Grid Battery Metals Announces Soil Sample Results at the Texas Springs Nevada Lithium Project Showing Average Lithium Grades of 2010 ppm

Grid Battery Metals Announces Soil Sample Results at the Texas Springs Nevada Lithium Project Showing Average Lithium Grades of 2010 ppm

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - December 14, 2023 - Grid Battery Metals Inc. (the "Company" or "Grid Battery") ( TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2 ) announces the completed soil sample results from the first phase of its fall exploration program at its Texas Springs Property near Elko Nevada.

Background: Grid's Texas Spring Nevada Lithium Property

The Texas Springs Lithium Property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") ( TSXV: NILI, OTC: NILIF ). Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. On September 12, 2023, Surge announced some exciting results of its most recent drilling program at this property, and recorded its highest grades to date, with up to 8070 ppm Lithium on the Northern Nevada Lithium project. These results were followed up on December 5, 2023 with a subsequent drill program yielding core drilling intercepts with assays over 7,630 ppm and multiple horizons upon deeper drilling performed.


Click Image To View Full Size

Texas Spring Lithium Property Soil Sample Grid


Click Image To View Full Size


Click Image To View Full Size

Tim Fernback, Grid President & CEO comments "Now that the first phase of the exploration program is complete, we plan to gather as a group to interpret the geological data and plan our next steps at Texas Springs for the upcoming 2024 exploration season. We have some encouraging results to discuss, which is great news for our shareholders."

Mr. Seth Cude, P.G., Grid's Qualified Person comments on the results of the program "The soil sampling shows zones of strong lithium concentrations in the northwestern region of the Texas Spring Lithium property which are on trend with strong soil results from Surge Battery Metal's Nevada North Lithium project. In addition, the CSAMT data shows the Texas Spring Property exhibits several near horizontal to gently dipping subsurface horizons which may have served as paleo accumulation basins, collecting lithium bearing clays. This information, combined with the soil assay, will help us propose excellent future drilling targets."

Soil Sample Summary Results (Phase 1 Exploration Plan)

Highlights:

  • High grade zone in the north of 1000ppm at lengths of 850 m x 475 m and a second high grade zone to the south of with lengths of 200 x 175 m

  • Clear high grade lithium zone in the northern portion of the project area is on trend with the high-grade soil samples collected in the Surge property to the north

  • There are 6 soil samples with Li grades over 3,000 ppm.

  • A total of 810 samples were collected with values ranging from 10ppm to 5610 ppm

  • 40 samples had grades = 1000 ppm

  • Using a 1000 ppm cutoff there was an average of 2010 ppm

QA/QC

Duplicate samples were taken approximately 1 in every 20 and showed excellent correlation with the originals with an r 2 value of 0.9963 and a difference in average values of 2%. Standards were also inserted approximately 1 in 20 and showed an average variation of 7% with a range of 40ppm.

Sampling Protocols

GPS units with the sample locations loaded were used by the field crew to locate the sample location, and tracks GPS are taken to locate the actual location of the soil sample. Samples were taken from the b horizon and composited and sieved over a depth of 10 to 12 inches, which is standard sampling methodology for soils. Samples were transported and secured by Rangefront from the site and then were transported directly to ALS labs in Elko by Rangefront. The samples were dried and sieved to 180 microns (80 mesh) and assayed using 36 element ME-ICP41 aqua regia analysis.

Tim Fernback, Grid President & CEO comments "Completing both a detailed geophysical survey and soil sampling program is part of a methodical and systematic approach to high quality mineral exploration for claystone lithium deposits in Nevada and will allow us to select drill targets for subsequent exploration programs in the future. "

Qualified Person

Mr. Seth Cude, P.G. is a Qualified Person as defined by National Instrument 43-101 and has approved the technical information contained within this news release.

About Grid Battery Metals Inc.

Grid Battery Metals Inc. is a Canadian based exploration company whose primary listing is on the TSX Venture Exchange. The Company's maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market. www.gridbatterymetals.com .

About Texas Springs Property

The Company owns a 100% interest in the Texas Spring Property which consists of mineral lode claims located in Elko County, Nevada. The Property is in the Granite Range southeast of Jackpot, Nevada, about 73 km north-northeast of Wells, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the Humbolt Formation.

The Texas Spring property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") ( TSXV: NILI, OTC: NILIF ) and comprised of 303 mineral claims. Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. (Press release March 29, 2023 ). More recent results have shown higher grade lithium up to 8070 ppm on this property after initial drilling (Press release September 12, 2023 ).

About Clayton Valley Lithium Project

The Company owns a 100% interest in 113 lithium lode and placer claims covering over 640 hectares in Clayton Valley. Clayton Valley is a down-dropped closed basin formed by the Miocene age Great Basin extension and is still active due to movement along the Walker Lane structural zone. As a result, the basin has preserved multiple layers of lithium bearing volcanic ash, resulting from multiple eruptive events over the past 6 million years including eruptions from the 700,000-year-old Long Valley Caldera system and related events. These ash layers are thought to contribute to the lithium brines extracted by Albemarle and are also likely involved in the formation of the exposed lithium rich clay deposits on the east side of Clayton Valley.

Volt Canyon Lithium Property

The Company owns a 100% interest in 80 placer claims covering approximately 635 hectares of alluvial sediments and clays located 122 km northeast of Tonopah, Nevada.

About the British Columbia, Nickel Projects

The Mount Sidney Williams Group consists of three claim blocks with a total area of 10,569 hectares in the area surrounding Mount Sidney Williams, both adjoining and near the Decar project of FPX Nickel Corp., located 100 kilometres northwest of Fort St. James, B.C., in the Omineca mining division. Metallic mineralization includes nickel, cobalt, and chromium. At least some of the nickel mineralization occurs as awaruite. The Mitchell Range Group area claim consists of one claim block covering 8,659 hectares with demonstrated metallic mineralization including nickel, cobalt, and chromium. Nickel cobalt mineralization has not been well explored, but the presence of awaruite has been documented.

On Behalf of the Board of Directors

"Tim Fernback"

Tim Fernback, President & CEO

Contact Information:

Email: info@gridbatterymetals.com

Phone: 604- 4 28-5690

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements.

Copyright (c) 2023 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

CELL:CC
Grid Battery Metals

Grid Battery Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Grid Battery Metals

Grid Battery Metals


Keep reading...Show less
Grid Battery Announces Record Date and Effective Date for Spin-Out of AC/DC Battery Shares

Grid Battery Announces Record Date and Effective Date for Spin-Out of AC/DC Battery Shares

(TheNewswire)

Grid Battery Metals Inc..
  • Grid Battery Metals Inc. sets April 25, 2024 as the record date for the distribution to its shareholders of AC/DC shares

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Results of Annual General and Special Meeting of Shareholders

Grid Battery Results of Annual General and Special Meeting of Shareholders

Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) is pleased to announce the results of its Annual General and Special Meeting (the "Meeting") of shareholders of the Company held on April 9, 2024. All matters set out in its management information circular dated March 7, 2024 were approved with 99% voting in favour of all resolutions, including approval of the proposed plan of arrangement (the "Arrangement") for the previously announced spin-out by the Company of 9,414,040 common shares of its wholly owned subsidiary ACDC Battery Metals Inc. ("ACDC") to the shareholders of the Company and the Company will transfer to ACDC ownership of its Nickel Properties in British Columbia. The Company will keep shareholders apprised of the status of the closing of the Arrangement and the timing of the share dividend

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Grid Battery Re-Engages TD Media d/b/a Life Water Media to Provide Media Services

Grid Battery Re-Engages TD Media d/b/a Life Water Media to Provide Media Services

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - April 5, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL ) ( OTC:EVKRF ), ( FRA:NMK2) announces that the Company has re- engaged the services of TD Media LLC dba Life Water Media LLC ("Life Water Media") to help raise online marketing awareness and to provide a comprehensive digital media marketing campaign for the Company.  Life Water Media is based out of Sugar Land, Texas.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Exploration Team begins work on its Clayton Valley Lithium Project

Grid Battery Exploration Team begins work on its Clayton Valley Lithium Project

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - March 28, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV: CELL, OTCQB: EVKRF FRA: NMK2) is pleased announce that our 2024 Exploration Program has officially started on its Clayton Valley Lithium Project. The 2024 Exploration Program will begin with a Magnetotelluric (MT) geophysics survey performed by the KLM Geoscience ("KLM") as overseen by Grid's Qualified Professional, Mr. Steven McMillin P.G..

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery to begin the 2024 Exploration Program on its Clayton Valley Lithium Project

Grid Battery to begin the 2024 Exploration Program on its Clayton Valley Lithium Project

(TheNewswire)

Grid Battery Metals Inc..

Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV: CELL, OTCQB: EVKRF FRA: NMK2) is pleased announce that it will immediately begin the 2024 Exploration Program on its Clayton Valley Lithium Project. The planned exploration program is identified in the NI 43-101 Technical Report completed by Mr. Steven McMillin P.G. filed on SEDAR+ ( www.sedarplus.ca ) and viewed on the Company's website at Clayton Valley Technical Report

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
World Copper Closes Final Tranche of Over-Subscribed Non-Brokered Private Placement

World Copper Closes Final Tranche of Over-Subscribed Non-Brokered Private Placement

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper" or the "Company") reports that pursuant to their news releases dated February 27, 2024 and April 12, 2024, the Company has closed the final tranche of their non-brokered financing, issuing an additional 16,531,957 units for proceeds of $1,157,237. Aggregate totals from both tranches total 69,547,069 units for gross proceeds of $4,868,294.89.

Each unit consisted of one common share of the Company (a "Share") and one-half of one common share purchase warrant (a "Warrant"). Each whole Warrant entitles the holder to acquire one additional share of the Company for a period of two years from the date of issuance at a price of $0.17 per share. The expiry of the Warrants may be accelerated if the closing price of the Company's common shares on the TSX Venture Exchange ("TSXV") is equal to or greater than $0.30 for a minimum of twenty consecutive trading days and a notice of acceleration is provided in accordance with the terms of the Warrants.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Quetzal Copper Samples 3.8 M of 2.4% Copper Associated with EM Geophysical Target Extending to 350M Depth at Cristinas Project

Quetzal Copper Samples 3.8 M of 2.4% Copper Associated with EM Geophysical Target Extending to 350M Depth at Cristinas Project

Highlights:

  • Surface rock chip channel sample returns 3.8m of 2.4% Copper and 162 g/t Silver at the Cristinas mine target.
  • Geophysical survey over the mine target area shows a conductor associated with mineralization that extends, untested, to at least 350m depth beneath historic shallow drilling.
  • A second conductor in the hanging wall of the mine target adds an additional drill target.
  • Drilling commencing in May 2024 to test open copper intercepts and geophysical targets at the Cristinas project.

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company"), a copper-focused exploration company, is pleased to announce the results of the due diligence surface rock sampling campaign and geophysical survey at the Cristinas Project, Chihuahua Mexico.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Interra Provides Rip Copper Molybdenum Project Exploration Update

Interra Provides Rip Copper Molybdenum Project Exploration Update

Interra Copper Corp. (CSE: IMCX) (OTCQB: IMIMF) (FSE: 3MX) ("Interra" or the "Company") is pleased to provide detail of the first phase exploration program at the Rip Copper Project (the "Project" or "Rip") in the Stikine region of British Columbia. The Rip Project is situated approximately 33 km northeast of Imperial Metals' past producing Huckleberry copper-molybdenum ("Cu-Mo") mine (see Figure 1), which is presently on care and maintenance. Imperial Metals Corporation is exploring Huckleberry and its surrounding claims for additional Cu-Mo resources.

In late 2023, the Company first announced its option agreement with ArcWest Exploration Inc. ("ArcWest") to acquire an 80% interest in ArcWest's Rip Cu-Mo project. Interra can earn the first tier of its interest in the project by completing staged exploration work totalling C$2.0 million and direct payment of C$100,000 and annual share payments over 4 years until end of 2027. Interra is currently funded for, and anticipates, it will meet and likely exceed its 2024 and 2025 obligations for the earn-in of C$300,000 and C$500,000 in expenditures respectively with the budget outlined in this 2 stage program. The initial program is staged into 2 work phases: 1) A geophysical program to define drill targets, commencing in late April and; 2) A diamond drilling program tentatively scheduled for Q3/Q4 of 2024.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Ramp Metals Inc.  Opens the Market

Ramp Metals Inc. Opens the Market

Jordan Black Chief Executive Officer and Director, Ramp Metals Inc. (TSXV: RAMP) ("Ramp Metals" or the "Company"), and his team joined Omar Khafagy Manager, Corporate Access, Toronto Stock Exchange (TSX), to open the market and celebrate the Company's listing to TSX Venture Exchange (TSXV).

Ramp Metals is a battery and base metal exploration company with two flagship properties located in northern Saskatchewan and one property in Nye County, Nevada .

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/ramp-metals-inc-tsxv-ramp-opens-the-market-302127855.html

SOURCE Toronto Stock Exchange

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/25/c9697.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

2023 Operational and Project Highlights:

  • The Company raised over $17 million for exploration, with cash and cash equivalents of $5,540,312 at the year end
  • Completed aggressive exploration programs with 21,126 meters in 47 holes drilled in 2023.
  • Adding results of 39,270 meters in 145 holes of new diamond drilling to the project database for the updated Mineral Resources estimation reported in Q1 2024, which includes:

    • A 172% increase of Indicated Mineral Resources to 66.1 million tonnes (Mt) containing 1,093 million pounds (Mlb) copper at 0.75%, 678Mlb nickel at 0.47%, 79Mlb cobalt at 0.05%, 2.34 million ounces (Moz) palladium at 1.10 g/t and 0.42Moz platinum at 0.19 g/t.
    • 80% of the Indicated Mineral Resources is Open Pit with 52.7Mt at 0.65% Cu, 0.43% Ni, 0.05% Co, 0.97g/t Pd and 0.17% Pt.
    • Inferred Mineral Resources of 25.9Mt containing 558Mlb copper at 0.98%, 333Mlb nickel at 0.58%, 40Mlb cobalt at 0.07%, 1.12Moz palladium at 1.43 g/t and 0.21Moz platinum at 0.25 g/t.

Canadian North Resources Inc. ("the Company", TSXV: CNRI; OTCQX: CNRSF; FSE: EO0 (E-O-zero)) is pleased to announce the operational and financial results for the year ended December 31, 2023.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Aston Bay Holdings Announces Non-Brokered Private Placement

Aston Bay Holdings Announces Non-Brokered Private Placement

(NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.)

Aston Bay Holdings Ltd. (TSX-V:BAY)(OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to announce that it will conduct a non-brokered private placement (the "Offering"), subject to acceptance by the TSX Venture Exchange (the "Exchange"), for aggregate gross proceeds of up to $5,000,000. The Offering will consist of non-flow through units (the "Units") at a price of $0.12 per Unit (the "LIFE Offering"), and flow-through shares (the "FT Shares") at a price of $0.15 per FT Share

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Grid Battery Metals

Grid Battery Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

Ă—