Critical Resources

40.9m of Spodumene-Bearing Pegmatite Intersected in New Step out Hole at Mavis Lake

Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased to announce further results from its latest drilling campaign at the Company’s 100 per cent-owned Mavis Lake Lithium Project (“the Project”) in Ontario, Canada.


Highlights

Multiple pegmatite dykes totalling 40.9m intersected within step out hole MF22-116, including1,2,3

  • 24.1m spodumene mineralisation from 53 to 77.1m downhole
  • 8.15m spodumene mineralisation from 89 to 97.15m downhole
  • 8.65m spodumene mineralisation from 112.75 to 121.4m down hole

MF22-116 is located 80m east along trend from the nearest previous drilling, in an area not previously tested, demonstrating continuity and scale potential

Phase 2 drill campaign underway, focused on stepout and infill program to test the potential strike length of ~3km between Pegmatite 6 and Pegmatite 18

A total of 51 of 57 drill holes have intersected spodumene-bearing pegmatite to date, including most recent holes from MF22-109 to MF22-116

Assay work is ongoing and will be release as received

The Company continues its pursuit of a maiden JORC-compliant resource

The MF22-116 step out hole intersected multiple visual pegmatite dykes, with cumulative intersections totalling up to 40.9 metres, with local visual estimates of up to 75 per cent spodumene mineralisation, in metre-scale intervals (Table 1)1,2,3.

The significant visual intersections of thick pegmatites from MF22-116 are likely related to zones defined by the 2018 drilling campaign, with the step out hole located approximately 80m east from the nearest significant zones drilled in the 2018 program, an area that has not been previously tested.

The 2018 drilling program was unable to demonstrate the continuity of significant intercepts, however, MF22-116 has proven that these zones continue along strike to the east.

Click here for the full ASX Release

This article includes content from Critical Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×