Altiplano Commences Underground Drill Program at Farellon

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce it has commenced a significant underground drill program at its Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile.

The Company's recently purchased diamond drill rig (See News release dated April 4, 2012) has arrived on site in preparation of a 6,000 m underground drilling campaign at Farellon. This program is designed to assist with grade control within the mineralized zones and provide guidance for further underground advancement of the Hugo Decline. Exploration drilling to the southwest will test for continuity of the vein within the concession package beyond the intrusive dyke structure where opportunity exists to expand the underground workings and recover additional copper-gold and iron oxide material.

The drilling stations will be established underground at three positions inside the historical Laura vein system decline located approximately 250 m south of Farellon (Figure 1). This location will provide the opportunity to optimize drilling efficiencies to reach the Farellon vein at greater depth. The work is expected to outline an exploration target of over 60,000 tonnes of copper-gold and iron oxide mineralization. At a rate of 5,000 tonnes per month, this would be sufficient to provide an additional year of extraction. The work will also help with advanced stope design as the Company pushes to increase the height between mining levels to increase efficiency.

CEO Alastair McIntyre comments, "By drill testing the vein at depth, this provides greater confidence on the continuation of the vein structure and assists with mine planning and grade control optimization." McIntyre further comments, "The acquisition of the drill rig provides us with great flexibility to obtain quality geological information at Farellon but also provides us the opportunity to quickly mobilize the unit and drill test Maria Luisa and other projects that we have under review."

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4303/90015_a22d544714d0f980_001.jpg

Figure 1: Farellon underground development and proposed drill plan

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/90015_a22d544714d0f980_001full.jpg

About Altiplano
Altiplano Metals Inc. (TSX: APN) is a Canadian mining company focused on the acquisition and development of near-term cash flowing assets and exploration projects of significant scale. Altiplano's goal is to grow into a mid-tier producer of copper, gold and silver with immediate plans of generating profits from three cash flowing projects in 2021. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value.

John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed and approved the technical contents of this document. 

Altiplano is part of the Metals Group of companies, managed by an award-winning team of professionals who stand for technical excellence, painstaking project selection and uncompromising corporate governance, with a proven ability to capitalize on investment opportunities and deliver shareholder returns.

ON BEHALF OF THE BOARD

/s/ "John Williamson"
Chairman

For further information, please contact:
Alastair McIntyre, CEO
alastairm@apnmetals.com
Tel: (416) 434 3799

Jeremy Yaseniuk, Director
jeremyy@apnmetals.com
Tel: (604) 773-1467

 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. The Farellon mine was previously in production dating back to the 1970's with a reported historical production (to a depth of 70 m) yielding approximately 300,000 tonnes at an average grade of 2.5% copper and 0.5g/t gold. This material was processed locally and sold to ENAMI. Altiplano is relying upon past production records, underground sampling and related activities and current diamond drilling to estimate grade and widths of the mineralization to reactivate production. The decision to commence production on the Farellon deposit is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with any production decision. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/90015

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Altiplano Metals

Altiplano Metals

Altiplano Metals Inc. (APN: TSX-V) is a Canadian mineral development company focused on acquiring projects with significant potential for advancement from discovery through to production. Altiplano’s goal is to grow into a mid-tier mining company through developing a portfolio of near-by production and cash flowing assets focusing on copper, gold and silver. Management has a …

Altiplano Metals Inc. (APN: TSX-V) is a Canadian mineral development company focused on acquiring projects with significant potential for advancement from discovery through to production. Altiplano’s goal is to grow into a mid-tier mining company through developing a portfolio of near-by production and cash flowing assets focusing on copper, gold and silver. Management has a … Keep Reading...
Five bronze cylinders of varying heights stand on a reflective surface against an orange background.

Mirae Asset Launches Hong Kong's First Copper ETF

Mirae Asset Global Investments launched Hong Kong's first copper mining exchange-traded fund on Tuesday (September 15).The Global X Copper Miners ETF began trading on the Stock Exchange of Hong Kong under the stock codes 3014 and 9014. The fund debuted at an issue price of US$1 per share with a... Keep Reading...
Map closeup of Ontario with a red pin marking Albany.

Generation Mining's Billion-Dollar Marathon Mine Now Fully Funded

Toronto-based Generation Mining (TSX:GENM,OTCQB:GENMF) has secured C$340 million in final financing to complete a C$1.3 billion capital package for its Marathon copper-palladium project in Northwestern Ontario.The final funding package relies on C$190 million in federal anchor commitments,... Keep Reading...
BHEM Defines Copper Conductors and Drill Targets at Chester

BHEM Defines Copper Conductors and Drill Targets at Chester

Raptor Metals Ltd (ASX: RAP) (“Raptor” or “the Company”) is pleased to report the results from a borehole electromagnetic (BHEM) survey completed across twelve diamond drill holes at its 100%-owned Chester Copper Project in the Bathurst Mining Camp, New Brunswick, Canada. HIGHLIGHTS Borehole... Keep Reading...
Copper bars with weight stamps, stock market chart background.

What Was the Highest Price for Copper?

Strong demand in the face of looming supply shortages has pushed copper to new heights in recent years.With a wide range of applications in nearly every sector, copper is by far the most industrious of the base metals. In fact, for decades, the copper price has been a key indicator of global... Keep Reading...
Man in a suit gestures around a holographic financial chart with upward arrow.

Copper Stocks Surge as Prices Keep Climbing

Copper prices have risen significantly over the past year, reaching record levels this month. From September 2025 to September 2026, US copper prices have risen more than 50 percent, while London Metal Exchange (LME) prices have jumped by 48 percent. Although the gains have moderated since the... Keep Reading...

Interactive Chart

Latest Press Releases

Related News