Cartier Awards All Contracts of Largest-Ever Drill Program on Cadillac

Cartier Awards All Contracts of Largest-Ever Drill Program on Cadillac

Cartier Resources Inc. (TSXV: ECR; FSE: 6CA) ("Cartier″ or the "Company″) is pleased to announce it has awarded all contracts for its fully funded, 100,000-metre diamond drilling program at its 100%-owned Cadillac Project, located in the heart of the Val-d'Or mining camp, Quebec. This ambitious 18-month campaign is the largest ever undertaken on the project and marks a major step forward in Cartier's strategy to unlock the district-scale high-grade gold potential along the 15 km Cadillac Fault corridor.

The 100,000-metre diamond drilling program will include approximately 600 drill holes and be supported by two drill rigs. Targeting will focus on both expanding known gold zones and testing new high-priority grassroots targets identified through ongoing geological modelling and past exploration success. Permitting process is now underway and planned launch of program is anticipated for late August, 2025.

"This is a transformational phase for Cartier and the Cadillac Project,″ commented Philippe Cloutier, President and CEO. "With over $11 million in cash, no debt and full ownership of the entire 15 km gold-bearing strike, we are in a strong position to aggressively explore and grow our high-grade gold inventory.″

The Company recently optioned three gold projects: Benoist, Fenton, and Wilson to Exploits Discovery Corp., enabling Cartier to concentrate its resources and technical team on the Cadillac Project's development.

Qualified Person

The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Ronan Déroff, P.Geo., M.Sc., Vice President Exploration, who is a "Qualified Person″ as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101″).

About Cartier Resources Inc.

Cartier Resources Inc. was founded in 2006 and is an advanced gold project exploration company based in Val-d'Or (Quebec, Canada). In 2024, Quebec ranked 5th among the best mining jurisdictions in the world (Fraser Institute). Cartier owns 100% of its flagship Cadillac asset and controls a significant land package of 25,000 ha. The Cadillac project is located approximately 40 km east of Val-d'Or and close to existing gold mills with available capacity.

The results of the recent Preliminary Economic Assessment 1 (PEA) demonstrate the economic viability of the project with an average annual gold production of 116,900 oz over a 9.7-year mine life. The current Mineral Resource Estimate 1 (MRE) totaling 7,128,000 tonnes at an average grade of 3.14 g/t Au for a total of 720,000 ounces of gold in the Indicated category and 18,475,000 tonnes at an average grade of 2.75 g/t Au for a total of 1,633,000 ounces of gold in the Inferred category .

1. NI 43-101 Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions, May, 29, 2023 .

For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com

Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

ECR:CC
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Cartier Resources

Cartier Resources

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt Keep Reading...
Silver Hammer Prepares for Drill Program at Its 100% Owned California Patented Claim at The Eliza Project in Nevada

Silver Hammer Prepares for Drill Program at Its 100% Owned California Patented Claim at The Eliza Project in Nevada

Silver Hammer Mining Corp. (CSE: HAMR,OTC:HAMRF) (the "Company" or "Silver Hammer") is pleased to announce that the Company is finalizing plans for its Phase 1 drill program on its 100% owned California Patented Claim (the "California Patent"), within the Eliza Silver Project ("Eliza") in White... Keep Reading...
1911 Gold Confirms Resource Continuity in Underground Infill and Delineation Drilling at True North

1911 Gold Confirms Resource Continuity in Underground Infill and Delineation Drilling at True North

1911 Gold Corporation ("1911 Gold" or the "Company") (TSXV: AUMB,OTC:AUMBF) (OTCQX: AUMBF) (FRA: 2KY) is pleased to provide assay results from the underground drill program at the Company's wholly-owned operational and fully permitted True North Gold Project ("True North"), located in southeast... Keep Reading...
Multiple Pinjin drill programs locked in to commence April

Multiple Pinjin drill programs locked in to commence April

Kalgoorlie Gold Mining (KAL:AU) has announced Multiple Pinjin drill programs locked in to commence AprilDownload the PDF here. Keep Reading...
Earthwise Engages Global One Media

Earthwise Engages Global One Media

VANCOUVER, BC / ACCESS Newswire / March 10, 2026 / Earthwise Minerals Corp. (CSE:WISE,OTC:HWKRF)(FSE:966) ("Earthwise" or the "Company") announces that it has entered into a Media Agency Agreement (the "Agreement") with Global One Media Group Pte. Ltd. ("Global One Media"), under which Global... Keep Reading...
Summit Royalties Announces Grant of Restricted Share Units

Summit Royalties Announces Grant of Restricted Share Units

Summit Royalties Ltd. (TSXV: SUM,OTC:SUMMF, OTCQB: SUMMF) (the "Corporation" or "Summit") announces that it has granted an aggregate of 350,000 restricted share units of the Corporation ("RSUs") to certain senior officers of the Corporation pursuant to its omnibus incentive plan (the "Plan"). Of... Keep Reading...
Freegold Drills 2.94 g/t Au over 58.4m at Golden Summit

Freegold Drills 2.94 g/t Au over 58.4m at Golden Summit

Highlights: Dolphin Area continued infill drilling demonstrates potential for higher grade within the main resource area and at depth with notable intercepts including: 2.41 g/t Au over 18.9m 1.46 g/t Au over 88.4m 3.09 g/t Au over 40.8m 2.94 g/t Au over 58.4m The width refers to drill hole... Keep Reading...
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News