Lithium

Infinity Stone Hits Massive Graphite on Second Rockstone Step-Out Hole

Infinity Stone Hits Massive Graphite on Second Rockstone Step-Out Hole

Highlights

  • Infinity Stone has completed drilling of the RS-22-04 step out drillhole
  • RS-22-04 intersected 10.9 metres of semi-massive to massive graphite in addition to 8.8 metres of semi-massive to massive sulphides
  • The total known strike length of the Rockstone graphitic unit is now approximately 80 metres and remains open along strike

Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone"), is pleased to provide an update on its Fall drill program (the "Fall Drill Program") on the Rockstone Graphite project located near Thunder Bay, Ontario ("Rockstone" or the "Rockstone Graphite Project").

The Company has completed the drilling of RS-22-04, collared 15 metres to the northeast of RS-22-03. RS-22-04 is a step-out of the GC-12-01, RS-22-01, and RS-22-03 holes.

RS-22-04 intersected a 10.9-metre interval of semi-massive to massive graphite from 86.0 to 96.9 metres, directly adjacent to 8.8-metre interval of massive sulphides from 77.2 to 86.0 metres, successfully extending the previously-announced graphite zone identified in RS-22-03, northward. The total known strike length of the Rockstone graphitic unit is now approximately 80 metres and remains open along strike. Early observations suggest that the massive sulphide horizon represents VMS-type mineralization.

Rockstone hosts 18 additional high-priority drill-ready VMS-type EM (electromagnetic) targets generated by Maxwell Modelling of data derived from the 2007 Sabina VTEM survey. All additional targets are highly prospective for both graphite and VMS-hosted metals. Additional targets north of the original claim block are presently being modelled for drilling parameters.

"We are very pleased to hit mineralization in the second step-out hole of our Fall Drill Program. With a better understanding of the structure now we will be able to make a better determination as to next steps in the exploration of Rockstone," said Zayn Kalyan, CEO of Infinity Stone. "Immediate next steps will likely include conducting downhole geophysics, as well as additional drilling of previously identified drill targets. With both the assays from drill core from this program, and the current metallurgical program underway at SGS, there are many near term catalysts in the pipeline," furthered Mr. Kalyan.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8151/146826_0019cf9ee424790c_001.jpg

Figure 1: Core Photo - RS-22-04 Graphitic and Sulphide Intervals - 77.2 to 88.3 m

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/8151/146826_0019cf9ee424790c_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8151/146826_0019cf9ee424790c_002.jpg

Figure 2: Core Photo - RS-22-04 Graphitic Interval - 88.3 to 96.9 m

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/8151/146826_0019cf9ee424790c_002full.jpg

About Rockstone Graphite Project

The Rockstone Graphite Project is located 45 km west of the seaway port at the City of Thunder Bay, Ontario Canada. The Project has excellent access by logging haul roads that connect to paved/gravel roads with nearby railways and a shipping port. Based upon the reprocessed Versatile Time Domain Electromagnetic (VTEM) survey completed by Sabina Silver Corporation in 2007, there are 18 drill-ready electromagnetic targets. Greencastle's drilling in 2012 consisted of 4 diamond drillholes (916 metres). Diamond drill hole GC-12-01 intersected a 24 metre interval averaging 0.82% zinc and 0.15% copper within a graphitic argillite unit. Analysis of the pulps for the 24 metres returned a value of 25% Cg (graphitic carbon) using a LECO analytical procedure. Rockstone graphite morphology appears to be highly-ordered hexagonal graphite crystallites and crystallite agglomerates, likely formed by hydrothermal activity at a formation temperature of 702C.

Qualified Person

Technical information in this news release has been reviewed and approved by Case Lewis, P.Geo., a "Qualified Person" as defined under NI 43-101 Standards of Disclosure for Mineral Projects and a director of the Company.

About Infinity Stone Ventures

Infinity Stone's mission is to be a diversified, single source supplier for the critical energy metals being used in the clean energy revolution alongside its established SaaS solution portfolio. Infinity Stone is meeting the demand from battery and wind turbine manufacturers, nuclear and hydrogen energy producers, and energy metals speculators by acquiring 100% interest in critical mineral deposits and occurrences in stable mining-friendly jurisdictions, close to final use destinations in North American manufacturing hubs.

To register for investor updates please visit https://infinitystone.ventures.

Connect with Infinity Stone

Email | Website | Facebook | LinkedIn | Twitter | Instagram |

Infinity Stone Contact
Zayn Kalyan
CEO and Director
Direct: 778-938-3367
zayn@altuscapital.ca

The Canadian Securities Exchange has not reviewed, approved or disapproved the content of this news release.

Forward-Looking Statements Disclaimer

This press release contains "forward-looking information" within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward-looking statements. Although forward-looking statements contained in this press release are based upon what management of Company believes are reasonable assumptions, there can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements may also be affected by risks and uncertainties in the business of the Company, including those described in the Company's public filings available on www.SEDAR.com. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/146826

News Provided by Newsfile via QuoteMedia

GEMS:CNX
Infinity Stone Ventures (CSE:GEMS, OTC:GEMSF)

Infinity Stone Ventures


Keep reading...Show less
Infinity Stone Options 38,441ha Sugar Loaf and Little Dipper Lithium Projects Near Sigma Lithium in Minas Gerais Province, Brazil

Infinity Stone Options 38,441ha Sugar Loaf and Little Dipper Lithium Projects Near Sigma Lithium in Minas Gerais Province, Brazil

Highlights

  • Infinity Stone has optioned the Sugar Loaf and Little Dipper lithium projects, collectively covering 38,441 hectares.
  • The Sugar Loaf Project covers 22,195 hectares, located approximately 15 kilometres from Sigma Lithium's Grota do Cirilo Project, located in the state of Minas Gerais, Brazil .
  • The Little Dipper Project covers 16,246 hectares, located approximately 10 kilometres from Oceana's Solonopole Lithium Project in the state of Ceará, Brazil .

Infinity Stone Ventures Corp. (CSE: GEMS) (OTC: GEMSF) (FSE: B2I) (the " Company " or " Infinity Stone "), is pleased to announce that it has optioned the 38,441-hectare Sugar Loaf and Little Dipper Lithium Projects (the " Sugar Loaf Project " and " Little Dipper Project ", respectively; collectively, the " Projects "). The Sugar Loaf Project is located 15 kilometres from both Sigma Lithium Resources' (" Sigma Lithium ") Grota do Cirilo Project and Lithium Ionic Inc's (" Lithium Ionic ") Itinga Project in the state of Minas Gerais, Brazil . The Little Dipper Project is located in the state of Ceará, approximately 10 kilometres from Oceana Lithium Ltd.'s ( "Oceana ") Solonopole Lithium Project. The Sugar Loaf Project comprises 13 exploration permits, while the Little Dipper Project comprises 9 exploration permits. (Figures 1 & 2) .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Infinity Stone Further Expands Project, Including Historic Lithium Samples, near Patriot Battery Metals Corvette Discovery

Infinity Stone Further Expands Project, Including Historic Lithium Samples, near Patriot Battery Metals Corvette Discovery

Highlights

  • Infinity Stone expands its land position to over 5,546 hectares, as well as a pending application for two additional claims in James Bay Lithium District adjacent to and near Patriot Battery Metals Corvette discovery.
  • Further exploration and project expansion is being conducted in the context of the new discovery and significant drilling results from PMET and Winsome in the Corvette Lithium Trend in James Bay, QC.

Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone"), is pleased to announce that it has acquired and staked an additional 359 hectares, as well as a pending application for two additional claims (the "New Claims") on its Camaro Hellcat Lithium Project (the "Camaro Hellcat Project"), with claim blocks adjacent to Patriot Battery Metals' ("PMET" or "Patriot") Corvette Project in the James Bay Region of Quebec, bringing its total land position to 5,546 hectares in addition to the currently pending cells. The New Claims include historical surface samples returning 57ppm Li, sampled and assayed in 2016, and a 30ppm Li sample in 1997 (the "Historic Samples").1 The Historic Samples were found to the west of Winsome Resources Cancet Project and PMET's Corvette Lithium Project, north of the Taiga Highway. There are at least 4 historical mapped pegmatites on the New Claims, and the Company intends to conduct further exploration to identify any other potential pegmatites that may be found on the New Claims.

The New Claims are also located near Winsome Resources Ltd.'s ("Winsome") Cancet discovery drill hole (the "Cancet Property"). Winsome's best results at Cancet have included 1 metre at 5.65% Li2O from 36.5 metres and six metres at 1.95% Li2O from 36.45 metres.2 Furthermore, the New Claims are adjacent to a number of claims currently held by Jody Dahrouge, President and Owner of Daroughe Geological Consulting Ltd., a consultant and contractor to PMET. PMET has recently announced that it had drilled 52.2 metres of 3.34% LI2O, including 15.0 metres of 5.10% LI2O.

Infinity Stone intends to conduct a focused exploration program on the Hellcat claim block, alongside an initial prospecting program on the New Claims, in the early spring and will leverage the results of the Winter Geophysics Program announced on January 19, 2023 in targeting sampling and trenching. The Survey will further enable the mapping and delineation of the pegmatitic units across the claim blocks.

"We are excited to further expand the Hellcat Camaro Project in James Bay near Patriot's Corvette discovery. As the spring exploration season rapidly approaches, we are renewing our focus on the project and are actively evaluating new claim blocks that are adjacent and near the current project footprint," said Zayn Kalyan, CEO of Infinity Stone. "The James Bay region, specifically the CV lithium trend discovered by PMET, is quickly becoming the epicentre of lithium exploration in North America and we are excited to have a prospective land package in the region. We are looking forward to being able to get back on the ground with more data following our geophysics program to conduct a renewed and focused exploration program," furthered Mr. Kalyan.

Terms of Acquisition

Pursuant to the acquisition of 100% interest in 154 hectares of the New Claims, the Company has agreed to (i) paying $6,000 in cash and issuing 200,000 subordinate voting shares ("Shares") of the Company to the claim vendor Donovan Explorations Ltd.

About the Hellcat Camaro Lithium Project

The 5,546-hectare Hellcat Camaro Lithium Project is located adjacent to Patriot Battery Metals' Corvette Property, in the James Bay Region of Quebec, approximately 235 kilometres east of Radisson, Quebec and 245 kilometres northeast of the Cree village municipality of Nemaska. The Project has four property blocks, the Taiga, Hellcat, and Camaro, collectively covering 3,850 hectares adjacent to Patriot Battery Metals' Corvette Lithium discovery in the James Bay Region of Quebec. PMET has recently returned significant high-grade results at the Corvette Lithium Project, including 156.9 m at 2.12% Li2O (176.4 m to 333.4 m), including 25.0 m at 5.04% Li2O (CV22-083).1

Qualified Person

Technical information in this news release has been reviewed and approved by Case Lewis, P.Geo., a "Qualified Person" as defined under NI 43-101 Standards of Disclosure for Mineral Projects and a director of the Company.

About Infinity Stone Ventures

Infinity Stone's mission is to be a diversified, single source supplier for the critical energy metals being used in the clean energy revolution alongside its established SaaS solution portfolio. Infinity Stone is meeting the demand from battery and wind turbine manufacturers, nuclear and hydrogen energy producers, and energy metals speculators by acquiring 100% interest in critical mineral deposits and occurrences in stable mining-friendly jurisdictions, close to final use destinations in North American manufacturing hubs.

To register for investor updates please visit https://infinitystone.ventures.

INVESTOR PRESENTATION

Connect with Infinity Stone

Email | Website | Facebook | LinkedIn | Twitter | Instagram |

Infinity Stone Contact
Zayn Kalyan
CEO and Director
Direct: 778-938-3367
zayn@altuscapital.ca

The Canadian Securities Exchange has not reviewed, approved or disapproved the content of this news release.

Forward-Looking Statements Disclaimer

This press release contains "forward-looking information" within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward-looking statements. Although forward-looking statements contained in this press release are based upon what management of Company believes are reasonable assumptions, there can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements may also be affected by risks and uncertainties in the business of the Company, including those described in the Company's public filings available on www.SEDAR.com. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Infinity Stone Intersects 3.36% Cg over 101.0m, including 21.96% Cg over 4.32m at Rockstone Graphite Project

Infinity Stone Intersects 3.36% Cg over 101.0m, including 21.96% Cg over 4.32m at Rockstone Graphite Project

Highlights

  • Infinity Stone encounters 3.36% Cg and 0.13% Zn over 101.0m, including 21.96% Cg and 0.78% Zn over 4.32m from RS-22-03, 10.86% Cg and 0.42% Zn over 14.0m including 17.94% Cg and 0.60% Zn over 7.0m from RS-22-04, and 15.68% Cg and 0.56% Zn over 4.83m, including 24.05% Cg and 0.72% Zn over 2.33m from RS-22-01.
  • All of the drill holes from the Fall Drill Program which returned elevated graphite levels, with significant mineralization and grade comparable with drilling results from other graphite discoveries, including Nouveau Monde Graphite's Matawinie Mine.
  • Significant continued exploration potential with latest results, including the discovery of gold in VMS-type exhalite mineralization, intersecting 1.70 g/t Au over 2.0 m in RS-22-02.
  • Infinity Stone intends to immediately mobilise for an extended drill program to extend RS-22-02 to determine further gold mineralization, alongside additional step-out holes.

Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone") is pleased to provide an update on its Fall drill program (the "Fall Drill Program") on the Rockstone Graphite project located near Thunder Bay, Ontario ("Rockstone" or the "Rockstone Graphite Project").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Infinity Stone to Fly Airborne Geophysics at Camaro Hellcat Lithium Project in James Bay, Quebec

Infinity Stone to Fly Airborne Geophysics at Camaro Hellcat Lithium Project in James Bay, Quebec

Highlights

  • Infinity Stone intends to conduct an airborne magnetic gradiometer survey at the Camaro Hellcat Lithium Project, adjacent to PMET's Corvette Lithium Discovery, with the goal of understanding regional geology to inform future prospecting and drill targets.
  • Geophysics results will enable a focused exploration program on the Hellcat claim block in the early Spring.

Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone") is pleased to announce it intends to conduct an airborne magnetic gradiometer survey ("Winter Geophysics Program" or the "Survey") on its Camaro Hellcat Lithium Project (the "Camaro - Hellcat Project") adjacent to Patriot Battery Metals' ("PMET" or "Patriot") Corvette Lithium Discovery in the James Bay Lithium District of Quebec. The goal of the survey will be to gain a greater understanding of the regional geology to inform future prospecting and drill targets. The intended survey will be approximately 918 line-km over the Hellcat, Camaro, and Taiga claim blocks, with detailed line spacing of 100 metres, and more detailed line spacing over the Hellcat claims.

Infinity Stone intends to conduct a focused exploration program on the Hellcat claim block in the early spring and will leverage the results of the Winter Geophysics Program in targeting sampling and trenching. The Survey will further enable the mapping and delineation of the pegmatitic units across the claim blocks.

The Hellcat claims are underlain by 9 km of strike length of underexplored greenstone and metasediments of the Mesoarchean Rouget formation and Neoarchean Marbot formation, respectively. The under-explored Rouget formation greenstone belt represents an attractive exploration target which is geologically similar and proximal to the Guyer Group greenstone, which hosts the PMET Corvette Pegmatites.

"We are excited to push forward with exploration on the Camaro Hellcat Lithium Project. Given PMET's recent high-grade drilling results, including 156.9 m at 2.12% Li2O (176.4 m to 333.4 m), including 25.0 m at 5.04% Li2O (CV22-083)[1], we are eager to gain a further understanding of the project ahead of an extensive exploration program in the spring", said Zayn Kalyan, CEO of Infinity Stone.

About the Hellcat Camaro Lithium Project

The 5,187-hectare Hellcat Camaro Lithium Project is located adjacent to Patriot Battery Metals' Corvette Property, in the James Bay Region of Quebec, approximately 235 kilometres east of Radisson, Quebec and 245 kilometres northeast of the Cree village municipality of Nemaska. The Project has three property blocks, the Taiga, Hellcat, and Camaro, collectively covering 3,850 hectares adjacent to Patriot Battery Metals' Corvette Lithium discovery in the James Bay Region of Quebec. PMET has recently returned significant high-grade results at the Corvette Lithium Project, including 156.9 m at 2.12% Li2O (176.4 m to 333.4 m), including 25.0 m at 5.04% Li2O (CV22-083).1

Qualified Person

Technical information in this news release has been reviewed and approved by Case Lewis, P.Geo., a "Qualified Person" as defined under NI 43-101 Standards of Disclosure for Mineral Projects and a director of the Company.

About Infinity Stone Ventures

Infinity Stone's mission is to be a diversified, single source supplier for the critical energy metals being used in the clean energy revolution alongside its established SaaS solution portfolio. Infinity Stone is meeting the demand from battery and wind turbine manufacturers, nuclear and hydrogen energy producers, and energy metals speculators by acquiring 100% interest in critical mineral deposits and occurrences in stable mining-friendly jurisdictions, close to final use destinations in North American manufacturing hubs.

To register for investor updates please visit https://infinitystone.ventures.

Connect with Infinity Stone

Email | Website | Facebook | LinkedIn | Twitter | Instagram |

Infinity Stone Contact
Zayn Kalyan
CEO and Director
Direct: 778-938-3367
zayn@altuscapital.ca

The Canadian Securities Exchange has not reviewed, approved or disapproved the content of this news release.

Forward Looking Statements Disclaimer

This press release contains "forward-looking information" within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward-looking statements. Although forward-looking statements contained in this press release are based upon what management of Company believes are reasonable assumptions, there can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements may also be affected by risks and uncertainties in the business of the Company, including those described in the Company's public filings available on www.SEDAR.com. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking statements.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Infinity Stone Intersects Gold Mineralization at Rockstone Project

Infinity Stone Intersects Gold Mineralization at Rockstone Project

Highlights

  • Infinity Stone has intersected 1.70 g/t Au over 2.0 m from its Fall Drill Program at the Rockstone Graphite Project.
  • Gold intersection represents a new regional gold discovery and appears to be associated with Rockstone Cu/Zn/graphite VMS-type exhalite mineralization.
  • Company's technical team is awaiting remaining assay results from the Fall Drill Program at Rockstone and will publish consolidated data in coming weeks.

 Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: TLOOF) (FSE: B2I) (the "Company" or "Infinity Stone") announces that it has intersected 1.70 gt Au over 2.0 metres from its Fall drill program (the "Fall Drill Program") on the Rockstone Graphite project located near Thunder Bay, Ontario ("Rockstone" or the "Rockstone Graphite Project"). RS-22-02 encountered the 2.0-metre interval of gold mineralization from 198 metres to the drillhole's final depth of 200 metres, terminating in the mineralized lithology of intermediate volcanics with quartz veining. The Company completed drilling of 4 holes, RS-22-01, RS-22-02, RS-22-03, and RS-22-04, totalling 800.0 metres. The Au intersection represents a new regional gold discovery and appears to be associated with Rockstone CuZngraphite VMS-type exhalite mineralization.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
TINONE DISCOVERS LITHIUM AT ITS 100%-OWNED ABERFOYLE PROJECT IN TASMANIA, AUSTRALIA WHILE PROSPECTING FOR TIN AND TUNGSTEN

TINONE DISCOVERS LITHIUM AT ITS 100%-OWNED ABERFOYLE PROJECT IN TASMANIA, AUSTRALIA WHILE PROSPECTING FOR TIN AND TUNGSTEN

TSX.V: TORC   OTCQB: TORCF

TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) (" TinOne " or the " Company ") is pleased to announce it has sampled highly elevated lithium grades from its 100%-owned 9,600 hectare Aberfoyle Project (" Aberfoyle " or the " Project ") located in the tier-one mining jurisdiction of Tasmania, Australia .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Ultra Lithium Intersects 2.68 Percent Lithium Oxide at The Forgan Lake Lithium Property in Northern Ontario, Canada

Ultra Lithium Intersects 2.68 Percent Lithium Oxide at The Forgan Lake Lithium Property in Northern Ontario, Canada

Ultra Lithium Inc. ( TSX-V:ULT, OTCQB: ULTXF and Frankfurt: QFB ) ("Ultra Lithium" or "the Company") is pleased to announce that the Company has received the first batch of drilling results from four diamond drill holes at its 100% owned Forgan Lake Lithium Property in northwestern Ontario, Canada. The drilling was contracted to Diafore Drilling Inc. from Quebec who completed 31 NQ and HQ size core drill holes with a cumulative drilling of 3,635 metres. The results of four drill holes intersected lithium pegmatites of various widths (see Table 1 and 2 for details).

Highlights

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Argentina Lithium to Present at the Emerging Growth Conference and Invites Individual and Institutional Investors as well as Advisors and Analysts, to Attend Its Real-Time, Interactive Presentation

Argentina Lithium to Present at the Emerging Growth Conference and Invites Individual and Institutional Investors as well as Advisors and Analysts, to Attend Its Real-Time, Interactive Presentation

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTC: PNXLF), ("Argentina Lithium" or the "Company") is pleased to announce that it has been invited to present at the Emerging Growth Conference on February 8, 2023 .

Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.)

The next Emerging Growth Conference is presenting on February 8, 2023 . This live, interactive online event will give existing shareholders and the investment community the opportunity to interact with the Company's VP Exploration, Miles Rideout , in real time.

Mr. Rideout will perform a presentation and may subsequently open the floor for questions. Please submit your questions in advance to Questions@EmergingGrowth.com or ask your questions during the event and Mr. Rideout will do his best to get through as many of them as possible.

Argentina Lithium & Energy Corp. will be presenting at 3:10 PM Eastern time .

Please register here to ensure you are able to attend the conference and receive any updates that are released.

https://goto.webcasts.com/starthere.jsp?ei=1589451&tp_key=60f8292c14&sti=pnxlf

If attendees are not able to join the event live on the day of the conference, an archived webcast will also be made available on EmergingGrowth.com and on the Emerging Growth YouTube Channel, http://www.YouTube.com/EmergingGrowthConference . We will release a link to that after the event.

About the Emerging Growth Conference

The Emerging Growth conference is an effective way for public companies to present and communicate their new products, services and other major announcements to the investment community from the convenience of their office, in a time efficient manner.

The Conference focus and coverage includes companies in a wide range of growth sectors, with strong management teams, innovative products & services, focused strategy, execution, and the overall potential for long term growth. Its audience includes potentially tens of thousands of Individual and Institutional investors, as well as Investment advisors and analysts.

All sessions will be conducted through video webcasts and will take place in the Eastern time zone.

About Argentina Lithium

Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them toward production in order to meet the growing global demand from the battery sector. The management group has a long history of success in the resource sector of Argentina and has assembled a first-rate team of experts to acquire and advance the best lithium properties in the "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

ON BEHALF OF THE BOARD

"Nikolaos Cacos"

____________________________
Nikolaos Cacos , President, CEO and Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements.  Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: the impact of COVID-19; risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations. Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's public disclosure documents for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/argentina-lithium-to-present-at-the-emerging-growth-conference-and-invites-individual-and-institutional-investors-as-well-as-advisors-and-analysts-to-attend-its-real-time-interactive-presentation-301741225.html

SOURCE Argentina Lithium & Energy Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2023/07/c3557.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Releases Cobalt - Nickel Assays of 11 and 4 Percent Respectively from Concentrate of Castle Mine Waste Rock

Canada Silver Cobalt Releases Cobalt - Nickel Assays of 11 and 4 Percent Respectively from Concentrate of Castle Mine Waste Rock

(TheNewswire)

Canada Silver Cobalt Works Inc.

Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt: 4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to announce that it has completed re-processing waste rock material from Castle Mine for battery minerals, in Gowganda, Ontario

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Releases Cobalt - Nickel Assays of 11 and 4 Percent Respectively from Concentrate of Castle Mine Waste Rock

Canada Silver Cobalt Releases Cobalt - Nickel Assays of 11 and 4 Percent Respectively from Concentrate of Castle Mine Waste Rock

Canada Silver Cobalt Works Inc. (TSXV: CCW) (OTCQB: CCWOF) (FSE: 4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to announce that it has completed re-processing waste rock material from Castle Mine for battery minerals, in Gowganda, Ontario.

"Re-processing the mine waste rock to limit the amount of soluble metals entering the water and into the surrounding water shed, thereby contributing to the global green incentives," commented Frank J. Basa, B.Eng., CEO, "reinforcing our ESG commitments."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Nevada Sunrise Intersects 929.8 ppm Lithium over 1,130 feet at the Gemini Lithium Project, Nevada

Nevada Sunrise Intersects 929.8 ppm Lithium over 1,130 feet at the Gemini Lithium Project, Nevada

Nevada Sunrise Metals Corp. ("Nevada Sunrise", or the "Company") (TSXV: NEV) is pleased to announce that the Company has received final geochemical analyses for lithium mineralization in sediments and groundwater collected from borehole GEM22-03, drilled at its 100%-owned Gemini Lithium Project ("Gemini") located in the Lida Valley basin in Esmeralda County, Nevada . Drilling of borehole GEM22-03 began on October 18, 2022 and was completed to a depth of 1,620 feet (493.90 metres) on December 16, 2022 .

Highlights of GEM22-03
  • Borehole GEM22-03 intersected 929.80 parts per million ("ppm") lithium-in-sediment over 1,130 feet from 280 feet (85.37 metres) to 1,410 feet (344.51 metres), including 1,342.20 ppm lithium over 350 feet (106.71 metres) and 1,955 ppm lithium over 30 feet (9.15 metres) (see Table 1 below for greater detail on mineralized intervals);
  • GEM22-03 was completed at a location approximately 0.47 miles (0.76 kilometres) north of GEM22-01 and 1.14 miles (1.83 kilometres) north of GEM22-02, thereby successfully extending the lithium mineralized zone to the north.
  • Groundwater sample analyses showed anomalous concentrations of lithium in groundwater flows intersected within the hole, including two significant intervals of 120 milligrams/litre lithium ("mg/L") in a water flow of 14.22 gallons per minute ("gpm") from 1,100 to 1,120 feet (335.37 to 341.46 metres), and 110 mg/L lithium in a water flow of 16.4 gpm from 1,200 to 1,220 feet (365.85 to 371.95 metres).

Table 1.  Final Lithium-in-Sediment analytical results from borehole GEM22-03

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×