NiCAN Reports High Grades in First Two Drill Holes at the Wine Project in Manitoba, Including 27.3 Metres of 2.61% Nickel Equivalent

NiCAN Reports High Grades in First Two Drill Holes at the Wine Project in Manitoba, Including 27.3 Metres of 2.61% Nickel Equivalent

NiCAN Limited ("NiCAN" or the "Company") ( TSXV: NICN) has received outstanding assay results from the first two diamond drill holes drilled in 2022 at the Wine project in Manitoba. These drill holes were part of NiCAN's initial drilling campaign at the Wine project and were drilled vertically to gain an understanding of the overall thickness and orientation of mineralization encountered in the historical drilling.

Highlights (complete assays are set out in Tables 1 and 2):

  • Diamond drill hole Wine-22-05 intersected three distinct zones of mineralization including 27.3 metres at 2.01% Ni, 1.81% Cu, 0.09% Co, 0.20 g/t Au and 0.28 g/t Pd from 43.0 to 69.3 metres (NiEq of 2.61%)
  • Diamond drill hole Wine-22-02 intersected four zones of mineralization including 2.8 metres at 1.87% Ni, 0.64% Cu, 0.08% Co and 0.46 g/t Pd from 45.8 to 48.6 metres (NiEq of 2.08%).

Note: Nickel Equivalent ("NiEq") was calculated using copper and nickel values only.

Brad Humphrey, President, and CEO of NiCAN commented,"This is an excellent result from our initial drilling at the Wine project. This drilling program was designed to improve our understanding of the Wine Occurrence, confirm the mineralization encountered in the historical drilling and determine the orientation of the mineralized body. Intersecting multiple zones containing high nickel equivalent values is very encouraging."

2022 Exploration Program

The 56.8 km2 Wine property is located west of Snow Lake in Manitoba (Figure 4). The initial 2022 exploration program included an airborne geophysical survey, partial resampling of a historical drill hole, downhole geophysical (electro-magnetic) surveys and 17 diamond drill holes, 1,600 metres in total, testing an area known as the Wine Occurrence, as well as seven other nearby geophysical anomalies. The objective of this program was to confirm the presence of nickel-copper mineralization at the Wine Occurrence and improve NiCAN's understanding of the geological model and the orientation of the mineralization, which will be used to better target future drilling programs.

NiCAN anticipates receiving and releasing the assay and geophysical survey results, following quality control, over the next several weeks. The results from this initial exploration work will be used to refine the geological model and to design a follow up Phase 2 exploration plan.

Wine-22-02

Immediately following the overburden, drill hole Wine-22-02 intersected 0.7 metres averaging 0.64% Cu and 0.27% Ni (NiEq of 0.49%) from 7.2 to 7.9 metres. This was followed by three additional mineralized intersections down hole, including 4.6 metres averaging 1.02% Cu and 0.74% Ni (NiEq of 1.07%), 0.3% Co and 0.28 g/t PGMs ("Au+Pt+Pd") from 34.9 to 39.5 metres; 2.8 meters averaging 0.64% Cu and 1.87% Ni (NiEq of 2.08%), 0.08% Co and 0.56 g/t PGMs from 45.8 to 48.6 metres as well as 6.1 metres averaging 1.9% Cu, 0.09% Ni (NiEq of 0.71%), 0.003% Co and 2.49 g/t PGMs from 60.8 to 66.9 metres (Figure 1).

Figure 1: Drill holes Wine-22-02 and Wine-22-05 Presented in a Section Looking Northwest (300⁰)

There appears to be a strong correlation between intersections of higher-grade copper assays and elevated PGM grades. An 11.20% Cu assay from 60.8 to 61.4 metres also returned 6.0 g/t Au, 1.01 g/t Pt and 1.47 g/t Pd. Another significant copper assay of 9.47% Cu from 66.5 to 66.9 metres also returned 8.35 g/t Au, 1.20 g/t Pt and 6.18 g/t Pd.

All mineralized intersections were hosted by gabbro with the last three hosted by a distinct light-coloured gabbro unit.

Wine-22-05

Wine-22-05 was drilled 16 metres northeast of Wine-22-02 and intersected three zones of mineralization starting at 25.0 metres downhole. They include 4.1 metres averaging 1.03% Cu and 0.96% Ni (NiEq of 1.31%), 0.05% Co and 0.29 g/t PGMs from 25.0 to 29.1 metres; 3.8 metres averaging 2.42% Cu and 0.52% Ni (NiEq of 1.27%), 0.03% Co and 0.92 g/t PGMs from 34.8 to 38.4 metres and 27.3 metres averaging 1.81% Cu and 2.01% Ni (NiEq of 2.61%), 0.09% Co, 0.46 g/t PGMs from 43.0 to 69.3 metres. All were hosted by the light-coloured gabbro unit (Figure 1).

The initial mineralized zone encountered in drill hole Wine-22-05, which intersected 4.6 metres averaging 1.02% Cu and 0.74% Ni (NiEq of 1.07%), is interpreted to be a separate zone than that intersected in drill hole Wine-22-02. Further work is required to determine this zone's extent and characterization. Subsequent zones intersected in the drill hole can be correlated to those in drill hole Wine-22-02, as well as historical drill hole RAD07-01 (20.4 metres averaging 1.38% Ni and 2.14% Cu (NiEq of 2.09% Ni)), EEL-346 (16.5 metres averaging 0.85% Ni and 1.50% Cu (NiEq of 1.35% Ni)) and EEL-302 (12.8 metres averaging 0.52% Ni and 0.97% Cu (NiEq of 0.84% Ni)) (Figure 2) (see press release dated August 23, 2022).

On the section where drill hole Wine-22-05 intersects proximal to historical drill holes EEL-346 and RAD07-01, the mineralized zone is estimated at a true width of 16 metres and a thickness of 27 metres.

Figure 2: Drill Holes Wine-22-02 and Wine-22-05 Presented in a Section Looking Northwest (350⁰) and including Historical Drill Holes*

Figure 3: Historical Drill Hole Locations

igure 4: Wine Project Location

* Historical drill hole assays are listed in Table 3

Assay, Analysis and QA/QC

All core samples were sent to the Saskatchewan Research Council ("SRC") in Saskatoon (an accredited laboratory) by secure transport for base and precious metal assay. Base metals were assayed by their ICP3 package, which includes a total of 35 analytes by ICP-OES (Inductively Coupled Plasma – Optical Emission Spectroscopy). Partial digestions were performed on a 0.5 gram aliquot of sample pulp which was digested in a mixture of HCl:HNO3, in a hot water bath and then diluted to 15 ml using deionized water. Over-limits for copper, nickel and cobalt had an aliquot of 1.0 gram sample pulp digested in a concentration of HCl:HNO3. The digested volume was then made up with deionized water for analysis by ICP-OES. Fire Assay Techniques involved a 30 gram aliquot of sample pulp which was mixed with a standard fire assay flux in a clay crucible and a silver inquart added prior to fusion. After the mixture was fused, the melt was poured into a form which was cooled. The lead bead was then recovered and cupelled until only the precious metal bead remained. The bead was then parted in dilute HNO3. The precious metals were then dissolved in aqua regia and then diluted for analysis by ICP-OES

Laboratory Quality Control protocols were applied to the assay sample package by SRC. NiCAN submitted a regular schedule of standards, blanks and duplicates into the sample stream for Quality Control measures. Drill core samples are split in half using a diamond saw with half saved for reference and the other half shipped for assay. In the case of duplicate samples the half core is quarter split with the two quarter splits sent for separate assay.

NiCAN does not have any historic QA/QC data for the 2007 or earlier drill results.

Table 1: Assay List – Diamond Drill Hole Wine-22-02

Table 2: Assay List – Diamond Drill Hole Wine-22-05

Table 3 – Historical Drill Hole Assays

Note: NiEq includes Ni and Cu values only - Ni+(Cu x 0.33)

Qualified Person

Mr. Bill Nielsen, P.Geo, a consultant to NiCAN, who is a qualified person under National Instrument 43-101 – Standards of Disclosure of Mineral Projects ("NI 43-101") has reviewed and approved the scientific and technical information in this press release.

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol "NICN" on the TSX-V. The Company is actively exploring two nickel projects, both located in well-established mining jurisdictions in Manitoba, Canada.

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com.

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain "forward-looking information" under applicable securities laws concerning the proposed financing, business, operations and financial performance and condition of NiCAN Limited. Forward-looking information includes, but is not limited to, the size and timing of the drill program, results of the drill program, NiCAN's ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of the properties of the Company; future commodity prices (including in relation to NiEq calculations); drilling and other exploration potential; costs; and permitting. Forward-looking information may be characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or delays. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Source

NICN:CA
The Conversation (0)
NiCAN Commences Drilling at Wine Nickel Property, Manitoba, Canada

NiCAN Commences Drilling at Wine Nickel Property, Manitoba, Canada

NiCan Limited ("NiCAN" or the "Company") (TSX-V: NICN) has commenced diamond drilling at its Wine Property located in the Snow Lake area, Manitoba, Canada (Figure 1). The drill rig has mobilized to site and is currently coring the first hole of the Phase Three ("Phase III") drilling program consisting of a minimum of 1,500 meters.

Figure 1: Wine Project Location (CNW Group/Nican Ltd.)

Highlights:
  • Phase III drill program has commenced at the high-grade Wine Nickel Property with the following objectives:
    • To expand previously defined nickel-bearing zones to the east of the Wine Occurrence; and
    • To drill test newly expanded target areas of more than 6 km along strike.
  • Recent geophysical and soil geochemical results assisted in prioritizing multi-anomaly target areas for subsequent drill testing.

Brad Humphrey , President, and CEO of NiCAN commented, "We are very pleased to be back on the ground, drill testing several targets that we have interpreted to be on strike with the two mineralized horizons defined on the property to date. NiCAN remains in a strong position with a solid balance sheet and two highly prospective nickel sulfide projects in established mining jurisdictions."

Phase III Wine Drill Program

At the Wine Project, NiCAN is drilling a minimum of 1,500 meters to test multiple conductive targets identified by recently completed surface time-domain electromagnetic ("TDEM"), borehole and surface surveys, combined with re-processed Versatile Time Domain Electromagnetic ("VTEM") airborne geophysical survey, which was completed in 2022 (see press release dated November 14, 2022 ). Results from a geochemical survey, also completed earlier this year, assisted in prioritizing the drill targets. A significant number of conductive sources have been defined over a strike length of 6 kilometers that merit drill testing. These have been geophysically modelled and drill holes have been designed to effectively intersect the suspected sulphide bodies defined by these models.

The initial diamond drill targets are following up on mineralization intersected during the previous drill program that defined varying quantities of disseminated to massive sulphide nickel-bearing mineralization in a zone 650 meters east of the Wine Occurrence. Most notable were holes Wine 23-08 and Wine 23-07 in which varying degrees of pyrrhotite and chalcopyrite mineralization were intersected in two relatively shallow zones. Assay results returned elevated copper and nickel values over core lengths of more than 10 meters (see press releases dated May 24, 2023 , and June 21, 2023 ). NiCAN is currently following up on these new zones to better understand their orientation and extent.

The Phase III Wine drill program has two primary objectives. Initially, NiCAN anticipates expanding previously defined nickel-bearing zones located to the east of the Wine Occurrence. Downhole and TDEM surveys have defined multiple conductors along a distinct stratigraphic horizon within the Wine Gabbro. Humic soil geochemical results have shown anomalous Ni-Cu values associated with these electromagnetic ("EM") responses supporting additional drill testing.

The second objective of NiCAN's Phase III drill program is to identify additional nickel bearing mineralized zones associated with newly defined geophysical targets interpreted to be along strike from the Wine Occurrence by distances of up to 4.8 km. These are new targets that have not been drill tested in the past.

NiCAN continues to follow up on the significant results returned from previous diamond drilling, including:

  • Diamond drill hole Wine 22-5 intersected 27.3 metres of 2.01% Ni, 1.81% Cu (2.28% NiEq)
  • Diamond drill hole Wine 22-6 intersected 9.8 metres of 1.23% Ni, 2.09% Cu (1.71% NiEq)
  • Diamond drill hole Wine 22-3 intersected 8.6 metres of 1.89% Ni, 1.01% Cu (1.92% NiEq)
  • Diamond drill hole Wine 23-16 intersected four zones of mineralization including 12.6 metres of 1.52% Ni, 2.01% Cu (1.93% NiEq)
  • Diamond drill hole Wine 23-17 intersected two zones of mineralization including 23.5 meters of 1.59% Ni, 1.76% Cu (1.91% NiEq)

Note: Nickel equivalent grades include nickel and copper values only and assume recoveries of 85% for nickel and 85% for copper based on comparable deposits. Nickel price: US$10.00 /lb; copper price US$3.75 /lb.

Analogies to Historical Lynn Lake Nickel Deposits

NiCAN believes that the nickel mineralization hosted by the Wine Gabbro may have analogies to the nickel-copper deposits in the Lynn Lake area where approximately 22.2 million tonnes averaging 1.0% nickel and 0.5% copper was historically mined. The Farley Mine consisted of multiple lenses of mineralization contained within a 4.2 km 2 gabbro body. The Wine Gabbro contains numerous similarities and has seen very little exploration for nickel-copper deposits.

Qualified Person

Mr. Bill Nielsen , P.Geo, a consultant to NiCAN, who is a qualified person under National Instrument 43-101 – Standards of Disclosure of Mineral Projects ("NI 43-101") has reviewed and approved the scientific and technical information in this news release.

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol "NICN" on the TSX-V. The Company is actively exploring two nickel projects , both located in well-established mining jurisdictions in Manitoba, Canada .

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at   www.nicanltd.com

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain "forward-looking information" under applicable securities laws concerning the business, operations and financial performance and condition of NiCan Limited. Forward-looking information includes, but is not limited to, the size and timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN's ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of the properties of the Company; future commodity prices (including in relation to NiEq calculations); drilling and other exploration potential; costs; and permitting. Forward-looking information may be characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or delays. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Nican Logo (CNW Group/Nican Ltd.)

SOURCE Nican Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/October2023/19/c4074.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NiCAN Provides Details on Upcoming Drill Program at Wine Nickel Property, Manitoba, Canada

NiCAN Provides Details on Upcoming Drill Program at Wine Nickel Property, Manitoba, Canada

NiCan Limited ("NiCAN" or the "Company") (TSXV: NICN) is pleased to provide details on its upcoming Phase III drill program on the Wine Property, located in the Snow Lake area of Manitoba, Canada (Figure 3). Permits are in place, a drill contractor has been selected, and preparation work is underway. Initially, Phase III drilling will consist of a 1,500 to 2,000-meter diamond drilling program, which is scheduled to commence in October 2023 . The Phase III program will focus on expanding the recently identified nickel-bearing zones to the east of the Wine Occurrence and test newly defined geophysical targets along strike of the Wine Occurrence over distances of up to 4.8 km.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NiCAN Identifies New Mineralized Zones at its Wine Nickel Property, Manitoba, Canada

NiCAN Identifies New Mineralized Zones at its Wine Nickel Property, Manitoba, Canada

NiCan Limited ("NiCAN" or the "Company") (TSXV: NICN) has intersected multiple new zones of nickel–bearing mineralization to the east of the known high-grade nickel-copper ("Ni–Cu") Wine Occurrence during its Phase II drill program on the Wine Nickel Property in Manitoba, Canada (Figure 5). These new zones of mineralization significantly expand the exploration target area.

Highlights:
  • New nickel bearing mineralized zones identified within the Wine Gabbro.
  • Initial interpretation suggests that these new mineralized zones may occupy a specific horizon within the central region of the Wine Gabbro. Geophysical anomalies (VTEM conductors) can be traced for several kilometers to the northeast and southwest along this trend.
  • Geophysical and geochemical surveys as well as diamond drilling are planned for the third quarter of 2023.

Brad Humphrey , President, and CEO of NiCAN, stated, "We are very happy with the results of the Wine Phase II drill program and the intersection of the new mineralized nickel bearing zones. Importantly, these new occurrences of disseminated and massive sulphides suggest the Wine Gabbro hosts multiple mineralized pods like those seen in the Lynn Lake area. Interpretive work indicates that there are several horizons within the Wine Gabbro that require testing with geophysics, geochemistry, and subsequent diamond drilling. NiCAN remains in a strong position with a solid balance sheet and highly prospective nickel sulphide projects in established mining jurisdictions."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NiCAN Receives $300,000 Grant from Manitoba Mineral Development Fund

NiCAN Receives $300,000 Grant from Manitoba Mineral Development Fund

NiCan Limited ("NiCAN" or the "Company") (TSXV: NICN) has received approval for a $300,000 grant from the Manitoba Mineral Development Fund (the "MMDF") to support NiCAN's exploration activities at its Wine Project located in the Snow Lake Flin Flon area, Manitoba, Canada . The Company has received the first $150,000 of the grant, with the remainder expected in June 2023.

Nican Logo (CNW Group/Nican Ltd.)

"NiCAN greatly appreciates the support from the Manitoba Mineral Development Fund and the Manitoba Chambers of Commerce," Brad Humphrey , President and CEO of NiCAN commented. "This funding is earmarked for continued exploration at the Wine Project, which has returned truly impressive drill results to date. We look forward to announcing additional exploration results from the Wine Gabbro area in the coming weeks. The Company also plans to complete geophysical and geochemical surveys that will drive the exploration program for our next phase of drilling in this area."

The MMDF is a $20-million provincial fund, launched in July 2020 by the Manitoba Government and administered by the Manitoba Chambers of Commerce. This fund is specifically dedicated to providing funding for and supporting economic development and mining projects in northern Manitoba .

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol "NICN" on the TSX-V. The Company is actively exploring two nickel projects , both located in the well-established mining jurisdiction of Manitoba, Canada .

To receive news releases by e-mail, please register using the NiCAN website at   www.nicanltd.com.

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain "forward-looking information" under applicable securities laws concerning the proposed financing, business, operations and financial performance and condition of NiCan Limited. Forward-looking information includes, but is not limited to, the quantum of the grant; the timing for receipt of the balance of the grant; intended use of proceeds; drilling and other exploration potential; costs; and permitting. Forward-looking information may be characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or delays. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Nican Ltd.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/June2023/01/c1569.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NiCAN Expands the Wine Occurrence at the Wine Project, Manitoba, Canada Multiple Zones Intersected Including 1.91% NiEq over 23.5 Meters

NiCAN Expands the Wine Occurrence at the Wine Project, Manitoba, Canada Multiple Zones Intersected Including 1.91% NiEq over 23.5 Meters

NiCan Limited ("NiCAN" or the "Company") (TSXV: NICN) is pleased to announce that its 2023 winter drilling program on the Wine Property located in the Snow Lake area, Manitoba, Canada (Figure 2) has expanded several mineralized zones at the Wine Occurrence.

Highlights:
  • Diamond drill hole Wine 23-16 intersected four zones of mineralization including 12.6 meters at 1.52% Ni and 2.01% Cu (1.93% NiEq), from 48.3 to 60.9 meters (Table 1).
  • Diamond drill hole Wine 23-17 intersected three zones of mineralization including 23.5 meters at 1.59% Ni and 1.76% Cu, (1.91% NiEq), from 18.6 to 42.1 meters (Table 1, Figure 1).

Note: Nickel equivalent grades include nickel and copper values only and assume recoveries of 85% for nickel and 85% for copper based on comparable deposits. Nickel price: US$10.00 /lb; copper price US$3.75 /lb.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Blackstone Minerals

Accelerated Non-Renounceable Entitlement Offer Results

Blackstone Minerals Limited (ASX: BSX) (“Blackstone” or the “Company”) advises that the Company has completed its Accelerated Non-Renounceable Entitlement Offer as per the terms of the Prospectus dated 4 November 2024 (“Entitlement Offer”). As announced on 6 November 2024, the institutional component of the Entitlement Offer was completed raising approximately $550k from Nanjia Capital Limited and its controlled entities.

Keep reading...Show less
FPX Nickel (TSXV:FPX)

FPX Nickel


Keep reading...Show less
Nickel bars.

Nickel Price Update: Q3 2024 in Review

Nickel saw solid price momentum in the first half of the year, benefiting from investor sentiment and speculation across commodity markets that saw surge in prices for both precious and base metals.

However, price highs were short-lived as nickel supply and demand fundamentals provided pressures that saw steep declines.

Among the influences has been a supply of laterite nickel flooding the market out of Indonesia, which is a contributing factor to mine curtailments in New Caledonia, Australia, and Europe. Meanwhile, high demand for battery production in China has yet to reach levels to make up for the oversupply in the market.

Keep reading...Show less
Blackstone Minerals

Blackstone Completes Institutional Component of Entitlement Offer

Blackstone Minerals Limited (“Blackstone” or the “Company”) is pleased to announce that it has completed the institutional component (“Institutional Entitlement Offer” or “Institutional Offer”) of its partially underwritten accelerated non-renounceable pro rata entitlement offer as announced on 4 November 2024 (“Entitlement Offer” or “Offer”).

Keep reading...Show less
Blackstone Minerals

Launch of $4M Accelerated Partially Underwritten Entitlement Offer

Blackstone Minerals Limited (“Blackstone” or the “Company”) is pleased to announce that it is undertaking a partially underwritten accelerated non-renounceable pro rata entitlement offer of new fully paid ordinary shares in the Company (“Shares”) on the basis of one (1) new Share (“New Shares”) for every four (4) existing Shares held, to raise up to approximately A$4 million (before costs) (“Entitlement Offer” or “Offer”).

Keep reading...Show less

Latest Press Releases

Related News

×