Centaurus Metals

December 2022 Quarterly Activities Report and Cash Flow Report

Jaguar Mineral Resource increased to 108.0Mt @ 0.87% Ni for 938,500 tonnes of contained nickel metal; Definitive Feasibility Study (DFS) continues and remains on track for delivery by mid-2023

Centaurus Metals (ASX Code: CTM, OTCQX: CTTZF) is pleased to present its Quarterly Report and Cash Flow Report.


JAGUAR NICKEL SULPHIDE PROJECT

  • Updated JORC 2012 Mineral Resource Estimate (MRE) confirms Jaguar as one of the world’s premier near- surface nickel sulphide development projects, with the Jaguar Global MRE growing to now contain an estimated:
    • GLOBAL: 108.0Mt @ 0.87% Ni for 938,500 tonnes of contained nickel.
  • Measured and Indicated component of the Global MRE increased by over 100% to:
    • MEASURED & INDICATED: 85.8Mt @ 0.85% Ni for 730,300 tonnes of contained nickel.
  • High-grade component of the MRE increased to 28.6Mt @ 1.51% Ni for 431,800 tonnes of contained nickel, with 30% of this resource located within 100m of surface.
  • The mineralisation remains open both at depth and locally along plunge and strike, with significant potential to continue to grow the MRE.
  • Key work programs for the Jaguar Definitive Feasibility Study (DFS) were well advanced during the Quarter, including:
    • Pricing proposals were received from mining contractors to support the development of the DFS opex, open pit optimisations and mine planning work. Commercial and technical evaluation of the proposals is underway.
    • The process design for the concentrator circuit of the processing facility was finalised and major equipment pricing was received from suppliers. Commercial & technical evaluation is well advanced.
    • Process design and the layout of the refinery circuit and non-process plant infrastructure (NPI) commenced.
    • An additional ~2.5 tonnes of diamond core was drilled and transported from the Jaguar project site to Perth to generate an additional 300kg of concentrate required for the pilot testwork program.
    • The pilot plant setup at ALS Laboratories in Perth was completed just prior to the end of the quarter, ready for the 2-phase pilot testwork program to commence in January 2023.
    • Initial design and licencing work commenced to connect to the 230kV national power grid for the Project’s integrated concentrator and refining circuit power requirements.
    • Geotechnical drilling for the final design of the roads and bridges from Tucumá and Ourilândia do Norte to site was completed.

CORPORATE

    • Cash at 31 December 2022 of $34 million.
JAGUAR NICKEL PROJECT

The Jaguar Nickel Sulphide Project, located in the world-class Carajás Mineral Province of northern Brazil (Figure 1), was acquired from global mining giant, Vale S.A. (“Vale”) in April 2020.


Click here for the full ASX Release

This article includes content from Centurus Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CTM:AU
The Conversation (0)
Centaurus Metals

Centaurus Metals

The World’s Next Green Nickel Project

The World’s Next Green Nickel Project Keep Reading...
Fathom Nickel (CSE:FNI)

Fathom Announces Commencement of Winter Drill Program at the Gochager Lake Project

Fathom Nickel Inc. (CSE: FNI,OTC:FNICF) (FSE: 6Q5) (OTCQB: FNICF) ("Fathom", or the "Company") is pleased to announce that the winter drill program at the Gochager Lake project commenced late in the day of March 6, 2026. Drilling is expected to continue into the first or second week of April,... Keep Reading...
Aerial view of excavators and trucks at a construction site.

Oregon: America’s Premier Domestic Nickel Opportunity

The global race for critical minerals has begun. As the US stares down a future of massive industrial shifts, the strategy is clear: secure the supply chain or get left behind. Demand for nickel is hitting overdrive, fueled by its role in electric vehicle (EV) batteries, high-strength stainless... Keep Reading...
Fathon Nickel (CSE:FNI)

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to begin... Keep Reading...
Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI,OTC:FNICF) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to... Keep Reading...
Ni-Co Energy

Ni-Co Energy Inc. Files Preliminary Prospectus for Proposed Initial Public Offering

Ni-Co Energy Inc. (“Ni-Co Energy” or the “Company”) is pleased to announce that it has filed a preliminary prospectus (the “Preliminary Prospectus”) with the securities regulatory authorities in the provinces of Québec, Ontario, Alberta, and British Columbia in connection with its proposed... Keep Reading...
Bahia Metals (CSE:BMT)

Bahia Metals Corp. Completes Initial Public Offering of $5,750,000, with Full Exercise of Over-Allotment Option

Bahia Metals Corp. (CSE: BMT) ("Bahia" or the "Company") is pleased to announce that it has successfully completed its initial public offering (the "IPO") of 11,500,000 units of the Company (the "Units") at a price of $0.50 per Unit, inclusive of the full exercise of the 15% over-allotment... Keep Reading...

Interactive Chart

Latest Press Releases

Related News