Global Oil and Gas Logo

Valaris MS-1 Preparing For Departure To Sasanof-1 Location

Global Oil & Gas Limited is pleased to announce that Western Gas (“WGC”) has provided an operational update in preparation for rig mobilisation to location on 16 May 2022.

Highlights

  • Valaris MS-1 rig is anchored in the Dampier outer harbour and is on schedule to commence tow to the Sasanof-1 location on 16 May 2022
  • Western Gas’ drilling operations team have been deployed to the field and are now on board the MS-1 rig undertaking pre-mobilisation checks
  • Drilling support vessels commenced logistical operations as scheduled on 9 May 2022, with the transport and loading of drilling equipment and bulk materials to the MS-1 rig
  • More than 800m of 18-3/4” marine riser for deploying the Blow Out Preventer (BOP) is being transported to the rig in preparation of deployment at the Sasanof-1 location (water depth of 1070m)
  • Drilling operations are expected to commence as planned on 24 May 2022

The MS-1 is expected to take approximately four days to reach the Sasanof Prospect, which is approximately 200 km northwest of Onslow, Western Australia, following which the rig and support vessels will prepare for drilling the Sasanof-1 exploration well. The well will be drilled vertically to a total depth of 2500 m in 1070 m of water.

Commencement of the drilling operations (jetting 36” conductor) is expected to commence on 24 May 2022, once the rig is on location and anchors have been set.

ABOUT THE SASANOF PROSPECT

The Sasanof Prospect covers an area of up to 400 km2 and is on trend and updip of Western Gas’ liquids rich, low C02 Mentorc Field.

ERCE estimates the Sasanof Prospect to contain a 2U Prospective Resource of 7.2 Tcf gas and 176 Million bbls condensate (P501), with a high case 3U Prospective Resource estimate of 17.8 Tcf gas and 449 Million bbls condensate (P101).

Sasanof is a large, seismic amplitude supported, structural-stratigraphic trap in the high-quality reservoir sands at the top of the Cretaceous top Lower Barrow Group formation on the Barrow Delta within the Exmouth Plateau.

Sasanof-1 will be Western Gas’ first well drilled from its extensive exploration portfolio surrounding the existing Equus Gas Project that contains a discovered resource of 2 Tcf and 42 MMbbl (2C Gaffney Cline2). The Equus Gas Project has a historic exploration drilling success rate of 88%, with 15 discoveries from 17 wells.


Authorised by the Board of Global Oil & Gas Limited.

For further information please contact:

Patric Glovac

Director

info@globaloilandgas.com.au


Click here for the full ASX Release

This article includes content from Global Oil & Gas Limited , licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GLV:AU
The Conversation (0)
Block VIII Represented by Ministry of Mines and Energy at International Oil Conference in Malaysia

Block VIII Represented by Ministry of Mines and Energy at International Oil Conference in Malaysia

(TheNewswire) GRANDE PRAIRIE, ALBERTA TheNewswire - September 15, 2026 - Angkor Resources Corp. (TSXV: ANK,OTC:ANKOF OTCQB: ANKOF) ("ANGKOR" OR "THE COMPANY") announces that Cambodia's Ministry of Mines and Energy ("MME") presented Block VIII — the onshore oil and gas concession held by the... Keep Reading...
Handshake image on block representing M&A activity.

Tamarack, Headwater Ink C$10 Billion Oil Mega-Merger

Tamarack Valley Energy (TSX:TVE,OTCPL:TNEYF) and Headwater Exploration (TSX:HWX) have agreed to a C$10 billion all-stock merger to form the largest pure-play oil producer in Canada’s Clearwater formation.Under a definitive arrangement agreement announced on Tuesday (September 8), Headwater... Keep Reading...
Syntholene Completes Phase One of Effects Testing at Iceland Demonstration Facility, Advances to High-Power Operations

Syntholene Completes Phase One of Effects Testing at Iceland Demonstration Facility, Advances to High-Power Operations

Syntholene Energy Corp. (TSXV: ESAF,OTC:SYNTF) (OTCQB: SYNTF) (FSE: 3DD0) ("Syntholene" or the "Company") announced today that it has successfully completed Phase One of its effects testing at its geothermally-integrated Solid Oxide Electrolyzer Cell ("SOEC") demonstration facility in Húsavík,... Keep Reading...
Angkor Resources Reports Visual Copper Mineralization In 2026 Drill Core From Andong BOR License, Cambodia

Angkor Resources Reports Visual Copper Mineralization In 2026 Drill Core From Andong BOR License, Cambodia

(TheNewswire) GRANDE PRAIRIE, ALBERTA (September 1, 2026) TheNewswire - Angkor Resources Corp. (TSXV: ANK,OTC:ANKOF OTCQB: ANKOF) ("ANGKOR" OR "THE COMPANY") announces preliminary geological observations from the logging of diamond drill core completed during the first phase of 2026 drill... Keep Reading...
Two square blocks with Iranian and American flags placed on a map of the Strait of Hormuz.

Oil Prices Top US$90 Amid Latest US-Iran Clash in Strait of Hormuz

Crude oil futures surged more than 2 percent to cross the US$90 per barrel threshold on Monday (August 31) morning following a direct military exchange between the US and Iran inside the Strait of Hormuz.The conflict reignited fears over global energy security — by early trading, Brent crude... Keep Reading...
Syntholene Energy Corp. Announces Closing of Upsized Non-Brokered Private Placement

Syntholene Energy Corp. Announces Closing of Upsized Non-Brokered Private Placement

Syntholene Energy Corp. (TSXV: ESAF,OTC:SYNTF) (FSE: 3DD0) (OTCQB: SYNTF) ("Syntholene" or the "Company") announced today the successful closing of the final tranche of its previously announced non-brokered private placement for aggregate gross proceeds of approximately $2.3 million (the... Keep Reading...

Interactive Chart

Latest Press Releases

Related News