TINONE REPORTS FURTHER STRONG TIN INTERCEPTS AND EXTENDS MINERALIZATION AT DEPTH AT ITS GREAT PYRAMID TIN PROJECT, TASMANIA, AUSTRALIA

TINONE REPORTS FURTHER STRONG TIN INTERCEPTS AND EXTENDS MINERALIZATION AT DEPTH AT ITS GREAT PYRAMID TIN PROJECT, TASMANIA, AUSTRALIA

TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) (" TinOne " or the " Company ") is pleased to provide further results from its Great Pyramid Tin (Sn) Project (" Great Pyramid " or the " Project ") located in the tier one mining jurisdiction of Tasmania, Australia . Drilling has now concluded, and data compilation and modelling are underway.  The program has been highly successful in continuing to define significant tin mineralization near surface and at depth below and adjacent to historical drilling.

Highlights:

  • Drillhole 22GPRC021 returned 14m@0.36% Sn from 128 metres and 17m@0.21% Sn from 181 metres
  • Drillhole 22GPRC014 returned 48.8m@ 0.14% Sn from 87 metres

"The diamond core extensions of drill holes 22GPRC014 and 22GPRC021 have delivered further encouraging results below the area of the historical resource at Great Pyramid," commented Chris Donaldson , Executive Chairman. "These drill holes have continued to demonstrate the quality of the Great Pyramid system which remains open in all directions. With the completion of this Phase 1 drill program our team has gained significant insights into the distribution and controls on mineralization and is now undertaking detailed modelling to determine the most appropriate next steps. We look forward to keeping the market updated as we continue to advance the Project."

Table 1: Great Pyramid RC drill results. More significant results are shown in bold.

Hole

Intersection
Width (m)

From
(m)

Sn%

Comments

22GPRC014

48.8

87

0.14

Part RC, part diamond tail. Below historical resource area


(36.8)

(87)

(0.15)

RC interval previously reported


5

171

0.13

Diamond tail. Below historical resource area

22GPRC021

14

128

0.36

Part RC, part diamond tail. Outside historical resource area


(11)

(128)

(0.37)

RC interval previously reported


17

181

0.21

Diamond tail. Outside historical resource area

NOTES: All intersections are calculated with a cut-off grade of 0.1% Sn with maximum consecutive internal waste of 4 metres.

All intersections are downhole widths, true widths are uncertain.

TinOne drill hole numbering is in the form 22GPRCXXX for reverse circulation ( RC) holes and 22GPRDDXXX for diamond holes with numbering allocated in sequence.

Analytical results have been received for holes 22GPRC002, 003, 004, 005, 006, 007, 009, 011, 012, 013, 014, 016, 017, 018A, 019, 021, 022 and 024. Hole 22GPRC020 failed at 12 metres and was not assayed. The target area for this hole was drilled by 22GPRC021.

Diamond holes completed to-date and with assays pending are 22GPDD10 and 22GPDD023 (Part). Diamond tail extensions have been completed for RC pre-collar holes 22GPRC003, 22GPRC004, 22GPRC005, 22GPRC006, 22GPRC014 and 22GPRC021 with assays pending for 22GPRC018A.

Results reported here represent data from both the upper reverse circulation component and the lower diamond drill component of holes 22GPRC014 and 22GPRC021.  The reverse circulation components have been previously reported (see TinOne news releases September 6, 2022 and October 11, 2022 ) and in this release, the combined intersections are reported where the diamond drill data are contiguous with the previously reported RC data (ie 22GPRC014 from 87 metres and 22GPRC021 from 128).

Results have been received for 3,816 metres of the Company's completed 4,687 metre drilling program at Great Pyramid. These results represent complete results for 18 RC reverse circulation drill holes, results from two diamond cored holes and partial results from one diamond cored hole, in addition to results from six diamond tails and partial results from one other diamond tail.

About the Great Pyramid Tin Project

Geological Setting

The Great Pyramid deposit is located around a topographical feature known as Pyramid Hill and is hosted by Silurian to Devonian Mathinna Supergroup sandstones.  The mineralization is formed by closely spaced sheeted northeast trending cassiterite (SnO₂) bearing veins associated with silicification and sericite-pyrite alteration. The deposit style and regional comparisons suggest that a tin-fertile granite exists at depth below the deposit, however this has not been encountered in drilling and the deposit is open at depth. Geological interpretation indicates that certain sedimentary units within the folded Mathinna Supergroup sediments are more favourable hosts and diamond drilling being undertaken by the Company during the current campaign, combined with numerical modelling, will assist in developing a deeper understanding of controls on grade for follow up drilling.

The deposit is currently known over a strike length of more than 500 metres with an average width of approximately 150 metres. The depth extent of the deposit is unknown with only nine historical drill holes greater than 150 metres deep. These rare deeper holes encountered encouraging tin mineralization to depths of approximately 300 metres below surface 2 .

Historic Resources and Drill Data 1

A historical mineral resource estimate was completed on the Great Pyramid Project (the " Historical Estimate ") for TNT Mines Ltd. 1,2,3,4,5 (Table 2).

Table 2: Historical Estimate on the Great Pyramid Project 1,2,3,4,5

Great Pyramid Inferred Mineral Resource - JORC 2012

Sn% CUT OFF

TONNES (Mt)

GRADE (Sn%)

CONTAINED TIN (kt)

0.1

5.2

0.2

10.4

NOTES

1.  Source: "Inferred Mineral Resource for the Great Pyramid Tin Deposit in Tasmania, Abbott, 2014" prepared by Jonathon Abbott of MPR for Niuminco Group Ltd. The effective date for the Historical Estimate is February 26, 2014.

2.  The Historical Estimate was prepared using the 2012 Australasian Joint Ore Reserves Committee Code (JORC). The Historical Estimate was not completed using CIM Definition Standards on Mineral Resources and Reserves and is not supported by a technical report completed in accordance with National Instrument 43-101.

3.  The estimation of the Historical Estimate utilized close spaced historic percussion (~85%) and lesser diamond drill holes with drill spacing in the estimation area typically 15 x 30m and locally closer. The Inferred Resource was estimated using Multiple Indicator Kriging method of 1.5 metre down-hole composites within a mineralized domain interpreted from tin grade. Continuity of tin grades was characterised by indicator variograms at 14 indicator thresholds. The estimates are extrapolated a maximum of approximately 30 metres from drilling.  Gemcom software was used for data compilation, domain wireframing, and coding of composite values, and GS3M was used for resource estimation. Resources were estimated into 15 by 30 by 3 m blocks (across strike, strike, vertical) aligned with the 067o trending drilling grid. Planview dimensions of the blocks approximate average drill hole spacing. For precise volume representation, resource estimates include the proportion of block volumes within the mineralised domain below surface. The modelling included a three-pass octant-based search strategy. Search ellipsoid radii (across strike, along strike, vertical) and minimum data requirements for these searches were: Search 1: 20 by 20 by 4 m (16 data), Search 2: 30 by 30 by 6 m (16 data), Search 3:30 by 30 by 6 (8 data). Model validation included visual comparison of model estimates and composite grades, and trend (swath) plots, along with comparison with estimates from alternative estimation methodologies and previous model estimates. The Historical Estimate is restricted to the area of close spaced drilling and 90% of the resource occurs within 40 metres of surface. Although the limited deeper drilling has encountered mineralized material this was not included in the Historical Estimate. The mineralised domain wireframe used to constrain the estimates was primarily interpreted on the basis of tin assay grades and restricts estimates to the volume tested by reasonably close spaced drilling. The wireframe was trimmed by the cross-cutting dyke and soil units interpreted from drill hole logging and geological mapping. Investigation of alternative interpretations included resource estimation with assumed dominant mineralisation controls varying from flat lying to steeply west dipping. These models did not give significantly different total estimates

4.  The reader is cautioned that the Historical Estimate is considered historical in nature and as such is based on prior data and reports prepared by previous property owners. The reader is cautioned not to treat them, or any part of them, as current mineral resources or reserves. A qualified person has not done sufficient work to classify the Historical Estimates as current resources and TinOne is not treating the Historical Estimates as current resources. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the Historical Estimates can be classified as a current resource.  There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability.  Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category.

5.  The Company has determined that the Historical Estimate is reliable, and relevant to be included here because it was estimated using close spaced drilling with modern geostatistical methods and software by an experienced resource geologist and provides a guide to the location of the Great Pyramid mineralised zone.  This will be used to assist in targeting drilling to undertake testing of the extent and grade of the mineralised system.

Quality Assurance / Quality Control

Drill core and RC samples were shipped to ALS Limited in Brisbane, Australia for sample preparation and for analysis. The ALS, Brisbane facilities are ISO 9001 and ISO/IEC 17025 certified. Tin and tungsten are analysed by ICP-MS following lithium borate fusion (ALS method ME-MS85), overlimit results are reanalysed by XRF (ALS method XRF15b).  Forty-eight element multi-element analyses are conducted by ICP-MS with a four-acid digestion (ALS method ME-MS61).

Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol.

About TinOne

TinOne is a TSX Venture Exchange listed Canadian public company with a high-quality portfolio of tin projects in the Tier 1 mining jurisdictions of Tasmania and New South Wales, Australia . The Company is focussed on advancing its highly prospective portfolio while also evaluating additional tin opportunities.   TinOne is supported by Inventa Capital Corp.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been reviewed and approved by Dr. Stuart Smith ., Technical Advisor for TinOne. Dr. Smith is a Qualified Person as defined under the terms of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward–Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward–looking information" under applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions, identify forward–looking statements or information. These forward–looking statements or information relate to, among other things: the development of the Company's projects, including drilling programs and mobilization of drill rigs; future mineral exploration, development and production; the release of drilling results; and completion of a drilling program.

Forward–looking statements and forward–looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of TinOne, future growth potential for TinOne and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; TinOne's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.

These statements reflect TinOne's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward–looking statements or forward-looking information and TinOne has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on early stage mineral projects; metal price volatility; risks associated with the conduct of the Company's mining activities in Australia ; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption "Risk Factors" in TinOne's management discussion and analysis. Readers are cautioned against attributing undue certainty to forward–looking statements or forward-looking information. Although TinOne has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. TinOne does not intend, and does not assume any obligation, to update these forward–looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

SOURCE TinOne Resources Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/January2023/18/c0982.html

News Provided by Canada Newswire via QuoteMedia

TORC:CA
The Conversation (0)
TinOne Resources

TinOne Resources


Keep reading...Show less

Exploring Tin Assets in Australia to Support a Sustainable Future

TINONE SAMPLES LITHIUM MINERALIZATION IN HISTORICAL DRILL CORE FROM ITS ABERFOYLE PROJECT, TASMANIA, AUSTRALIA

TINONE SAMPLES LITHIUM MINERALIZATION IN HISTORICAL DRILL CORE FROM ITS ABERFOYLE PROJECT, TASMANIA, AUSTRALIA

TSX.V: TORC   OTCQB: TORCF

DEFINES NEW STYLE OF MINERALIZATION PERIPHERAL TO PROSPECTIVE GRANITES

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
TINONE DEFINES NEW ZONE OF STRONG LITHIUM-IN-SOIL ANOMALISM AT ITS ABERFOYLE PROJECT, TASMANIA, AUSTRALIA

TINONE DEFINES NEW ZONE OF STRONG LITHIUM-IN-SOIL ANOMALISM AT ITS ABERFOYLE PROJECT, TASMANIA, AUSTRALIA

TSX.V: TORC   OTCQB: TORCF

TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) ( Frankfurt : 57Z0) (" TinOne " or the " Company ") is pleased to announce that it has defined a new zone of anomalous lithium-in-soil at its 100%-owned, 9,600 hectare Aberfoyle Project located in the tier-one mining jurisdiction of Tasmania, Australia .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
TINONE CLOSES FINAL TRANCHE OF PRIVATE PLACEMENT FINANCING

TINONE CLOSES FINAL TRANCHE OF PRIVATE PLACEMENT FINANCING

/NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES ./

TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) (" TinOne " or the " Company ") is pleased to announce that it has closed its final tranche of the non-brokered private placement financing, previously announced on May 18, 2023 June 2, 2023 and June 26, 2023 raising an additional C$153,000 .  The Company overall raised gross proceeds of C$781,000 issuing a total of 6,508,330 units of the Company (the " Units ") at a price of C$0.12 per Unit (the " Financing ").

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
TINONE ACQUIRES THE PROSPECTIVE TIN-LITHIUM MOUNT MAURICE PROJECT, TASMANIA, AUSTRALIA

TINONE ACQUIRES THE PROSPECTIVE TIN-LITHIUM MOUNT MAURICE PROJECT, TASMANIA, AUSTRALIA

TSX.V: TORC   OTCQB: TORCF

TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) ( Frankfurt : 57Z0) (" TinOne " or the " Company ") is pleased to announce that it been granted a total of 243 km 2 of new exploration tenure in northeast Tasmania.  In addition, the Company has applied for another 133 km 2 which has been recommended to be granted in the coming months. The road-accessible tenements, collectively called the Mount Maurice Project, are considered prospective for tin and lithium mineralization.  While northeast Tasmania has historically been a tin and tungsten producing region, recent exploration by several companies surrounding TinOne's tenements have focussed efforts on lithium prospectivity.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
TINONE CLOSES ADDITIONAL TRANCHE OF PRIVATE PLACEMENT FINANCING AND EXTENDS CLOSING

TINONE CLOSES ADDITIONAL TRANCHE OF PRIVATE PLACEMENT FINANCING AND EXTENDS CLOSING

TSX.V: TORC   OTCQB: TORCF

/NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES ./

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
SAGA Metals Expands Radar Ti-V-Fe Project Vision with Preliminary Metallurgical Insights and Major Exploration Milestones

SAGA Metals Expands Radar Ti-V-Fe Project Vision with Preliminary Metallurgical Insights and Major Exploration Milestones

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA,OTC:SAGMF) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to report dual advancements in its 2025 program: the completion of a detailed mineralogical and geological study prepared by Dr. Al Miller, that sets the stage for comprehensive metallurgical testing, and significant on-site exploration progress at the 100% owned Radar Titanium-Vanadium-Iron (Ti-V-Fe) Project near Cartwright, Labrador. Together, these developments underscore Radar's potential as a strategic critical metals project in North America.

Radar Ti-V-Fe Project in Labrador, Canada:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Annual Report to Shareholders

Altech Batteries Ltd Annual Report to Shareholders

Perth, Australia (ABN Newswire) - Altech Batteries Ltd (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("IKTS") to commercialise the revolutionary CERENERGY Sodium Chloride Solid State (SCSS) Battery. CERENERGY batteries are the game-changing alternative to lithium-ion batteries. CERENERGY batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY battery, with plans to construct a 120MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY battery modules to provide grid storage solutions to the market.

Altech has executed sales offtake Letters of Intent with three companies that covers the full first five years of production from the 120MWh production facility. Altech is now forging forward with securing the finance to construct the production facility, envisaged to be a combination of debt, equity from the sale of a minority interest in the project, and grants and subsidies.

The CERENERGY battery has achieved the highest possible dark green rating from Standard & Poors, due to its non-reliance on critical minerals as well as its expected 50% less greenhouse gas emissions to lithium-ion battery technology.

Altech has licenced its proprietary high purity alumina coating technology to 75% owned subsidiary Altech Industries Germany GmbH (AIG), which has finalised a Definitive Feasibility Study for the development of a 8,000tpa silicon/graphite alumina coating plant in the state of Saxony, Germany to supply its Silumina Anodes product to the burgeoning European electric vehicle market.

The Company patented its game changing technology of incorporating high-capacity silicon into lithium-ion batteries. Through in house R&D, the Company has cracked the "silicon code" and successfully achieved a 55% higher energy battery with improved cyclability or battery life. Higher density batteries result in smaller, lighter batteries and substantially less greenhouse gases, and is the future for the EV market. The Company's proprietary silicon graphite product is registered as Silumina Anodes.

The Company is in the race to get its patented technology to market, has finalised the construction of a Silumina Anodes pilot plant at AIG's industrial site within the Schwarze Pumpe Industrial Park in Saxony, Germany. The European silicon feedstock supply partner for this plant will be Ferroglobe. The project has also received green accreditation from the independent Norwegian Centre of International Climate and Environmental Research (CICERO). The pilot plant adjacent to the proposed project site will allow the qualification process for its Silumina Anodes product. AIG has executed NDAs with German and American automakers as well as a European based battery company.

The pilot plant to produce commercial samples of the product has now been completed and is operational. Altech is working to ramp up production of the pilot plant in order to provide the commercial samples to the prospective companies for their independent testing within their product range.

*To view the full Annual Report, please visit:
https://abnnewswire.net/lnk/35XEX5O2



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
A.I.S. Resources Signs Earn-In Agreement with Riversgold on the New Copper/Gold/Antimony Discovery at Saint John, New Brunswick

A.I.S. Resources Signs Earn-In Agreement with Riversgold on the New Copper/Gold/Antimony Discovery at Saint John, New Brunswick

A.I.S. Resources Limited (TSXV: AIS,OTC:AISSF, OTC-Pink: AISSF) ("AIS" or the "Company") is pleased to announce that it has entered into an earn-in agreement with Riversgold Ltd. (ASX: RGL) ("Riversgold"), granting AIS the right to acquire up to a 75% interest in the new Saint John IOCGPorphyry Project located in New Brunswick, Canada.

AIS CEO Marc Enright-Morin commented, "We are excited to partner with Riversgold on this very exciting newly discovered Saint John Project. The combination of very high-grade mineralisation, excellent infrastructure, and district-scale potential provides AIS with a unique opportunity to advance a possible IOCG/porphyry system in one of Canada's most mining-friendly jurisdictions. Saint John is exploration and drill ready with two drill programs already approved. Its unique location near the coast means we can explore here in a meaningful way all year round and we look forward to getting the drills turning and come up with the discovery hole."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

Altech Batteries (ATC:AU) has announced ALTECH - CERENERGY Battery Prototype Reaches Key Milestones

Download the PDF here.

Altech Batteries Ltd  CERENERGY Battery Prototype Reaches Key Milestones

Altech Batteries Ltd CERENERGY Battery Prototype Reaches Key Milestones

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce the latest performance results of the CERENERGY(R) cell and battery pack prototypes. These results confirm the technological maturity and robustness of the CERENERGY(R) technology and mark another decisive step towards industrialisation.

Highlights

- 650+ cycles with no capacity loss, proving exceptional material stability and long operational lifespan compared to conventional batteries

- Near 100% Coulombic efficiency, confirming minimal side reactions and strong intrinsic safety of sodium nickel chloride chemistry

- High energy efficiency of up to 92%, surpassing typical 70-80% levels of competing battery technologies

- Proven safety under extreme conditions - cells remained stable during overcharge, deep discharge, and thermal cycling up to 300 degC with no gassing, leakage, or rupture

- Robust and reliable chemistry - sodium nickel chloride avoids flammable electrolytes and runaway risks, confirming suitability for safe, large-scale grid and renewable energy storage

- ABS60 prototype validated under real-world conditions -tested across diverse load profiles, high-current pulses up to 50 A, and thermal variations

- Stable, efficient performance - achieved ~88% round-trip efficiency with no observable capacity fade over 110+ cycles

CELL PERFORMANCE

The CERENERGY(R) prototype cells have successfully completed over 650 charge-discharge cycles without any detectable capacity loss. Cycle life is a critical measure of battery durability, as most conventional batteries experience gradual degradation with every cycle. Achieving such performance highlights the outstanding stability of the materials and points to the potential for a long operational lifespan.

For stationary energy storage systems (ESS), this translates into fewer battery replacements, lower lifetime operating costs, and greater reliability for end users.

The cells also delivered nearly 100% Coulombic efficiency alongside an energy efficiency of up to 92% across 650 cycles. Coulombic efficiency reflects the proportion of charge recovered during discharge relative to what was supplied during charging. A value approaching 100% indicates minimal side reactions or parasitic losses, confirming the intrinsic stability and safety of sodium nickel chloride chemistry. This high efficiency demonstrates that the cells are not expending energy on unwanted processes such as electrode degradation. Such performance is vital for scalability, ensuring reliable, longterm operation in commercial energy storage applications.

Energy efficiency represents the proportion of energy delivered relative to the energy supplied. Competing technologies, including conventional high-temperature batteries and many flow batteries, typically achieve only around 70-80%. By reaching 92%, CERENERGY(R) positions itself in a highly competitive class, offering more cost-effective energy storage, stronger economics for grid operators, and seamless compatibility with the requirements of renewable energy integration.

The cells achieved a nominal capacity of 100 Ah and 250 Wh, with reliable performance even at higher discharge rates. A key feature is their ability to support multiple daily charge-discharge cycles within the 20-80% state of charge (SoC) range at 25 A. This capability positions CERENERGY(R) as a highly flexible solution for grid operators and energy storage providers, enabling cost-efficient, long-life performance in applications that demand frequent cycling such as renewable integration, peak shaving, and backup power.

CERENERGY(R) prototype cells underwent rigorous abuse testing, including overcharge to 4 V, deep discharge to 0.2 V, and thermal cycling between room temperature and 300 degC. In all cases, the cells remained stable with no gassing, leakage, or rupture -clear proof of their outstanding safety. These results highlight the intrinsic stability of sodium nickel chloride chemistry, which avoids the flammable electrolytes and runaway risks common in lithium-ion batteries. The ability to withstand extreme electrical and thermal stress demonstrates CERENERGY(R)'s robustness and confirms its suitability for safe, largescale deployment in grid, renewable, and industrial energy storage applications. This was achieved over 3 cycles with 1.8 Full Charge Equivalent (FCE) into 22 hours.

BATTERY PACK ABS60 (60 kWh) PROTOTYPE

The first ABS60 battery pack prototype has been successfully validated under real-world operating conditions, marking a major step forward in product readiness. Testing included diverse load profiles,

continuous discharges at 25 A (equivalent to C-rate of C/4 (discharges in 4 hours), or one-quarter of the pack's rated capacity per hour) at 80% depth of discharge (DoD), short-duration high-current pulses up to 50 A, and carefully controlled thermal variations.

The pack consistently demonstrated stable performance, achieving ~88% round-trip efficiency while maintaining reliable thermal management. Efficiency refers to the proportion of input energy that can be retrieved during operation-a critical measure of economic viability for large-scale storage. Over more than 110 cycles, results showed no observable capacity fading and only a slight increase in internal resistance. Capacity fading refers to the gradual decline in usable energy over repeated cycles, while internal resistance influences power delivery and heat generation.

The absence of meaningful degradation confirms the durability and electrochemical stability of the ABS60 design. These outcomes are highly significant as they demonstrate that the pack can withstand real-world duty cycles while retaining performance and efficiency, translating into longer service life, fewer replacements, and lower total cost of ownership.

For grid operators and renewable integration projects, this combination of robust cycling capability, efficiency, and thermal stability underscores the ABS60's commercial readiness and competitive advantage in the stationary energy storage market.

These results are a strong confirmation of CERENERGY(R)'s technological leadership and a clear signal of the technology's competitiveness and robustness for future applications in energy storage and industrial markets.

Group Managing Director, Iggy Tan said "These results confirm CERENERGY(R)'s robustness and readiness for market adoption. Demonstrating long cycle life, high efficiency, and unmatched safety, we are now strongly positioned to deliver a competitive and sustainable alternative for grid and industrial energy storage."

*To view photographs, tables and figures, please visit:
https://abnnewswire.net/lnk/17QS44T3



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×