Centaurus Metals

December 2022 Quarterly Activities Report and Cash Flow Report

Jaguar Mineral Resource increased to 108.0Mt @ 0.87% Ni for 938,500 tonnes of contained nickel metal; Definitive Feasibility Study (DFS) continues and remains on track for delivery by mid-2023

Centaurus Metals (ASX Code: CTM, OTCQX: CTTZF) is pleased to present its Quarterly Report and Cash Flow Report.


JAGUAR NICKEL SULPHIDE PROJECT

  • Updated JORC 2012 Mineral Resource Estimate (MRE) confirms Jaguar as one of the world’s premier near- surface nickel sulphide development projects, with the Jaguar Global MRE growing to now contain an estimated:
    • GLOBAL: 108.0Mt @ 0.87% Ni for 938,500 tonnes of contained nickel.
  • Measured and Indicated component of the Global MRE increased by over 100% to:
    • MEASURED & INDICATED: 85.8Mt @ 0.85% Ni for 730,300 tonnes of contained nickel.
  • High-grade component of the MRE increased to 28.6Mt @ 1.51% Ni for 431,800 tonnes of contained nickel, with 30% of this resource located within 100m of surface.
  • The mineralisation remains open both at depth and locally along plunge and strike, with significant potential to continue to grow the MRE.
  • Key work programs for the Jaguar Definitive Feasibility Study (DFS) were well advanced during the Quarter, including:
    • Pricing proposals were received from mining contractors to support the development of the DFS opex, open pit optimisations and mine planning work. Commercial and technical evaluation of the proposals is underway.
    • The process design for the concentrator circuit of the processing facility was finalised and major equipment pricing was received from suppliers. Commercial & technical evaluation is well advanced.
    • Process design and the layout of the refinery circuit and non-process plant infrastructure (NPI) commenced.
    • An additional ~2.5 tonnes of diamond core was drilled and transported from the Jaguar project site to Perth to generate an additional 300kg of concentrate required for the pilot testwork program.
    • The pilot plant setup at ALS Laboratories in Perth was completed just prior to the end of the quarter, ready for the 2-phase pilot testwork program to commence in January 2023.
    • Initial design and licencing work commenced to connect to the 230kV national power grid for the Project’s integrated concentrator and refining circuit power requirements.
    • Geotechnical drilling for the final design of the roads and bridges from Tucumá and Ourilândia do Norte to site was completed.

CORPORATE

    • Cash at 31 December 2022 of $34 million.
JAGUAR NICKEL PROJECT

The Jaguar Nickel Sulphide Project, located in the world-class Carajás Mineral Province of northern Brazil (Figure 1), was acquired from global mining giant, Vale S.A. (“Vale”) in April 2020.


Click here for the full ASX Release

This article includes content from Centurus Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CTM:AU
The Conversation (0)
FPX Nickel (TSXV:FPX)

FPX Nickel


Keep reading...Show less
Nickel bars.

Nickel Price Update: Q3 2024 in Review

Nickel saw solid price momentum in the first half of the year, benefiting from investor sentiment and speculation across commodity markets that saw surge in prices for both precious and base metals.

However, price highs were short-lived as nickel supply and demand fundamentals provided pressures that saw steep declines.

Among the influences has been a supply of laterite nickel flooding the market out of Indonesia, which is a contributing factor to mine curtailments in New Caledonia, Australia, and Europe. Meanwhile, high demand for battery production in China has yet to reach levels to make up for the oversupply in the market.

Keep reading...Show less
Blackstone Minerals

Blackstone Completes Institutional Component of Entitlement Offer

Blackstone Minerals Limited (“Blackstone” or the “Company”) is pleased to announce that it has completed the institutional component (“Institutional Entitlement Offer” or “Institutional Offer”) of its partially underwritten accelerated non-renounceable pro rata entitlement offer as announced on 4 November 2024 (“Entitlement Offer” or “Offer”).

Keep reading...Show less
Blackstone Minerals

Launch of $4M Accelerated Partially Underwritten Entitlement Offer

Blackstone Minerals Limited (“Blackstone” or the “Company”) is pleased to announce that it is undertaking a partially underwritten accelerated non-renounceable pro rata entitlement offer of new fully paid ordinary shares in the Company (“Shares”) on the basis of one (1) new Share (“New Shares”) for every four (4) existing Shares held, to raise up to approximately A$4 million (before costs) (“Entitlement Offer” or “Offer”).

Keep reading...Show less
Ramp Metals (TSXV:RAMP)

Ramp Metals


Keep reading...Show less
Blackstone Minerals

Blackstone Minerals Limited (ASX: BSX) – Trading Halt (2+2)

Description

The securities of Blackstone Minerals Limited (‘BSX’) will be placed in trading halt at the request of BSX, pending it releasing an announcement regarding the outcome of the institutional component of the accelerated entitlement offer. Unless ASX decides otherwise, the securities will remain in trading halt until the commencement of normal trading on Wednesday, 6 November 2024.

Keep reading...Show less

Latest Press Releases

Related News

×