implied in any forward-looking statement include, without limitation: changes in economic and business conditions; expected market pricing of lithium and spodumene and other underlying assumptions and our 2025 outlook considerations; adverse changes in liquidity or financial or operating performance; changes in the demand for our products or the end-user markets in which our products are sold and the other factors detailed from time to time in the reports we file with the U.S. Securities and Exchange Commission, including those described under "Risk Factors" in our Annual Report on Form 10-K and our Quarterly Reports on Form 10-Q. These forward-looking statements speak only as of the date of this press release. We assume no obligation to provide any revisions to any forward-looking statements should circumstances change, except as otherwise required by securities and other applicable laws.
Media Contact: Peter Smolowitz, +1 (980) 308-6310, media@albemarle.com Â
Investor Relations Contact: +1 (980) 299-5700, invest@albemarle.com
View original content to download multimedia: https://www.prnewswire.com/news-releases/albemarle-announces-126th-consecutive-quarterly-common-stock-dividend-302447633.html
SOURCE Albemarle Corporation
News Provided by PR Newswire via QuoteMedia
About Altech Batteries Ltd: Â
Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.
The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.
Source:
Altech Batteries Ltd
Contact:
Corporate
Iggy Tan
Managing Director
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com
Martin Stein
Chief Financial Officer
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com
News Provided by ABN Newswire via QuoteMedia
Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to announce drill results from its 2025 maiden drill program at the Radar Ti-V-Fe Project, located near the port of Cartwright in Labrador, Canada.
The central zone of the Dykes River layered mafic intrusive complex exhibits a strong, accurate magnetic-high anomaly in regional magnetic surveys. The Company further defined its drill targets in 2024, after a detailed, ground-based geophysical program and surface sampling.
The initial 7-hole drill program (2,200 meters) has confidently tested the targets down to a depth of 200 meters, covering a 500-meter by 350-meter target panel.
Highlights:
Figure 1: 500m strike by 350m width magnetic anomaly drilled in winter 2025 program. (2024 Saga Metals. TMI Magnetic Survey).
Saga Metals Confirms Geological Success with the Drill:
Key drill intercepts from HEZ-01 & HEZ-04 (2 holes of the 7-hole program) include:
Description | DDH | FROM | TO | Length | Fe | TiO2 | V205 |
ID | m | m | m | % | % | % | |
Full Hole | HEZ-01 | 4.5 | 311 | 306.5 | 16.35 | 3.326 | 0.154 |
Layering Sequence_01 | HEZ-01 | 109.7 | 142.6 | 32.9 | 18.075 | 4.016 | 0.158 |
Layering Sequence_02 | HEZ-01 | 159.5 | 266 | 106.5 | 21.413 | 4.303 | 0.236 |
Highest Grade intercept | HEZ-01 | 167 | 198.5 | 31.5 | 25.954 | 5.339 | 0.284 |
Full Hole | HEZ-04 | 4.5 | 308 | 303.5 | 17.746 | 3.624 | 0.18 |
Layering Sequence_01 | HEZ-04 | 24 | 56 | 32 | 15.595 | 3.489 | 0.113 |
Layering Sequence_02 | HEZ-04 | 103 | 288 | 185 | 19.963 | 4.059 | 0.221 |
High Grade intercept_01 | HEZ-04 | 231 | 281 | 50 | 24.494 | 4.74 | 0.305 |
Table 1: Composite grades of HEZ-01 & HEZ-04
The SAGA team looked in detail at the assays of HEZ-01 & HEZ 04 and the geochemistry shows consistent relationship to Fe-Ti-V. Findings include over 200 meters of core in HEZ-04 and 130m in HEZ-01 which calculate over 25% titanomagnetite content of the sample and a promising group of samples such as a few seen in Table 2 which range as much as 60% titanomagnetite content.
Sample Number | DDH | FROM | TO | Length | Fe | TiO2 | V205 |
ID | m | m | m | % | % | % | |
1474069 | HEZ-01 | 63.29 | 63.59 | 0.3 | 39.5 | 9.4 | 0.339 |
1474276 | HEZ-01 | 198 | 198.5 | 0.5 | 43 | 9 | 0.512 |
1474242 | HEZ-01 | 181 | 181.5 | 0.5 | 39.2 | 8.2 | 0.438 |
1471661 | HEZ-04 | 241 | 241.5 | 0.5 | 41.6 | 7.9 | 0.522 |
1471663 | HEZ-04 | 242 | 242.5 | 0.5 | 38.3 | 7.8 | 0.5 |
Table 2: High-grade samples in correlation to higher Titanomagnetite content in samples.
Drilling also confirmed massive to semi-massive oxide layering, hosting titanium and vanadium mineralization, with significant widths up to 210 meters within the drill core. The geological context identified by Dr. Al Miller's petrographic studies has substantially advanced understanding of the Radar projects mineralization. These findings indicate a titanomagnetite mineralization system which is advantageous for simplified metallurgical processing and potentially improved economic outcomes.
The 2025 drill campaign represents 1/40 th of the approximately 20km long oxide layering zone identified at the Radar project. Following these encouraging results, Saga Metals plans to systematically expand exploration using proven and accurate methodologies—magnetic surveys followed by targeted drilling.
"We are very encouraged by these initial drilling results," commented Michael Garagan, CGO & Director of Saga Metals . "They validate our geological models and significantly expand our expectations for the entire Radar property. The Hawkeye Zone is just one of five primary targets currently identified; excitingly, this zone remains one of the smallest prospects. Our strategy moving forward will involve methodically advancing exploration and drilling at our highest-priority targets. The door is now open to roll out a standardized order of operations. We know these layers are anomalous based upon surface geochemistry. Exploration moving forward is ‘magnetic survey - drill – repeat' as we begin to survey the entirety of the oxide layering zone and prepare to identify the most prospective targets for the next drill program."
Figure 2: The prospective inferred ~20km aerial oxide layering zone on the Radar property. Compilation analytical geophysics as acquired from historical sources, which SAGA has proven confidence in after the 2024 field programs.
Radar Ti-V-Fe Property Overview:
The Company's 100%-owned Radar Property is located 10 km from the coastal city of Cartwright, Labrador, benefiting from tremendous infrastructure including, road access, deep-water port, airstrip and nearby hydro-electric power. The Radar Property comprises 21,750-hectares and entirely encloses the Dykes River intrusive complex.
The Dykes River intrusive complex is a recently recognized Mesoproterozoic layered mafic intrusion (Gower, 2017). It has gained attention due geological similarities to large AMCG-type intrusions and a very extensive titanium–vanadium–iron (Ti-V-Fe) rich layer.
Regional airborne magnetic surveys first highlighted the mafic oxide layer and indicated an arcuate 20 km long exploration target.
Figure 3: Map of the Radar project highlighting the oxide layering as well as road access and proximity to the town of Cartwright, Labrador. Compilation analytical geophysics as acquired from historical sources, which SAGA has proven confidence in after the 2024 field programs.
About Saga Metals Corp.
Saga Metals Corp. is a North American mining company focused on the exploration and discovery of critical minerals that support the global transition to green energy. The company's flagship asset, the Double Mer Uranium Project, is located in Labrador, Canada, covering 25,600 hectares. This project features uranium radiometrics that highlight an 18km east-west trend, with a confirmed 14km section producing samples as high as 0.428% U 3 O 8 and uranium uranophane was identified in several areas of highest radiometric response (2024 Double Mer Technical Report).
In addition to its uranium focus, SAGA owns the Legacy Lithium Property in Quebec's Eeyou Istchee James Bay region. This project, developed in partnership with Rio Tinto, has been expanded through the acquisition of the Amirault Lithium Project. Together, these properties cover 65,849 hectares and share significant geological continuity with other major players in the area, including Rio Tinto, Winsome Resources, Azimut Exploration, and Loyal Lithium.
SAGA also holds additional exploration assets in Labrador, where the company is focused on the discovery of titanium, vanadium, and iron ore. With a portfolio that spans key minerals crucial to the green energy transition, SAGA is strategically positioned to play an essential role in the clean energy future.
On Behalf of the Board of Directors
Mike Stier, Chief Executive Officer
For more information, contact:
Saga Metals Corp.
Investor Relations
Tel: +1 (778) 930-1321
Email: info@SAGAmetals.com
www.SAGAmetals.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release. Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Qualified Person
Paul J. McGuigan, P. Geo is an Independent Qualified Person as defined under National Instrument 43-101 and has reviewed and approved the technical information related to the Radar Ti-V Project disclosed in this news release.
Cautionary Disclaimer
This news release contains forward-looking statements within the meaning of applicable securities laws that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipates", "expects", "believes", and similar expressions or the negative of these words or other comparable terminology. All statements other than statements of historical fact, included in this release are forward-looking statements that involve risks and uncertainties. In particular, this news release contains forward-looking information pertaining to the Company's Radar project drill assays. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage, risks and uncertainties involved in the mineral exploration and development industry, and the risks detailed in the Company's final prospectus in Manitoba and amended and restated final prospectus for British Columbia, Alberta and Ontario dated August 30, 2024, filed under its SEDAR+ profile at www.sedarplus.ca, and in the continuous disclosure filings made by the Company with securities regulations from time to time. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The forward-looking statements contained in this news release are made as of the date of this news release and the Company will update or revise publicly any of the included forward-looking statements only as expressly required by applicable law.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/bd6c2183-a69b-4814-9dfa-46184799bfcf
https://www.globenewswire.com/NewsRoom/AttachmentNg/cad7879b-f21f-49af-9809-44b25895bc37
https://www.globenewswire.com/NewsRoom/AttachmentNg/47915200-fc3f-450c-898a-e1f5c03452e9
News Provided by GlobeNewswire via QuoteMedia
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â