
August 24, 2026
Alligator Energy Ltd (ASX: AGE) (Alligator or the Company) is pleased to report initial drilling results from its 2026 exploration program at the Big Lake Uranium Project in South Australia's Lake Eyre Basin, with drilling confirming further uranium mineralisation at Site 10.
Highlights
- Thirty-three aircore holes completed for 4,112 metres, with further uraniummineralisation intersected at Site 10.
- Follow-up drilling at Site 10 has intersected uranium mineralisation associated with theinterpreted redox boundary between oxidised and reduced sands, providing furthergeological evidence supporting Alligator's roll-front uranium exploration model.
- Key intersections, reported above a 100ppm eU3Og cut-off, include:
- AC26-006:.
- 1.0 metres at 0.018% (180ppm) eU3O8 from 98.1m (GT 180m.ppm)
- 0.9 metres at 0.019% (190ppm) eU3Os from 100.4m (GT 170m.ppm)
- AC26-009
- 1.9 metres at 0.032% (320ppm) eU3O8 from 100.9m (GT 610m.ppm).
- AC26-006:.
- Regional drilling 6km south of Site 10 has intersected similar oxidised and reduced sands at comparable depths, while the prospective palaeo channel remains open to the southeast and is interpreted from seismic data to extend a further ~12km
Alligator CEO and Managing Director Dr Andrea Marsland-Smith said: We are pleased with the early results from this year's drilling at Big Lake. The work at Site 10 has confirmed further uranium mineralisation and is giving us a much clearer picture of how the roll-front system is developing and the potential scale. What is particularly encouraging is that drilling 6 kilometres south of Site 10 has intersected similar oxidised and reduced sands at comparable depths, suggesting the favourable geological setting extends well beyond the discovery area.
Drilling Program Detail & Objectives
Thirty-three aircore holes have been completed as part of Alligator's ongoing 2026 drilling campaign. The program has been exploring within sands of a large palaeo channel within the Namba Formation at depths between 70-130m from surface (Figure 1). Drillholes have been sited both north and south of Site 10 (Figure 2); the site of the initial uranium discovery in 2024 with the objective of providing additional geological context to:
- Strengthen the interpretation of the 2024 results and provide a broader perspective of theirsignificance;
- Locate the precise level(s) of the uranium mineralisation within the host sands using downhole gamma geophysical logging;
- Regionally map the alteration (redox) state of the sands around Site 10 to provide guidance to the siting of successive drillholes to precisely target roll-front uranium mineralisation, and
- Determine if the system has regional scale.

Click here for the full ASX Release
This article includes content from Alligator Energy, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
AGE:AU
Alert Options
No alert set
INN Article Notification
Alert Option
You will be notified when this event occurs. No additional settings needed.
The Conversation (0)
31 August
India Nears Long-term Uranium Deal with Uzbekistan
India and Uzbekistan upgraded bilateral relations to a comprehensive strategic partnership during Prime Minister Narendra Modi’s state visit to Tashkent, setting a US$5 billion trade target for 2030 and advancing negotiations for a new long-term uranium supply agreement.The pending deal would... Keep Reading...
27 August
US Doubles Down on Minerals, Manufacturing and Nuclear Power for Defense
The US Small Business Administration (SBA) and the US Department of War this week announced the creation of the Smaller War Plants Commission (SWPC), a new body meant to steer federal money, contracts and regulatory relief toward the small manufacturers that supply the American military.The... Keep Reading...
19 August
Large-Scale Aquifer Testing Commences at Lo Herma as ProjectAdvances Toward ISR Development
Large scale hydrogeological testing is now underway at Mine Unit 1 following AMU's recent 9.96Mlb resource update, supporting permitting activities and the Company's targeted Q4 2026 Scoping Study.American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to... Keep Reading...
Latest News
Interactive Chart
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00





