South Star Battery Metals Announces Drilling & Exploration Program Update for Alabama Graphite Project and Geophysics Program for Santa Cruz Mine in Brazil

South Star Battery Metals Announces Drilling & Exploration Program Update for Alabama Graphite Project and Geophysics Program for Santa Cruz Mine in Brazil

South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV: STS) (OTCQB: STSBD), is pleased to announce that it has contracted a drilling company for the maiden diamond ("DDH") drilling campaign to begin in September 2022 . The Alabama exploration program includes:

South Star Battery Metals Corp Logo (CNW Group/South Star Battery Metals Corp.)

  • Drilling 10-15 holes (HQ);
  • Logging & Assays;
  • QA/QC Program with Blanks, Duplicates and Standards;
  • Background Water Quality Testing;
  • Geotechnical Drilling / Installation of a Piezometer to Monitor Groundwater Levels; &
  • Drill Pad Construction and Reclamation.

In addition, the Company is preparing to mobilize a geophysics contractor to perform approximately 4-5 linear kilometers of geophysics to test the limits of the priority drilling targets at the Santa Cruz Mine in Bahia, Brazil prior to beginning the 2023 drilling program. The proposed deliverables and schedule of the 2022/2023 exploration programs follow:

  1. Alabama Graphite Project Exploration Program Update
  • Maiden DDH Drilling Campaign (Sept- Oct 2022 )
  • Maiden 43-101 Technical Report & Maiden Resource Estimate (Q1 2023)
  • 2000m Drilling Campaign (Q2/Q3 2023)
  • Santa Cruz Mine Exploration Program Update
    • Geophysics Campaign (Q3/Q4 2022)
    • 4000 – 5000m Drilling Campaign (Q2/Q3 2023)

    Richard Pearce , CEO of South Star, said, "We are excited to get the maiden drilling campaign started in Alabama and test the extents of the mineralization. This initial drilling campaign will be focused on testing limits and generating significant targets for the 2023 drilling campaign, which will ultimately result in a Preliminary Economic Assessment(" PEA"). The Company anticipates the PEA will be completed by Q4 2023. At Santa Cruz , the geophysics program should help us improve our drilling hit rate and test limits of the 10-15 near-term targets we have previously identified in preparation for the 2023 drilling campaign, which is scheduled to begin after the rainy season in 2023. The Santa Cruz 2023 campaign will be a mix of diamond and RC drilling, and the proposed meters would significantly increase the total meters into the Project. Our goals are to generate a significantly larger resource and reserve estimate to support our future Phase 2/3 expansion plans. We are eager to get the drills turning as we scale our upcoming production."

    South Star Battery Metals Corp. is a Canadian battery metals project developer focused on the selective acquisition and development of near-term production projects in the Americas. South Star's Santa Cruz Graphite Project, located in Southern Bahia, Brazil is the first of a series of industrial and battery metals projects that will be put into production. Brazil is the second-largest graphite-producing region in the world with more than 80 years of continuous mining. Santa Cruz has at-surface mineralization in friable materials, and successful large-scale pilot-plant testing (>30t) has been completed. The results of the testing show that approximately 65% of Cg concentrate is +80 mesh with good recoveries and 95%-99% Cg. With excellent infrastructure and logistics, South Star is carrying its development plan towards Phase 1 production projected in Q3 2023.

    South Star's next project in the development pipeline is a project in Alabama located in the middle of a developing electric vehicle, aerospace and defence hub in the southeastern United States.  The Project is a historic mine active during World Wars I & II.  Trenching, sampling, analysis and preliminary metallurgic testing has been completed.  The testing indicated a traditional crush/grind/flotation concentration circuit achieved grades of approximately 96-97% with approximately 86% recoveries. South Star is executing on its plan to create a multi-asset, diversified battery metals company with near-term operations in strategic jurisdictions.  South Star trades on the TSX Venture Exchange under the symbol STS, and on the OTCQB under the symbol STSBF.

    South Star is committed to a corporate culture, project execution plan and safe operations that embrace the highest standards of ESG principles based on transparency, stakeholder engagement, ongoing education and stewardship. To learn more, please visit the Company website at https://www.southstarbatterymetals.com .

    This news release has been reviewed and approved by Richard Pearce, P.E., a "Qualified Person" under National Instrument 43-101 and President and CEO of South Star Battery Metals Corp.

    On behalf of the Board,

    Mr. Richard Pearce
    Chief Executive Officer

    Twitter: https://twitter.com/southstarbm
    Facebook: https://www.facebook.com/southstarbatterymetals
    LinkedIn: https://www.linkedin.com/company/southstarbatterymetals/
    YouTube: South Star Battery Metals - YouTube

    CAUTIONARY STATEMENT

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

    Forward-Looking Information

    This press release contains "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be "forward-looking statements". Forward-looking statements in this press release include, but are not limited to, statements regarding: moving Santa Cruz into production and scaling operations as well as advancing the Alabama project;   and   the Company's plans and expectations.

    Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate financing on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks related to commodity price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty to forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances. Actual events or results could differ materially from the Company's expectations or projections.

    Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/south-star-battery-metals-announces-drilling--exploration-program-update-for-alabama-graphite-project-and-geophysics-program-for-santa-cruz-mine-in-brazil-301622167.html

    SOURCE South Star Battery Metals Corp.

    Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/September2022/13/c9173.html

    News Provided by Canada Newswire via QuoteMedia

    STS:CA
    The Conversation (0)
    South Star Announces Additional Sales of Natural Flake Graphite Concentrate to U.S. Customer

    South Star Announces Additional Sales of Natural Flake Graphite Concentrate to U.S. Customer

    Advancing the First New Natural-Flake Graphite Mine in the Americas this Century

    South Star Battery Metals CORP. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF) is pleased to announce that, further to the Company's May 6, 2024 announcement ("South Star Battery Metals Announces the First Sale of Natural Flake Graphite Concentrate from its Santa Cruz Graphite Mine in Brazil") and its August 1, 2024 announcement ("South Star Announces Successful Product Qualification and 100-Tonne Sale of Natural Flake Graphite Concentrate to U.S. Customer"), South Star has executed another binding commercial sales agreement (the "Agreement") for an initial 40 tonnes (more than 88,000 pounds) of natural-flake graphite concentrate from the Company's flagship Santa Cruz Graphite Mine("Santa Cruz"), located in northeastern Brazil's Bahia state. This most recent sales Agreement was formally executed with a prominent American industrial graphite customer (the "U.S. Client

    News Provided by ACCESSWIRE via QuoteMedia

    Keep reading...Show less
    South Star Announces Successful Product Qualification and 100-Tonne Sale of Natural Flake Graphite Concentrate to U.S. Customer

    South Star Announces Successful Product Qualification and 100-Tonne Sale of Natural Flake Graphite Concentrate to U.S. Customer

    South Star advancing the first new natural-flake graphite mine in the Americas this century.

    South Star Battery Metals CORP. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF) is pleased to announce that further to the Company's May 6, 2024 announcement ("South Star Battery Metals Announces the First Sale of Natural Flake Graphite Concentrate from its Santa Cruz Graphite Mine in Brazil"), South Star has executed another binding commercial sales agreement (the "Agreement") for the initial purchase of 100 tonnes (more than 220,000 pounds) of graphite concentrate from the Company's flagship Santa Cruz Graphite Mine ("Santa Cruz"), located in northeastern Brazil's Bahia state

    News Provided by ACCESSWIRE via QuoteMedia

    Keep reading...Show less
    South Star Announces Substantial Completion and Commissioning of the Santa Cruz Phase 1 Graphite Mine in Brazil

    South Star Announces Substantial Completion and Commissioning of the Santa Cruz Phase 1 Graphite Mine in Brazil

    Highlights

    • Mine prestrip, preliminary dump foundations and ramps are complete, and approximately 50,000 tonnes of ore is being placed on the ore pad by end of August for commissioning and initial operations.

    News Provided by ACCESSWIRE via QuoteMedia

    Keep reading...Show less
    South Star Battery Metals Announces Successful Metallurgical Results for its BamaStar Graphite Project in Alabama, USA

    South Star Battery Metals Announces Successful Metallurgical Results for its BamaStar Graphite Project in Alabama, USA

    Highlights:

    • Metallurgical work completed on representative oxide, transition and fresh rock composite samples ranging in grade from 2.36% Cg for fresh rock to 3.04% Cg for oxide samples.
    • Bond abrasion and work index testing show low to medium abrasion and low energy requirements.
    • Open circuit flotation tests resulted in excellent concentrates grade ranging from 94.4% Cg for fresh rock materials to 99.5% Cg for oxide samples with a simple flowsheet that maximizes graphite recovery and minimizes flake degradation.
    • The open circuit graphite recoveries were high, ranging between 87.5% and 91.5%.
    • Given the superior response of the oxide and transitional material, the next phase of work will investigate mining pit design to maximize processing of oxide and transitional material early in the project life and postpone mining of the fresh ore in order to decrease initial CAPEX, lower OPEX and target improved project economics.
    • The NI43-101 Preliminary Economic Assessment results for BamaStar are scheduled for release in August 2024.

    South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF) is pleased to announce successful results from the ongoing metallurgical process development program for the Bama Star graphite project in Alabama, USA

    News Provided by ACCESSWIRE via QuoteMedia

    Keep reading...Show less
    South Star Battery Metals Announces Land Purchase, Construction Update, and the Approval of the Definitive Mining Licenses For Phases 1, 2 & 3 for its Santa Cruz Graphite Mine in Brazil

    South Star Battery Metals Announces Land Purchase, Construction Update, and the Approval of the Definitive Mining Licenses For Phases 1, 2 & 3 for its Santa Cruz Graphite Mine in Brazil

    Santa Cruz Graphite Mine Highlights:

    • Final payment of land purchase for Phase 1 Plant and Operations.
    • Approval of the Definitive Mining Licenses For Phases 1, 2 & 3. All mining and environmental licenses/permits are approved and in-hand for the future phased, modular expansion of Santa Cruz graphite production up to 50,000 tonnes/year.
    • Phase 1 construction is on schedule for substantial completion by the end of June 2024 followed by a 6-week plant commissioning and ramp-up period. Commercial sales are planned to start in September 2024. Name plate production capacity is expected to be reached in Q4 2024.

    South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF) is pleased to announce the final payment of the previously announced (Aug. 02, 2022) land purchase required for construction of the Phase 1 mine and plant facilities. The farm totals approximately 325 hectares and is where all the plant facilities, mine and infrastructure installations are required for the first three years of operations at its Santa Cruz Graphite Project in Bahia, Brazil

    News Provided by ACCESSWIRE via QuoteMedia

    Keep reading...Show less
    Altech Batteries

    Altech Batteries


    Keep reading...Show less
    E-Power Resources (CSE:EPR)

    E-Power Resources


    Keep reading...Show less
    Hazer Group Ltd

    Hazer and KBR Enter Global Deal to Accelerate Licensing and Commerciali

    Hazer Group Ltd ("Hazer" or "the Company") (ASX: HZR) is pleased to announce it has entered into a binding Alliance Agreement (the “Alliance”) with Kellogg Brown and Root LLC (NYSE: KBR, “KBR”) a global leader in technology and engineering solutions, for the commercial deployment and licensing of Hazer’s proprietary methane pyrolysis technology.

    Keep reading...Show less
    NextSource Materials

    NextSource Materials Announces Executive Transition to Drive Molo Mine Optimization and Prepare for Future Expansion

    NextSource Materials Inc. (TSX:NEXT)(OTCQB:NSRCF) ("NextSource" or the "Company") announces that Mr. Johnny Velloza will be stepping down from his position as Interim Chief Operating Officer, following a successful tenure during which he provided critical operational oversight and implemented key recommendations for process optimization at the Molo mine.

    Mr. Velloza's responsibilities will be transitioned to Mr. Nick Miller, who has been appointed as Acting Executive Vice President, Operations. This newly consolidated role merges the responsibilities of Interim Chief Operating Officer and General Manager, enabling a more streamlined and effective management structure as part of the broader organizational restructuring of the Molo operations.

    Keep reading...Show less
    E-Power Resources (CSE:EPR)

    E-Power Resources Inc. Announces Closing of a Second Tranche of Private Placement

    E-Power Resources Inc. (CSE: EPR) (FSE: 8RO) ("E-Power" or the "Company") announces that it has closed the second tranche of the private placement (the "Second Tranche") previously announced on March 12, 2025 (the "Private Placement").

    An aggregate of 3,276,000 units (the " Units") of the Company were issued in the Second Tranche of the Private Placement at a price of $0.05 per Unit for gross proceeds of $163,800, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each full Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date (the "Offering").

    Keep reading...Show less

    Latest Press Releases

    Related News

    ×