Bathurst Metals Announces Merry May Claim Option - completion of the acquisition

Bathurst Metals Announces Merry May Claim Option - completion of the acquisition

(TheNewswire)

Vancouver, B.C. September 18, 2025 TheNewswire - Bathurst Metals Corp. ("Bathurst" or the "Company") is pleased to announce the completion of the acquisition of an undivided 100% interest in the "Merry May Project", as announced on September 5, 2025. The project is located on the west side of Truax Creek, south of Carpenter Lake, near Gold Bridge, B.C. It lies along the highly prospective Minto–Olympic–Mary Mac structural trend, which is well known for its gold and antimony mineralization.


Click Image To View Full Size

The Merry May project consists of one mineral claim comprising 81.6 hectares near Gold Bridge, B.C.

Situated 500 metres southwest and directly on trend is the Mary Mac deposit. Approximately 3.2 kilometres northwest, Endurance Gold Corp. has recently outlined multiple gold-in-soil anomalies as part of its Reliance Gold Project. Further along the trend, 5.5 kilometres northwest, lies the historic Minto Mine, which operated from 1934 to 1940, producing 80,650 tonnes of ore averaging 6.8 g/t gold and 19.9 g/t silver. In total, Minto yielded 546 kg gold, 1,573 kg silver, with over 2,130 metres of underground workings developed, establishing it as a significant high-grade polymetallic producer in the Bridge River district. The Merry May Project is also directly across Carpenter Lake from the Company's Peerless property, providing the Company with a strong presence in this highly prospective region.

There is no assurance the Company's results of exploration of the Merry May Project will be similar to or mirror those of adjacent or proximal properties.

The Merry May Project was introduced to the Company by an arm's length vendor who had optioned the property four days before the Company agreed to acquire it for payment of $1,000, a minimum work commitment of $50,000 over 24 months and a 1% NSR royalty. The 1% NSR may be repurchased at any time after commencement of commercial production for the sum of US $1,000,000.

The Company assumed all these obligations and agreed to the issuance of 2,200,000 shares with a discounted market value of approx. $148,500 as consideration for the assignment of the option. The shares will be released to the vendor over a period of one year, with 20% released on closing and an additional 20% released at the end of each calendar quarter following the closing.

All common shares issued will be subject to a four (4) month hold period from the date of TSXV acceptance. No finders fee was paid in connection with the transaction.

The Company considers the share consideration to be fair and reasonable due to its location and proximity to the Company's Peerless property in the highly prospective Bridge River District.

Qualified Person

Lorne Warner, P Geo, is a qualified person as defined by National Instrument 43-101 and has reviewed

and approved the scientific and technical disclosure in this news release. Mr. Warner is not independent of the Company.

ON BEHALF OF THE BOARD OF DIRECTORS

"Harold Forzley"

CEO

Bathurst Metals Corp.

For more information contact Harold Forzley

info@bathurstmetalscorp.com

604-783-4273

Neither TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

Certain of the statements made and information contained herein may contain forward- looking information within the meaning of applicable Canadian securities laws. Forward-looking information includes, but is not limited to, information concerning the Company's intentions with respect to the development of its mineral properties. Forward-looking information is based on the views, opinions, intentions and estimates of management at the date the information is made, and is based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated or projected in the forward-looking information (including the actions of other parties who have agreed to do certain things and the approval of certain regulatory bodies). Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws, or to comment on analyses, expectations or statements made by third parties in respect of the Company, its financial or operating results or its securities. The reader is cautioned not to place undue reliance on forward-looking information.

.

Copyright (c) 2025 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

BMV:CA
The Conversation (0)
Bathurst Metals

Bathurst Metals

Exploring Undervalued Assets in Nunavut

Exploring Undervalued Assets in Nunavut Keep Reading...
Stack of gold bars with gold up arrow.

Marmota Unveils High-Grade Gold Finds at Greenewood Discovery

Marmota has revealed the first detailed assays from its maiden program at the Greenewood gold discovery in the Gawler Craton of South Australia.In a Thursday (December 11) release, the company highlighted results including 95 grams per tonne (g/t) gold from 22 metres (as part of a spectacular... Keep Reading...
Brixton Metals Closes Tranche 2 Of Its Private Placement

Brixton Metals Closes Tranche 2 Of Its Private Placement

Not for distribution to United States Newswire Services or for dissemination in the United States Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the " Company " or " Brixton ") is pleased to announce that it completed on December 11, 2025, the second tranche of a non-brokered private... Keep Reading...
New Found Gold (TSXV:NFG)

New Found Gold Announces Infill Drilling at the Monte Carlo Zone, Queensway Gold Project

New Found Gold Corp. (TSXV: NFG) (NYSE American: NFGC) ("New Found Gold" or the "Company") is pleased to announce infill drill results from the Monte Carlo zone ("Monte Carlo") in the AFZ Core ("AFZC"), completed as part of the Company's ongoing 2025 drill program on its 100%-owned Queensway... Keep Reading...
American Eagle Extends South Zone Discovery by over 300 Metres; Returns 91 m of 1.53% CuEq Within 167 m of 1.06% CuEq

American Eagle Extends South Zone Discovery by over 300 Metres; Returns 91 m of 1.53% CuEq Within 167 m of 1.06% CuEq

Highlights: South Zone Expansion: NAK25-57 intersected 167 m of 1.06% Copper Equivalent (CuEq), including 91 m of 1.53% CuEq, within 909 m averaging 0.41% CuEq from surface; this extends the NAK25-46 discovery more than 100 m west. NAK25-52 extends the high-grade NAK25-48 discovery by over 200... Keep Reading...
Menzies Mineral Resource increases 22% to 0.7Moz @ 1.5g/t

Menzies Mineral Resource increases 22% to 0.7Moz @ 1.5g/t

Brightstar Resources (BTR:AU) has announced Menzies Mineral Resource increases 22% to 0.7Moz @ 1.5g/tDownload the PDF here. Keep Reading...
Aurum Returns High Grade Gold Intercepts at Tchaga, Napié Gold Project, Côte d’Ivoire

Aurum Returns High Grade Gold Intercepts at Tchaga, Napié Gold Project, Côte d’Ivoire

Aurum Resources (ASX: AUE, “Aurum” or “the Company”) is pleased to announce encouraging, broad gold intercepts from its ongoing 30,000m drilling program at the 0.87Moz Napié Gold Project1 in Côte d'Ivoire. The drill program is designed to grow Mineral Resources at Napié and has successfully... Keep Reading...

Latest Press Releases

Related News