Grid Battery Exploration Team begins work on its Clayton Valley Lithium Project

Grid Battery Exploration Team begins work on its Clayton Valley Lithium Project

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - March 28, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV: CELL, OTCQB: EVKRF FRA: NMK2) is pleased announce that our 2024 Exploration Program has officially started on its Clayton Valley Lithium Project. The 2024 Exploration Program will begin with a Magnetotelluric (MT) geophysics survey performed by the KLM Geoscience ("KLM") as overseen by Grid's Qualified Professional, Mr. Steven McMillin P.G..

KLM Geoscience LLC ( https://www.klmgeoscience.com/ ) is an industry leading, Nevada-based geophysical exploration company. Established in 2014, KLM specializes in a wide array of geophysical methods. Using state of the art equipment, KLM's services include induced polarization (IP), natural-source magnetotellurics (MT, AMT), controlled-source audio-frequency magnetotellurics (CSAMT), passive seismic and magnetic potential field surveys. With a head office location in Nevada, this allows KLM to rapidly mobilize and begin work at a moment's notice throughout the Western United States and beyond. KLM has been a preferred vendor for Grid and its management team for many years.

Clayton Valley MT Site Design:

At the Grid Clayton Valley Lithium Project, MT Systems will be deployed using 100m inline and 100m crossline electric field dipoles, at a station spacing of 250m and line spacings of 500m. A total of 85 station sites are planned for the survey. A pair of horizontal (x,y) magnetic field sensors, oriented parallel to the electric field dipoles will be deployed at every other site and MT sites will record overnight for a minimum of 14-16 hours. The geophysical survey plan is to deploy a minimum of five (5) MT sites per day, using a six (6) person crew.

Grid's Clayton Valley Lithium Project


Click Image To View Full Size

The MT survey is a preferred method for identifying strata that may contain lithium brine (evidenced by low resistivity), structures that potentially focus brine, and basin floor geometry. The follow-on soil sampling program will identify where subsurface brine may have reached the surface. The combination of MT and geochemistry will assist the Company in determining the next steps for its 2024 exploration including the planning of a first phase drill program.

Tim Fernback, Grid President & CEO comments "KLM is a company that our geological team has successfully used several times in the past for lithium exploration work in Nevada. The MT survey has just begun, will be followed by a detailed soil sampling program by Rangefront Exploration under the guidance of our Qualified Professional. Together these results will allow us to select drill targets for subsequent exploration programs later in the year. As everyone is aware, Clayton Valley Nevada is home to North America's only lithium brine producer (Albemarle Corporation's Silver Peak Mine) and our property is immediately to the west of their lithium property and production facility."

Qualified Person

Mr. Steven McMillin, P.G. is a Qualified Person as defined by National Instrument 43-101 and has approved the technical information contained within this news release.

About Grid Battery Metals Inc.

Grid Battery Metals Inc. is a Canadian based exploration company whose primary listing is on the TSX Venture Exchange. The Company's maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market.

  www.gridbatterymetals.com .

About Texas Springs Property

The Company owns a 100% interest in the Texas Spring Property which consists of mineral lode claims located in Elko County, Nevada. The Property is in the Granite Range southeast of Jackpot, Nevada, about 73 km north-northeast of Wells, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the Humbolt Formation. A Phase 1 exploration program at the Texas Springs Property (Fall 2023) yielded r esults with average lithium grades of 2010 ppm, applying a 1,000 ppm cut-off, and up to 5,610 ppm Lithium .

The Texas Spring property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") (TSXV: NILI, OTC: NILIF) and comprised of 725 mineral claims. Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. (Press release March 29, 2023 ). More recent results have shown higher grade lithium up to 8070 ppm on this property after initial drilling (Press release September 12, 2023 ). Our exploration results are on-trend with these results.

About Clayton Valley Lithium Project

The Company owns a 100% interest in 113 lithium lode and placer claims covering over 640 hectares in Clayton Valley. Clayton Valley is a down-dropped closed basin formed by the Miocene age Great Basin extension and is still active due to movement along the Walker Lane structural zone. As a result, the basin has preserved multiple layers of lithium bearing volcanic ash, resulting from multiple eruptive events over the past 6 million years including eruptions from the 700,000-year-old Long Valley Caldera system and related events. These ash layers are thought to contribute to the lithium brines extracted by Albemarle and are also likely involved in the formation of the exposed lithium rich clay deposits on the east side of Clayton Valley.

Volt Canyon Lithium Property

The Company owns a 100% interest in 80 placer claims covering approximately 635 hectares of alluvial sediments and clays located 122 km northeast of Tonopah, Nevada.

About the British Columbia, Nickel Projects

The Mount Sidney Williams Group consists of three claim blocks with a total area of 10,569 hectares in the area surrounding Mount Sidney Williams, both adjoining and near the Decar project of FPX Nickel Corp., located 100 kilometres northwest of Fort St. James, B.C., in the Omineca mining division. Metallic mineralization includes nickel, cobalt, and chromium. At least some of the nickel mineralization occurs as awaruite. The Mitchell Range Group area claim consists of one claim block covering 8,659 hectares with demonstrated metallic mineralization including nickel, cobalt, and chromium. Nickel cobalt mineralization has not been well explored, but the presence of awaruite has been documented. The Company's B.C. Nickel properties are held within Grid's wholly-owned subsidiary, AC/DC Battery Metals Inc.

The Company has previously announced plans to spin out its wholly-owned subsidiary, AC/DC Battery Metals Inc., finance it separately, and separately list it on the TSX Venture Exchange in 2024. This transaction once complete, will provide a valuable share dividend to each Grid Shareholder of record for no additional cost.

On Behalf of the Board of Directors

"Tim Fernback"

Tim Fernback, President & CEO

Contact Information:

Email: info@gridbatterymetals.com

Phone: 604- 428-5690

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).

Copyright (c) 2024 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

CELL:CC
Grid Battery Metals

Grid Battery Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Grid Battery Metals

Grid Battery Metals


Keep reading...Show less
Grid Battery Results of Annual General and Special Meeting of Shareholders

Grid Battery Results of Annual General and Special Meeting of Shareholders

Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) is pleased to announce the results of its Annual General and Special Meeting (the "Meeting") of shareholders of the Company held on April 9, 2024. All matters set out in its management information circular dated March 7, 2024 were approved with 99% voting in favour of all resolutions, including approval of the proposed plan of arrangement (the "Arrangement") for the previously announced spin-out by the Company of 9,414,040 common shares of its wholly owned subsidiary ACDC Battery Metals Inc. ("ACDC") to the shareholders of the Company and the Company will transfer to ACDC ownership of its Nickel Properties in British Columbia. The Company will keep shareholders apprised of the status of the closing of the Arrangement and the timing of the share dividend

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Grid Battery Re-Engages TD Media d/b/a Life Water Media to Provide Media Services

Grid Battery Re-Engages TD Media d/b/a Life Water Media to Provide Media Services

(TheNewswire)

Grid Battery Metals Inc..

Coquitlam, BC TheNewswire - April 5, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL ) ( OTC:EVKRF ), ( FRA:NMK2) announces that the Company has re- engaged the services of TD Media LLC dba Life Water Media LLC ("Life Water Media") to help raise online marketing awareness and to provide a comprehensive digital media marketing campaign for the Company.  Life Water Media is based out of Sugar Land, Texas.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery to begin the 2024 Exploration Program on its Clayton Valley Lithium Project

Grid Battery to begin the 2024 Exploration Program on its Clayton Valley Lithium Project

(TheNewswire)

Grid Battery Metals Inc..

Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV: CELL, OTCQB: EVKRF FRA: NMK2) is pleased announce that it will immediately begin the 2024 Exploration Program on its Clayton Valley Lithium Project. The planned exploration program is identified in the NI 43-101 Technical Report completed by Mr. Steven McMillin P.G. filed on SEDAR+ ( www.sedarplus.ca ) and viewed on the Company's website at Clayton Valley Technical Report

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Renews Engagement with Triomphe Holdings Ltd.  To Provide Social Media Services

Grid Battery Renews Engagement with Triomphe Holdings Ltd. To Provide Social Media Services

(TheNewswire)

Grid Battery Metals Inc..

Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2) announces that it has renewed its contract with Triomphe Holdings Ltd. (dba Capital Analytica) ("Capital Analytica") to provide a multi-faceted Promotional Enhancement Service. Capital Analytica is a Nanaimo, BC based company

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada

Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada

(TheNewswire)

Grid Battery Metals Inc..

Grid Battery Metals Inc. (the "Company" or "Grid Battery") ( TSXV:CELL ) ( OTC:EVKRF ) ( FRA:NMK2 ) is pleased to announce that the NI 43-101 Technical Report for Grid's Clayton Valley Lithium Project, dated March 4, 2024, prepared by Mr. Steven McMillin P.G. of Rangefront Geological, has been filed on SEDAR+ (www.sedarplus.ca) and can be viewed on the Company's website at Clayton Valley Technical Report

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Heritage Mining Announces Grant of Options

Heritage Mining Announces Grant of Options

(TheNewswire)

Heritage Mining Ltd.

VANCOUVER, BC, April 12, 2024 TheNewswire Heritage Mining Ltd. (CSE: HML FRA:Y66) (" Heritage " or the " Company ") is pleased to announce that the board has approved the grant of incentive stock options pursuant to its stock option plan (the " Plan ") to certain directors, officers, and consultants to purchase up to an aggregate of 1,385,000 common shares in the capital of the company (the " Options ").  The Options are exercisable at a price of $0.05 per common share and will expire three years from the date of grant.   The Options are subject to the terms of the Plan, the applicable Option agreements and the requirements of the Canadian Securities Exchange.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
World Copper Closes First Tranche of Non-Brokered Private Placement

World Copper Closes First Tranche of Non-Brokered Private Placement

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper" or the "Company") reports that pursuant to their news release dated February 27, 2024, the Company has closed a first tranche of their non-brokered financing issuing an aggregate 53,015,112 units for gross proceeds of $3,711,058. Each Unit consists of one common share of the Company (a "Share") and one-half of one common share purchase warrant (a "Warrant"). Each whole Warrant entitles the holder to acquire one additional share of the Company for a period of two years from the date of issuance at a price of $0.17 per share. The expiry of the Warrants may be accelerated if the closing price of the Company's common shares on the TSX Venture Exchange ("TSXV") is equal to or greater than $0.30 for a minimum of twenty consecutive trading days and a notice of acceleration is provided in accordance with the terms of the Warrants.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
VIZSLA COPPER CLOSES NON-BROKERED PRIVATE PLACEMENT FOR GROSS PROCEEDS OF $2.5M AND PROVIDES UPDATES

VIZSLA COPPER CLOSES NON-BROKERED PRIVATE PLACEMENT FOR GROSS PROCEEDS OF $2.5M AND PROVIDES UPDATES

/NOT FOR DISSEMINATION IN OR INTO THE UNITED STATES OR FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES./

Vizsla Copper Corp. (TSXV: VCU) (OTCQB: VCUFF) ( FRANKFURT : 97E0) (" Vizsla Copper " or the " Company ") is pleased to announce that it has closed its non-brokered private placement (the " Private Placement "), previously announced on March 5, 2024 and March 18, 2024 issuing 38,460,995 units (the " Units ") at a price of $0.065 per Unit for gross proceeds of CAD$2,499,962.08 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Quetzal Copper Announces Acquisition of Cristinas Copper Project, Chihuahua, Mexico

Quetzal Copper Announces Acquisition of Cristinas Copper Project, Chihuahua, Mexico

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company"), a copper-focused exploration company, is pleased to announce that the Company entered into an agreement with certain third-party vendors (the "Polaris Vendors"), pursuant to which the Company has been granted the option (the "Polaris Option") to acquire all of the issued and outstanding shares of Polaris Resources, S.A. de C.V. ("Polaris Resources"). Polaris Resources holds a 100% interest in the Cristinas copper project located in the state of Chihuahua, Mexico (the "Cristinas Project"), subject to fulfillment of certain underlying payments to be made to the underlying property vendors (the "Property Vendors").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Canada Nickel Commences Front End Engineering Design at Crawford Nickel Sulphide Project

Canada Nickel Commences Front End Engineering Design at Crawford Nickel Sulphide Project

Highlights

  • Crawford on track for mid-2025 construction decision and first production by year-end 2027
  • Front End Engineering Design led by Ausenco

Canada Nickel Company Inc. ("Canada Nickel" or the "Company") (TSXV: CNC) (OTCQX: CNIKF) announced today that it has commenced Front End Engineering Design at the Company's Crawford Nickel Sulphide project led by its long-term engineering partner Ausenco Engineering Canada ULC ("Ausenco") and supported by a number of engineering firms from the project's feasibility study.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
1844 Receives Final Payment for Sale of Lac Arsenault Project

1844 Receives Final Payment for Sale of Lac Arsenault Project

1844 Resources Inc. (TSXV: EFF) (the "Company" or "1844") is pleased to provide an update with respect to its previously announced sale (the "Transaction") of the Lac Arsenault project to Canadian Gold Resources Ltd. (the "Purchaser"). Pursuant to the terms of the Transaction, the Purchaser paid 1844 Six Hundred Thousand Canadian Dollars (CAN$600,000.00) as follows:

  • One hundred thousand Canadian dollars (CAN$100,000) in cash; and

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
{{ sections }}
Grid Battery Metals

Grid Battery Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×