TSXV:SYH

Skyharbour Signs Option Agreement with Black Shield Metals Corp to Option 75% of the Mann Lake Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQB: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company") is pleased to announce that it has entered into an option agreement (the "Option Agreement") with Black Shield Metals Corp. (CSE: BDX) ("Black Shield") which provides Black Shield an earn-in option to acquire up to a 75% interest (the "Option") in the Mann Lake Uranium Project ("Mann Lake" or the "Property") located in the Athabasca Basin, Northern Saskatchewan, Canada.

Mann Lake Project Location Map:
https://skyharbourltd.com/_resources/SYH_Mann_Lake_Tenure.jpg

Under the Option Agreement, Black Shield will contribute cash and exploration expenditure consideration totaling CAD $4,850,000 over a three-year period ("Project Consideration"). Of the Project Consideration, $850,000 will be in cash payments to Skyharbour and $4,000,000 will be in exploration expenditures on the project. Black Shield will also issue to Skyharbour the equivalent value of CAD $1,750,000 in shares of the company over the three-year earn-in period to complete the earn-in.

Skyharbour's President and CEO, Jordan Trimble commented: "We are excited to have this Option Agreement signed as we continue to execute on our business model by adding value to our project base in the Athabasca Basin through strategic partnerships and prospect generation, as well as focused mineral exploration at our flagship Moore Uranium Project. We are looking forward to working with Black Shield and its management team as they advance the Mann Lake Project over the coming years. News will be forthcoming on exploration plans as we continue to see an upward momentum in the uranium market."

Mann Lake Uranium Project Summary:

Skyharbour owns a 100% interest in the 3,473 hectare (8,582 acre) Mann Lake Uranium Project located in the eastern Athabasca Basin in northern Saskatchewan. It is strategically located 25 km southwest of the McArthur River Mine, the largest high-grade uranium deposit in the world, and 15 km to the northeast of Cameco's Millennium uranium deposit. The Mann Lake project is also adjacent to the Mann Lake Joint Venture operated by Cameco (52.5%) with partners Denison Mines (30%) and Orano (17.5%).Denison Mines acquired International Enexco and its 30% interest in the project after a 2014 winter drill program discovered high-grade, basement-hosted uranium mineralization at this adjacent project.

Skyharbour carried out a ground-based EM survey in 2014 focused on an area where a 2 km long aeromagnetic low coincided with basement conductors interpreted from earlier EM surveys. This program successfully confirmed the presence of a broad, NE-SW trending corridor of conductive basement rocks which are likely graphitic metapelites.

Mann Lake Project Geological Compilation Map:
https://skyharbourltd.com/_resources/SYH_Mann_Lake_Compilation.jpg

The Mann Lake Uranium Project has seen over $3 million of previous exploration expenditures consisting of geophysical surveys and two diamond drill programs totaling 5,400 metres carried out by Triex in 2006 and 2008. The geophysical surveys identified graphitic basement conductors and structural corridors containing reactivated basement faults. These features trend onto the adjacent ground operated by Cameco. The 2006 diamond drill program intersected a 4.5 metre wide zone containing anomalous boron (with highlight values of up to 1,758 ppm B) in the sandstone immediately above the unconformity in drillhole MN06-005. Boron enrichment is common at the McArthur River uranium mine, and along with illite and chlorite alteration, is a key pathfinder element for uranium deposits in the Athabasca Basin. In the same drill hole, altered basement gneissic rocks with abundant clay, chlorite, hematite and calc-silicate minerals were intersected about 7.6 metres below the unconformity and contained anomalous uranium, including up to 73.6 ppm over a 1.5 metre interval. Background uranium values are commonly between 1 and 5 ppm.

Terms of the Option Agreement:

Under the terms of the Option Agreement, the Black Shield Metals Corp. is committed to the following:

  1. paying to Skyharbour a total of CAD $850,000 cash and issuing Skyharbour the total number of common shares ("Shares") of Black Shield equivalent to a value of CAD $1,750,000 based on the 20 day VWAP at the time of issuance, as follows:

    1. within five days of the signing of the Option Agreement, pay $100,000 and issue Shares equivalent to $250,000 at the 20 day VWAP at the time of issuance;
    2. on the first anniversary of the signing of the Option Agreement, pay $250,000 and issue Shares equivalent to $500,000 at the 20 day VWAP at the time of issuance;
    3. on the second anniversary of the signing of the Option Agreement, pay $250,000 and issue Shares equivalent to $500,000 at the 20 day VWAP at the time of issuance;
    4. on the third anniversary of the signing of the Option Agreement, pay $250,000 and issue Shares equivalent to $500,000 at the 20 day VWAP at the time of issuance;
  2. incur a minimum of $4,000,000 in exploration expenditures on the Property as follows:

    1. $1,000,000 in exploration expenditures on or before the first anniversary of the signing of the Option Agreement;
    2. an additional $1,000,000 in exploration expenditures on or before the second anniversary of the signing of the Option Agreement; and
    3. an additional $2,000,000 in exploration expenditures on or before the third anniversary of the signing of the Option Agreement.

In the event that Black Shield spends, in any of the above periods, less than the specified sum, it may pay to the Optionor the difference between the amount it actually spent and the specified sum before the expiry of that period in full satisfaction of the exploration expenditures to be incurred. In the event that Black Shield spends, in any period, more than the specified sum, the excess shall be carried forward and applied to the exploration expenditures to be incurred in succeeding periods.

Immediately on Black Shield satisfying all of the conditions, Black Shield will be deemed to have exercised the Option and to have earned a 75% interest in and to the Property which will vest to Black Shield subject to the net smelter returns royalty ("NSR Royalty"). A NSR Royalty of two and a half percent (2.5%) is payable to a third party of net smelter returns from minerals mined and removed from the Property (payable pro-rata based on ownership interest in the Property).

The issuance of the Black Shield shares is subject to approval by the board of directors of Black Shield and the Canadian Securities Exchange. All securities issued pursuant to this offering will be subject to a four-month plus one-day hold period from the issuance date. Black Shield may pay finder's fees and/or commissions to eligible persons in connection with the Option in accordance with applicable securities laws and the policies of the Canadian Securities Exchange.

Qualified Person:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by Richard Kusmirski, P.Geo., M.Sc., Skyharbour's Head Technical Advisor and a Director, as well as a Qualified Person.

About Black Shield Metals Corp.

Black Shield Metals Corp. is a Canadian junior exploration company focused on diversified mineral resources. Black Shield is proposing to change its name to Basin Uranium Corp. and its trading symbol, and will provide additional updates when approval has been received.

About Skyharbour Resources Ltd.:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with six drill-ready projects covering over 250,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project which is located 15 kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced stage uranium exploration property with high grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U 3 O 8 over 5.9 metres including 20.8% U 3 O 8 over 1.5 metres at a vertical depth of 265 metres. The Company is actively advancing the project through drill programs.

Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a 51% interest in the project through exploration expenditures and cash payments. Skyharbour now owns a 24.5% interest in the Project. Skyharbour also has a joint-venture with Azincourt Energy at the East Preston Project whereby Azincourt has earned a 70% interest in the project through exploration expenditures, cash payments and share issuance. Skyharbour now owns a 15% interest in the Project. Preston and East Preston are large, geologically prospective properties proximal to Fission Uranium's Triple R deposit as well as NexGen Energy's Arrow deposit.

The Company also owns a 100% interest in the South Falcon Point Uranium Project on the eastern perimeter of the Basin, which contains a NI 43-101 inferred resource totaling 7.0 million pounds of U 3 O 8 at 0.03% and 5.3 million pounds of ThO 2 at 0.023%. Skyharbour has signed a Definitive Agreement with ASX-listed Valor Resources on the Hook Lake (previously North Falcon Point) Uranium Project whereby Valor can earn-in 80% of the project through $3,500,000 in total exploration expenditures, $475,000 in total cash payments over three years and an initial share issuance.

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour's Uranium Project Map in the Athabasca Basin:
https://skyharbourltd.com/_resources/maps/SYH-Athabasca-Map.jpg

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company's website at www.skyharbourltd.com .

Skyharbour Resources Ltd.

"Jordan Trimble"
_________________________________
Jordan Trimble
President and CEO

For further information contact myself or:
Riley Trimble
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

Skyharbour Resources

Skyharbour Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Skyharbour Resources (TSXV:SYH)

Skyharbour Resources


Keep reading...Show less
Baselode to Begin Bear Uranium Project Drill Program and Updates on Catharsis

Baselode to Begin Bear Uranium Project Drill Program and Updates on Catharsis

  • 1,500 metre inaugural Bear drill program scheduled to start in coming weeks
  • Catharsis drill program is complete, with results to be released when assays received

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to provide updates for its Bear ("Bear") and Catharsis ("Catharsis") uranium projects in the Athabasca Basin area, northern Saskatchewan (see Figure 1).

"This is an exciting time as we begin our inaugural drill exploration program on Bear. The geology looks compelling, with an apparent regional structure hosting uranium mineralization already being identified with historic drilling and overlapping geophysical gravity low anomalies associated with bends in EM conductors. A discovery at Bear would be fortuitous as it is located about 30 kilometres south of the Key Lake uranium mill, and 10 kilometres east of the Key Lake haul road.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Imperial to hold 2024 First Quarter Earnings Call

(TSE: IMO, NYSE American: IMO) Brad Corson, chairman, president and chief executive officer, and Peter Shaw, vice-president, investor relations, Imperial Oil Limited, will host a 2024 First Quarter Earnings Call on Friday, April 26, following the company's first quarter earnings release that morning. The event begins at 9 a.m. MT and will be accessible by webcast.

During the call, Mr. Corson will offer brief remarks prior to taking questions from Imperial's covering analysts.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

PrairieSky Royalty Announces Conference Call for Q1 2024 Results

PrairieSky will release its Q1 2024 results on Monday, April 22, 2024 after markets close. The news release detailing PrairieSky's Q1 2024 results will provide operating and financial information. Financial statements along with management's discussion and analysis will be available on PrairieSky's website at www.prairiesky.com and on SEDAR+ at www.sedarplus.com .

A conference call to discuss the results will be held for the investment community on Tuesday, April 23, 2023 beginning at 6:30 am MT (8:30 am ET). To participate in the conference call, you are asked to register at the link provided below. Details regarding the call will be provided to you upon registration.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the completion of its winter drill program at the Hook Lake Joint Venture at the Carter Corridor. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and lies on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"This year's drill program ended with a discovery of 0.9 metres of 0.29% U3O8, including 0.3 metres of 0.68% U3O8, associated with a major structure intersected by hole CRT24-10," said Scott Frostad, Vice President Exploration at Purepoint. "Encouragingly, the basement hosted uranium mineralization is within an altered breccia matrix that borders a 10 metre wide graphitic shear. All the 2024 holes intersected anomalous radioactivity and the results continue to show the extensive 20-kilometre conductive structural zone known as the Carter Corridor remains highly prospective for an economic uranium discovery."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHB F ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has commenced a comprehensive 2024 field campaign at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program will include a ground electromagnetic survey (ML-TEM), a ground gravity survey, and a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF) "Blue Sky" or the "Company") is pleased to announce that the Company has filed the NI 43-101 Technical Report (the "Report") supporting disclosure of the independent Preliminary Economic Assessment(" PEA") for the Ivana Deposit at the Company's 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province Argentina as reported on February 22 nd 2024 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Skyharbour Resources

Skyharbour Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×