GoldON Commences Phase II Drilling at West Madsen Gold Project in Red Lake, Ontario and Arranges Exploration Financing

Property adjoins Canada's next gold mine - the Pure Gold Red Lake Mine project where the first gold pour is scheduled for late 2020

GoldON Resources Ltd. (TSXV: GLD) ("GoldON" or the "Company") is pleased to report that Phase II diamond drilling is underway at its West Madsen Gold Project (the "Project") in the heart of the Red Lake Gold Camp.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7436/68720_111e95737444abab_001.jpg

Figure 1: Phase II Drill Plan for West Madsen Project

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/7436/68720_111e95737444abab_001full.jpg

The West Madsen Project covers over 4,700 hectares and is comprised of the West Madsen (Block A and B) claims, where GoldON has the right to earn a 100% interest through an option agreement with Great Bear Resources (see news release of May 28, 2019); and the Flat Lake and Madsen-Medicine Stone claim groups that adjoin Block A, where GoldON can acquire a 100% interest through an option agreement with Bounty Gold (see news release of July 29, 2020, and the Red Lake regional map Figure 2).

The focus of the Phase II drilling program will be on the expanded West Madsen - Block A (see Figure 1 above) and the area of the black ellipse that is contiguous with the Pure Gold Red Lake Mine property where the first gold pour is scheduled for late 2020 (Pure Gold's news release of October 27, 2020). Pure Gold's reserves and resources include the Madsen deposit (FS status) and the Fork, Russet South, and Wedge deposits (PEA status) that are hosted in a seven-kilometre-long gold system that follows the major crustal break or contact between the Balmer and Confederation assemblages. This same Balmer-Confederation contact has been exposed in outcrop 1.6 kilometres (km) west of the Pure Gold property boundary and is interpreted to continue for ~8 km across GoldON's property.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7436/68720_111e95737444abab_002.jpg

Figure 3: Looking NE from West Madsen - Block A toward the Pure Gold Red Lake Mine Project

To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/7436/68720_111e95737444abab_002full.jpg

The Phase II program is budgeted for up to 7,000 metres of diamond drilling to aggressively test the strike-extension of both the known gold mineralization to the east and to follow-up on the gold mineralization discovered during GoldON's Phase I drilling that returned 14.4 g/t gold over 0.5 metres (see news release of July 22, 2020). The black ellipse in Figure 1 depicts the area of the interpreted east-west trending Balmer-Confederation contact and the systematically planned drill holes that will test the extension of the stratigraphy within the structurally controlled corridor.

Exploration Financing

GoldON also announces that it has arranged a non-brokered private placement of approximately 1,333,334 flow-through shares at a price of $0.75 per share with qualified investors to raise approximately $1,000,000.

Completion of this financing is subject to TSX Venture Exchange acceptance. The Company has agreed to pay a finder's fee of up to 6% cash and 6% finder's warrants on subscription proceeds. Each finder's warrant will entitle the holder to purchase one non-flow-through share of the Company at a price of $0.75 for a period of two years from the closing date. All securities issued pursuant to this offering will have a hold period expiring four months after the closing date.

The Company will use the proceeds of the financing to fund the Phase II drilling program underway at its West Madsen Project.

Ian Russell, P. Geo., an independent qualified person as defined in National Instrument 43-101, has reviewed and approved the technical contents of this news release on behalf of the Company.

About GoldON Resources Ltd.

GoldON is an exploration company focused on discovery-stage properties located in the prolific gold mining belts of northwestern Ontario, Canada. Our current project portfolio includes four properties in the Red Lake Mining Division (West Madsen, Pipestone Bay, McDonough and Bruce Lake) and a fifth property in the Patricia Mining Division (Slate Falls).

For additional information: please visit our website at goldonresources.com, you can download our latest investor presentation by clicking here and you can follow us on Twitter at https://twitter.com/GoldONResources.

ON BEHALF OF THE BOARD

Signed "Michael Romanik"
Michael Romanik, President
Direct line: (204) 724-0613
Email: info@goldonresources.com

Forward-Looking Statements:

This news release may contain "forward-looking statements" that involve known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Any forward-looking statement speaks only as of the date of this news release and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/68720

News Provided by Newsfile via QuoteMedia

The Conversation (0)
GoldON Resources

GoldON Resources

GoldON Resources Ltd. is a junior exploration company focused on discovery-stage properties located in the prolific gold mining belts of northwestern Ontario, Canada. Our current project portfolio includes four properties in the Red Lake Mining Division (West Madsen, Pipestone Bay, McDonough and Bruce Lake) and a fifth property in the Patricia Mining Division (Slate Falls).

GoldON Resources Ltd. is a junior exploration company focused on discovery-stage properties located in the prolific gold mining belts of northwestern Ontario, Canada. Our current project portfolio includes four properties in the Red Lake Mining Division (West Madsen, Pipestone Bay, McDonough and Bruce Lake) and a fifth property in the Patricia Mining Division (Slate Falls). Keep Reading...
Digital bull on a rising stock chart, symbolizing a bullish market trend.

Fabi Lara: What to Do When Commodities Prices Go Parabolic

Speaking against a backdrop of record-high gold and silver prices, Fabi Lara, creator of the Next Big Rush, delivered a timely reality check at this year’s Vancouver Resource Investment Conference. Addressing a packed room that included a noticeable influx of first-time attendees, she urged... Keep Reading...
Joe Cavatoni, gold bars.

Joe Cavatoni: Gold Price Drop — Why it Happened, What's Next

Joe Cavatoni, senior market strategist, Americas, at the World Gold Council, breaks down gold's record-setting run past US$5,500 per ounce as well as its correction. "At the end of this, you're looking at a lot of people who were pushing the price higher — speculative in nature — pulling back... Keep Reading...
Stock ticker display showing "mergers and acquisitions" text in pixelated font.

Gold-Copper Consolidation Continues as Eldorado Moves to Acquire Foran

Eldorado Gold (TSX:ELD,NYSE:EGO) and Foran Mining (TSX:FOM,OTCQX:FMCXF) have agreed to combine in a share-based transaction that will create a larger, diversified gold and copper producer with two major development projects that are set to enter production in 2026.Following completion under a... Keep Reading...
Stellar AfricaGold (TSXV:SPX)

Stellar AfricaGold Intersects Multiple Gold-Bearing Zones and Confirms Structural Controls at Tichka Est, Morocco - Drilling Resumed on January 30, 2026

(TheNewswire) Vancouver, BC TheNewswire - February 3rd, 2026 Stellar AfricaGold Inc. ("Stellar" or the "Company") (TSX-V: SPX | FSE: 6YP | TGAT: 6YP) is pleased to report additional assay results and an updated interpretation from its ongoing diamond drilling program at the Tichka Est Gold... Keep Reading...
Man in black shoes standing on a road with a white U-turn arrow.

Gold and Silver Prices Take a U-Turn on Trump's Fed Chair Nomination

Gold and silver prices have experienced one of their most savage corrections in decades. After hitting a record high of close to US$5,600 per ounce in the last week of January, the price of gold took a dramatic U-turn on January 30, dropping as low as US$4,400 in early morning trading on Monday... Keep Reading...
Bold Ventures President and COO Bruce MacLachlan

Bold Ventures Kicks Off 2026 with Diamond Drilling Program at Burchell Base and Precious Metals Project

Bold Ventures (TSXV:BOL) has launched a diamond drilling program at its Burchell base and precious metals property in Ontario, President and COO Bruce MacLachlan told the Investing News Network.“We just started drilling a couple of weeks ago, and we’ll be drilling for a while,” MacLachlan said,... Keep Reading...

Interactive Chart

Latest Press Releases

Related News