Lode Gold Launches Exploration Program at One of the Largest Land Packages in New Brunswick

Lode Gold Launches Exploration Program at One of the Largest Land Packages in New Brunswick

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: SBMIF) ("Lode Gold" or the "Company") is pleased to announce that a Heliborne HeliTEM² Survey over the Riley Brook and McIntyre Brook properties, in northern New Brunswick, has been initiated as part of the recently announced Acadian Gold Joint Venture with Fancamp Exploration Ltd. (refer to Figure 1). The properties encompass a combined 419 km2 land package of mineral claims, constituting gold mineralized zones that extend over several kilometres, on trend with Puma Exploration's Williams Brook property.

The recent combination of mineral assets between Fancamp and Lode Gold Resources Inc. into a dominant land holding of high-quality, underexplored ground in New Brunswick, was a major development which now aims to be further validated by this high-resolution heliborne electro-magnetic and radiometric survey.

This joint initiative with Fancamp occurs in a highly prospective geologic domain for gold and polymetallic discovery, within the Appalachian Gold Corridor that hosts other Au-focused projects such as New Found Gold's Queensway Project and Calibre's Valentine Lake Project.

Highlights

  • Direct Detection Abilities: The HeliTEM² survey effectively identifies electrically conductive sulphide-rich veins and sulphide-rich alteration halos in the area.

  • Target Vectorization: By integrating magnetic and radiometric data, this survey enables the team to accurately map the structures and distinctive alteration halos linked to gold mineralization, such as sericite and K-feldspar.

  • Large and Detailed Survey Area: The survey will cover both properties for a total of 419 km² and consists of 3,163 line-kilometres of data which will be acquired over both properties in a grid pattern with 150-metre spacing between each flight lines.

  • Accelerated Drilling Timeline: By generating fast-tracked targets, this survey significantly reduces exploration timelines, enabling the joint venture to advance towards a drilling phase more efficiently.

The helicopter-borne geophysical survey consists of magnetic, electromagnetic and radiometric measurements using the Xcalibur Smart Mapping HeliTEM² system, which has a low noise receiver with a square transmitter waveform to provide rapid current turn-off to enhance sensitivity to near surface features. The survey will guide the Company field efforts in the coming months.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4064/227037_1460945a4438ca8a_004.jpg

Figure 1: Compilation map of Riley Brook and McIntyre Brook properties and associated results.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4064/227037_1460945a4438ca8a_004full.jpg

Fancamp, as Acadian Gold's operator, has identified several areas of interest based on its internal compilation of geochemical, geophysical and geological data from previous operators. To further investigate these areas, the HeliTEM² survey will provide high-resolution data that accurately directs the Company toward mineralized zones. The high-resolution magnetic survey will be used to improve geological identification of primary and secondary geological structures, which may control different mineralization styles on the properties, and to identify radiometric anomalies, often associated with alteration patterns and felsic rocks, potentially associated with Rocky Mill fault systems.

New Brunswick, Acadian Gold Joint Venture: A joint initiative between Fancamp Exploration Ltd. and Lode Gold Resources Inc. for the advancement and exploration of one of the most considerable land packages in New Brunswick, within a highly prospective region for gold and polymetallic discovery, would position both firms as key players of an emerging, district-scale, Au-Cu exploration play (refer to press release dated August 27, 2024). Leveraging Fancamp's recently acquired 309 km2 package of mineral claims, the Riley Brook property, combined with Lode Gold's 111 km2 McIntyre Brook holdings (refer to Figure 1), the Acadian Gold joint venture will be able to advance exploration initiatives across a dominant land package in an underexplored sector in proximity to other gold-focused firms such as Puma Exploration.

QUALIFIED PERSON STATEMENT

The technical information contained in this press release was reviewed and approved by FranƧois Auclair, P.Geo, M.Sc. Vice President Exploration of Fancamp Exploration Ltd., designated as a Qualified Person under National Instrument 43-101. M Auclair, the Fancamp's qualified person and an officer of Fancamp Exploration Ltd. has reviewed and approved the technical disclosure contained in this news release.

ABOUT LODE GOLD

Lode Gold (TSXV: LOD) is an exploration and development company with projects in highly prospective and safe mining jurisdictions in Canada and the United States.

Our Golden Culvert and WIN Projects in the Yukon, covering 99.5 km2, are situated in the southern portion of the Tombstone Gold Belt. This 1,500 km long belt is dominated by RIRGS and sediment hosted gold deposits, including Fort Knox, Brewery Creek, Keno Hill (Silver), Dublin Gulch, Hecla and Snowline's Gold's recent world class, Valley discovery. The company has intersected gold mineralization on the Golden Culvert property, with a best result of 33.1 m @ 12.53 g/t from one of our drill holes and has identified a gold bearing sheeted vein system (RIRGS) on the WIN property.

In New Brunswick, within the emerging Appalachian/ Iapetus gold belt, Lode Gold has formed a strategic Joint Venture with Fancamp called Acadian Gold together we form one of the largest land packages in New Brunswick with 420 km2 of exploration rights between McIntyre Brook and Riley Brook projects. Jointly focused on the Wapske Formation a geological unit identified to have the best gold potential in particular where there are structures bounding felsic units. With 36km strike of the Wapske formation under control Acadian is a key and leading member of this play.

Our 111 km2, McIntyre Brook Project, is surrounded by Puma Exploration's Williams Brook Project (where their Lynx project has reported 5.55 g/t Au over 50m)1 The first 2 drill holes completed by Lode Gold intersected (one hole intersected 5.73 g/t gold over 2.0 m within a broader low-grade interval averaging 1.20 g/t gold over 20 m), further drilling is warranted. Fancamp's 309 km2 Riley Brook project covers 25 km strike of Wapske formation containing numerous mapped felsic units. Previous exploration efforts were directed at VMS-style mineralization focused on the base metals often not assaying for gold - Acadian is the first to focus on gold.

NI 43-101 reports on our New Brunswick and Yukon projects are available on SEDAR+ and on our website.

The Company is also advancing its Fremont Gold development project in the historic Mother Lode Gold Belt of California where 50,000,000 oz of gold has been produced. Fremont, located 500km north of Equinox Gold's Castle Mountain and Mesquite mines, has a Preliminary Economic Assessment(" PEA") with an after-tax NPV (5%) of USD $217M, a 21% IRR, 11-year LOM, averaging 118,000 Oz per annum at USD $1,750 gold. A sensitivity to the March 31, 2023 PEA at USD $2,000/oz gold gives an after-tax NPV (5%) of USD $370M and a 31% IRR over an 11-year LOM. The project hosts an NI 43-101 resource of 1.16 MOz at 1.90 g/t Au within 19.0 MT Indicated and 2.02 MOz at 2.22 g/t Au within 28.3 MT Inferred. The MRE evaluates only 1.4 km of the 4 km strike length of the Fremont property which features five gold-mineralized zones. Significantly, three step-out holes at depth hit the mineralized structure, typical of orogenic deposits that often occur at depth. Fremont is located on 3,351 acres of 100% owned private land in Mariposa, the original gold rush county, and is 1.5 hours from Fresno, California.

The property has year-round road access and is close to airports and rail. A planned V-TEM airborne geophysical survey to be flown over both properties.

Please refer to the Fremont Gold project NI 43-101 PEA technical report dated March 31, 2023, which is available on the Company's profile on SEDAR+ (www.sedarplus.ca) and on the Company's website (www.lode-gold.com). The PEA technical report has been reviewed and approved by independent "Qualified Persons" Eugene Puritch, P.Eng., FEC, CET, and Andrew Bradfield, P.Eng. both of P&E, and Travis Manning, P.E. of KCA.

ON BEHALF OF THE COMPANY

Wendy T. Chan, CEO & Director

Information Contact

Winfield Ding
CFO
info@lode-gold.com
+1-416-320-4388

Kevin Shum
Investor Relations
kevin@lode-gold.com
+1 (647) 725-3888 ext. 702

Cautionary Note Related to this News Release and Figures

This news release contains information about adjacent properties on which the Company has no right to explore or mine. Readers are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company's properties.

Cautionary Statement Regarding Forward-Looking Information

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

All statements, trend analysis and other information contained in this press release about anticipated future events or results constitute forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions. All statements, other than statements of historical fact, included herein, including, without limitation, statements regarding the anticipated use of proceeds from the Special Warrant financing, additional proceeds from the exercise of the warrants underlying the Special Warrants, and the receipt of final acceptance from the TSX Venture Exchange with respect to the transactions, are forward-looking statements. Although Lode Gold believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements since Lode Gold can give no assurance that such expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other factors identified in Lode Gold's periodic filings with Canadian securities regulators, and assumptions made with regard to: the ability of Lode Gold to obtain final acceptance from the TSX Venture Exchange with respect to the transactions; that the Company will be able to use the proceeds of the Special Warrant financing as anticipated; and the ability of the Company to continue with its stated business objectives and its ability to obtain required approvals and raise additional capital to proceed. Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements. Important factors that could cause actual results to differ materially from expectations include risks associated with the business of Lode Gold and Fancamp; risks related to the Company's ability to obtain final acceptance from the TSX Venture Exchange with respect to the transactions; the risk that the use of proceeds from the Special Warrant financing may differ from management's expectations; and other risk factors as detailed from time to time and additional risks identified in the Companies' filings with Canadian securities regulators on SEDAR+ in Canada (available at www.sedarplus.ca). Forward-looking statements are based on estimates and opinions of management at the date the statements are made. The Company does not undertake any obligation to update forward-looking statements except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/227037

News Provided by Newsfile via QuoteMedia

LOD:CC
Lode Gold Resources

Lode Gold Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Lode Gold Resources (TSXV:LOD)

Lode Gold Resources


Keep reading...Show less

Discovering the next orogenic/reduced intrusive deposit in Yukon and New Brunswick

Lode Gold Closes Financing - $790,186 to Advance California and Yukon Projects

Lode Gold Closes Financing - $790,186 to Advance California and Yukon Projects

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce that it has closed on its first tranche of its non-brokered private placement offering. The Company has raised $790,186 through the issuance of 4,389,922 Units at a price of $0.18 per Unit. The cash raised will be used for the execution of the 2025 business plan and general working capital. In Yukon, the Company will conduct field work, including geological mapping, soil sampling, and channel sampling to advance drill target development. In California, the funds will support the completion of a 2025 Preliminary Economic Assessment( PEA) focused on bulk mining, underground channel sampling to upgrade resources, and moving towards the pre-feasibility study (PFS) at the Fremont project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Shareholders Approve Plan of Arrangement for Spin Out of Gold Orogen

Lode Gold Shareholders Approve Plan of Arrangement for Spin Out of Gold Orogen

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce that the proposed plan of arrangement (the "Arrangement") for the tax-efficient spin out of Gold Orogen was approved at the Company's annual general and special meeting of shareholders (the "Meeting") held on March 10, 2025.

The resolution approving the Arrangement (the "Arrangement Resolution") was required to be passed by: (i) the affirmative vote of at least two-thirds (66 2/3%) of the votes cast by shareholders of the Company present in person or represented by proxy and entitled to vote at the Meeting; and (ii) the affirmative vote of at least two-thirds (66 2/3%) of the votes cast by Company shareholders, optionholders and warrantholders, voting as a single class, present in person or represented by proxy and entitled to vote at the Meeting.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Strengthens Board of Spin Co Gold Orogen Ahead of Tax-Efficient Spin-out

Lode Gold Strengthens Board of Spin Co Gold Orogen Ahead of Tax-Efficient Spin-out

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce the proposed appointment of Bill Fisher and Rajesh Sharma to the Board of Directors of its upcoming spin-out company, Gold Orogen. The spin-out is scheduled for March 2025, with a shareholder meeting set for March 10, 2025, to approve the tax-efficient plan of arrangement.

The proposed appointments of Bill, Rajesh and the other Directors will be subject to shareholder approval at the Company's Annual General Meeting (AGM) on March 10, 2025. Their appointments will be finalized following the AGM.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Updates Resources: Over 1 Moz Au, 4 g/t with 16.8 M Average True Width

Lode Gold Updates Resources: Over 1 Moz Au, 4 g/t with 16.8 M Average True Width

Initiates Internal Scoping Study to Optimize Underground Mining

Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce the positive results of its new 2025 Mineral Resource Estimation ("MRE") at its Fremont Gold project (the "Project") in Mariposa County, California: 1.198 Moz 1 at 3.97 gt* of Recoverable Gold (1.297 Moz at 4.37 gt Content Gold)2 at a 3 gt cut-off with an average true width of 16.8 m.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold's Upcoming Spin Co, Gold Orogen, Defines 2025 New Brunswick Exploration Targets; Reports Gold-in-Soil and EM Anomalies Identifying Highly Prospective Mineralized Systems at McIntyre Brook

Lode Gold's Upcoming Spin Co, Gold Orogen, Defines 2025 New Brunswick Exploration Targets; Reports Gold-in-Soil and EM Anomalies Identifying Highly Prospective Mineralized Systems at McIntyre Brook

Ā Lode Gold Resources Inc. (TSXV: LOD) (OTCQB: LODFF) ("Lode Gold" or the "Company") is pleased to announce 2025 exploration targets for its Phase 1 exploration program in its subsidiary, Gold Orogen, which will be spun out as a separate public company in March 2025, pending Exchange and Shareholder approval. The Annual Shareholder Meeting is set for March 10, 2025. Shareholders of Lode Gold as of the Record Date will be eligible to receive shares of the new Spin Co (Gold Orogen). This tax-efficient spin-out is to ensure maximum return on investment for shareholders.

Gold Orogen has formed a JV-Co, Acadian Gold, with Fancamp, creating one of the largest land packages on the Iapetus Suture Belt in New Brunswick. This potential district-scale play covers 445 km². Atlantic Canada, especially New Brunswick, equipped with excellent infrastructure and geopolitics, is under-explored yet highly prospective for both gold and polymetallic minerals. In recent months, majors such as Kinross, Equinox Gold and others have strategically made advancements in the area.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Freegold Reports Final 2024 Drilling Results from Golden Summit Continuing to Confirm Higher Grade Potential

Freegold Reports Final 2024 Drilling Results from Golden Summit Continuing to Confirm Higher Grade Potential

  • WOW ZONE – GS2437

    • 6.84 g/t Au over 20.6 m including 115.5 g/t over 0.8m
    • 43.8 g/t Au over 3.0m

GS2435

    • 1.01 g/t over 216 m
    • 20.4 g/t over 1.3 m

GS2431

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Blackrock Drills 4.2m of 700 g/t AgEq  and Reports Multiple +1 kg/t AgEq Intercepts at Tonopah West

Blackrock Drills 4.2m of 700 g/t AgEq and Reports Multiple +1 kg/t AgEq Intercepts at Tonopah West

M&I Conversion Program Drilling Continues to Expand and Confirm Continuity of High-Grade Gold and Silver Mineralization in the Shallowest Portion of the M&I Conversion Area

HIGHLIGHTS:

  • TXC25-138 returned multiple broad zones of high-grade silver and gold mineralization spanning from 230.4 metres to 241.86 metres down hole, including:
    • 4.24 metres grading 700 grams per tonne (g/t) silver equivalent (AgEq) (Ag/Au ratio 90:1) (378.5 g/t silver (Ag) and 3.57 g/t gold (Au)) from 230 metres down hole, including 0.31 metres grading 3,182 g/t AgEq (1,805.0 g/t Ag and 15.27 g/t Au); and
    • 5.18 metres grading 556 gt/ AgEq (328.2 g/t Ag and 2.53 g/t Au) from 236.68 metres, which included intervals of 3,340 g/t AgEq (1,987 g/t Ag and15.0 g/t Au) over 0.31 metres and 1,714 g/t AgEq (1,037.0 g/t Ag and 7.51 g/t Au) over 0.61 metres respectively.
  • There are ten drillholes with pending assays from the M&I Conversion Program, and seven drillholes are pending assays from the Resource Expansion program.
  • Modelling of the M&I Conversion Program drillholes is now underway, with an updated mineral resource estimate on track for Q3, 2025.

Blackrock Silver Corp. (TSXV: BRC) (OTCQX: BKRRF) (FSE: AHZ0) ("Blackrock" or the "Company") announces additional high-grade silver and gold drill intercepts from the M&I Conversion Program (as defined herein) at its 100% owned Tonopah West project ("Tonopah West") located in Nye and Esmeralda Counties, Nevada, United States.

The Company is currently in the process of completing its in-fill drilling program at Tonopah West which commenced in mid-July 2024 and consists of 62 drillholes within the shallow southern portion of the Bermuda-Merten vein group ("DPB South") resource area (the "M&I Conversion Area") with a goal to convert up to 1.0-million tonnes of material from inferred mineral resources to measured and indicated mineral resources (the "M&I Conversion Program"). The M&I Conversion Area represents the initial years of production based on the mine plan laid out in the Company's Preliminary Economic Assessment on Tonopah West (see September 4, 2024 news release).

Andrew Pollard, the Company's President and Chief Executive Officer, stated: "Additional results from our M&I Conversion Program continue to validate our model, supporting mineral continuity as we track and define the geometry of the high-grade shoots within the vein system. Today's results, coupled with results previously announced from this same program, highlight that broader intercepts are associated with higher-than-average grades which should be beneficial in delineating high-grade tonnes. The broad zones of high-grade mineralization encountered in drillhole TXC-138 are a standout for us, as at a composite of 11.46 metres of 514 g/t AgEq (290 g/t Ag & 2.48 g/t Au), this is thickest (composite) zone we've drilled throughout the district outside of the historic Victor mine. As we await the final assays from the M&I Conversion Program, modelling has begun for our upcoming mineral resource update on Tonopah West, currently on track for Q3, 2025."

Table 1: Tonopah West Assay Intercepts using 150 g/t AgEq cut off

Drillhole
ID
Hole TypeProgramFrom
(m)
To (m)Drill
Interval
(m)
Ag g/tAu g/tAgEq g/t
TXC25-125RC/CoreM&I Conversion327.97329.311.34118.211.336238.73
Including328.27328.580.31432.004.900874.03
TXC25-126RC/CoreM&I Conversion319.61320.220.61247.802.554478.20
Including319.92320.220.31421.004.380816.12
TXC25-127RC/CoreM&I Conversion230.22230.730.5266.140.964153.10
TXC25-128RC/CoreM&I Conversion300.81302.211.40244.832.070431.56
TXC25-128RC/CoreM&I Conversion348.14348.750.61300.503.030573.84
TXC25-128RC/CoreM&I Conversion427.76428.460.70129.001.360251.69
TXC25-129RC/CoreM&I Conversion307.24308.150.91155.501.322274.76
TXC25-129RC/CoreM&I Conversion323.27323.880.6165.101.140167.94
TXC25-129RC/CoreM&I Conversion344.94345.550.61237.002.520464.33
TXC25-131RC/CoreM&I Conversion319.19319.800.61292.742.480516.46
Including319.49319.800.31584.004.9401,029.64
TXC25-132RC/CoreM&I Conversion437.60438.520.92125.811.804288.55
TXC25-138RC/CoreM&I Conversion213.30213.820.52111.000.945196.25
TXC25-138RC/CoreM&I Conversion230.40234.644.24378.523.572700.75
Including232.72233.020.311,805.0015.2673,182.24
TXC25-138RC/CoreM&I Conversion236.68241.865.18328.232.528556.28
Including238.35238.660.311,987.0015.0003,340.15
Including240.03240.640.611,037.007.5101,714.48
TXC25-140RC/CoreM&I Conversion295.96296.510.5578.091.180184.54
TXC25-140RC/CoreM&I Conversion358.14358.840.7077.310.989166.53
TXC25-140RC/CoreM&I Conversion362.90363.810.91335.633.803678.70
Including362.90363.200.30371.004.310759.81
TXC25-140RC/CoreM&I Conversion378.11380.091.9895.981.215205.59
Including379.05380.091.04136.491.787297.70
AgEq = Ag + Au*(Factor); where Factor = (Au Price/Ag Price)*(Au Recovery/Ag Recovery or
Factor=($1900/$23)*(95%/87%)=90.21; True thickness is 90 to 100% of interval thickness based on the modelled
vein geometries; Cut-off grade is 150 gpt AgEq; Reverse Circulation (RC)/Core = RC pre-collar with core tail.

As is evident from Table 1, the highest-grade results are associated with thicker intercepts of quartz vein material. This is similar to previous results seen from the M&I Conversion Program where broader intercepts were encountered, such as: TXC24-095 which returned 5.03 metres of 774.5 g/t AgEq (461.5 g/t Ag and 3.47 g/t Au),1 TXC24-119 which returned 4.69 metres of 714 g/t AgEq (379.0 g/t Ag and 3.72 g/t Au),2 and TXC24-122 which cut 5.21 metres of 563 g/t AgEq (3.02 g/t Au and 292 g/t Ag)3 .This combination of high grade and thickness should have a positive impact on the proposed development of the M&I Conversion Area and the scheduled mineral resource update. Modelling of the M&I Conversion Program drillholes has started and an updated mineral resource estimate on Tonopah West is currently scheduled for Q3 2025.

The geometry of the high-grade silver and gold is sizable with high-grade shoots plunging to the northwest within the M&I Conversion Area. These shoots are open to the northwest, east and open down plunge. TXC25-138 shows high-grade shoots have thicker vein intercepts along the axis of the shoot and multiple high-grade intercepts are being returned under the M&I Conversion Program. Allowing for the 3 metres of internal waste, TXC25-138 would have a drill interval of 11.46 metres grading 290.2 g/t Ag and 2.48 g/t Au or 514.3 g/t AgEq. The thickness of this mineralized shoot is approaching those seen in the historic mining at the Victor and Ohio mines where the Victor vein area was 24 metres thick and the Ohio vein area was 15 metres thick4.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_001.jpg

Figure 1: Tonopah West project showing NI43-101 resource location and expansion potential

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_001full.jpg

Drillholes TXC25-133, -134, -135, and TXC25-136 returned silver and gold assays below the cutoff grade for Table 1. The drillholes returned silver equivalent grades ranging between 100 and 144 g/t AgEq with silver values ranging between 6 to 71 g/t and gold values between 0.51 and 1.34 g/t. There are ten drillholes (TXC25-137, -139, -141, -142, and TXC25-146 to -TXC25-151) with pending assays from the M&I Conversion Program. In addition, seven drillholes are pending assays from the Company's exploration drill program that is targeting expansion potential across a one kilometre trend of vein corridor linking the Denver-Paymaster and Bermuda-Merten vein groups and the Northwest step out resource area at Tonopah West (the "Resource Expansion Program") (see February 24, 2025 news release).

Figure 2 is a plan map showing the location of all the drillholes in the M&I Conversion Program and highlighting those reported in this news release.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_002.jpg

Figure 2: Drillhole location map of the M&I Conversion Program showing drillholes reported in this news release.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/676/251267_df9b5b7fb4827b2a_002full.jpg

Table 2: Tonopah West Drillhole Location Coordinates (based on GPS readings in the field, Datum UTM, NAD 1927, Zone 11)

Hole IDAreaTypeUTM_NAD27 EastUTM_NAD27 NorthElevation
(m)
Depth
(ft)
Depth
(m)
AzimuthDip
TXC25-125DPB SouthRC/Core477803.704213416.771772.861177.0358.7180-55
TXC25-126DPB SouthRC/Core477804.024213508.861767.741377.0419.7180-55
TXC25-127DPB SouthRC/Core477777.734213417.951771.991002.0305.4180-62
TXC25-128DPB SouthRC/Core477748.864213697.901767.221559.0475.2180-55
TXC25-129DPB SouthRC/Core477792.344213590.241769.091398.0426.1180-60
TXC25-130DPB SouthRC/Core477813.054213696.501768.971332.0406.0180-55
TXC25-131DPB SouthRC/Core477774.724213512.621767.171312.0399.9180-60
TXC25-132DPB SouthRC/Core477738.294213429.151768.791532.0467.0180-55
TXC25-133DPB SouthRC/Core478534.924213166.731803.791160.0353.6180-67
TXC25-134DPB SouthRC/Core478382.374213223.621798.881256.5383.0180-69
TXC25-135DPB SouthRC/Core478196.914213351.051782.351002.0305.4180-58
TXC25-136DPB SouthRC/Core477845.604213690.571770.441470.0448.1180-72
TXC25-137DPB SouthRC/Core477930.704213330.781776.321028.0313.3180-62
TXC25-138DPB SouthRC/Core477930.704213330.041776.491050.0320.0180-51
TXC25-139DPB SouthRC/Core477980.654213246.521778.411061.0323.4180-67
TXC25-140DPB SouthRC/Core477834.094213503.161768.961646.0501.7180-65

Quality Assurance/ Quality Control

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The RC and core samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded on to American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company's instructions.

The RC samples are lined out at the lab and logged in to AAL's system. The core samples are cut using core saws and personnel at AAL's facility in Sparks, Nevada according to the Company's instructions delivered with each core hole.

All samples are dried, crushed to 85% passing 10 mesh (2mm) and a 250-gram sub-sample split is collected and pulverized to 200 mesh (74 micron) in a ring and puck pulverizer. Then the pulverized material is digested and analyzed for gold using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP analysis (ICP-5AM48). Over limits for gold and silver are determined using a gravimetric finish (GRAVAU30 and GRAVAG30). Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified reference material approximately every 15th to 20th sample.

Qualified Persons

Blackrock's exploration activities at Tonopah West are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Howald has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration and development company driven to add shareholder value. Anchored by a seasoned Board of Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

Additional information on Blackrock Silver Corp. can be found on its website at www.blackrocksilver.com and by reviewing its profile on SEDAR at www.sedarplus.ca.

Cautionary Note Regarding Forward-Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking statements") within the meaning of Canadian and United States securities legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, are forward-looking statements. Forward-Looking statements in this news release relate to, among other things: the Company's strategic plans; the timing of completion of the Company's drill programs at Tonopah West and the anticipated objectives and results therefrom; the incorporation of the results from the M&I Conversion Program in an updated mineral resource estimate on Tonopah West and the anticipated timing of release thereof; the Company's de-risking initiatives at Tonopah West; estimates of mineral resource quantities and qualities; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones.

These forward-looking statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; the historical basis for current estimates of potential quantities and grades of target zones; the availability of skilled labour and no labour related disruptions at any of the Company's operations; no unplanned delays or interruptions in scheduled activities; all necessary permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for operations; and the Company's ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements contained in this news release and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; general market and industry conditions; and those factors identified under the caption "Risks Factors" in the Company's most recent Annual Information Form.

Forward-Looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For Further Information, Contact:

Andrew Pollard
President and Chief Executive Officer
(604) 817-6044
info@blackrocksilver.com

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Element79 Provides Corporate Update

Element79 Provides Corporate Update

(TheNewswire)

Element79 Gold Corp.

V ANCOUVER, BC T heNewswire May 7, 2025 Element79 Gold Corp. (CSE: ELEM) (OTC: ELMGF) (FSE: 7YS) ("Element79", or the "Company") provides the following updates on multiple corporate initiatives underway:

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Quimbaya Gold and Denarius Metals Partner to Formalize Artisanal Mining at Tahami Project, Strengthening Long-Term Exploration Strategy

Quimbaya Gold and Denarius Metals Partner to Formalize Artisanal Mining at Tahami Project, Strengthening Long-Term Exploration Strategy

Partnership with Leading Colombian Mining Group to Formalize Artisanal Mining Production and Accelerate Exploration

Quimbaya Gold Inc. (CSE: QIM) (OTCQB: QIMGF) (FSE: K05) ("Quimbaya Gold" or the "Company") is pleased to announce the signing of a binding Letter of Intent with Denarius Metals Corp. (Cboe CA: DMET) (OTCQX: DNRSF), establishing a 50:50 joint venture aimed at formalizing existing small-scale mining operations located within the Company's Tahami Project, located in the Segovia Gold District of Antioquia, Colombia.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Denarius Metals Announces Binding Letter of Intent with Quimbaya Gold for a 50/50 Joint Venture to Exploit the Tahami Project in the Segovia Gold District of Colombia

Denarius Metals Announces Binding Letter of Intent with Quimbaya Gold for a 50/50 Joint Venture to Exploit the Tahami Project in the Segovia Gold District of Colombia

Denarius Metals Corp. (Cboe CA: DMET) (OTCQX: DNRSF) ("Denarius Metals" or the "Company") announced today that it has signed a binding Letter of Intent with Quimbaya Gold Inc. ("Quimbaya") (CSE: QIM) (OTCQB: QIMGF) (FSE: K05) establishing a 5050 joint venture aimed at formalizing existing small-scale mining operations located within Quimbaya's Tahami Project which is located in the Segovia Gold District of Antioquia, Colombia, adjacent to the high-grade Segovia Operations owned by Aris Mining Corporation ("Aris Mining").

Serafino Iacono, Executive Chairman of Denarius Metals, commented, "We see this joint venture with Quimbaya as an opportunity to leverage our team's considerable experience in exploration, mining and community relations in Colombia, particularly in the Segovia Gold District where we founded Gran Colombia Gold (now Aris Mining) and built the Segovia Operations into the largest underground gold producer in Colombia and one of the highest-grade underground gold producers globally. We are excited about the opportunity to develop near-term production and cash flow through the implementation of a formalized artisanal mining operation in partnership with Quimbaya and the local community."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Riverside Resources and Questcorp Mining Execute Definitive Option Agreement for La Union Project, Sonora, Mexico

Riverside Resources and Questcorp Mining Execute Definitive Option Agreement for La Union Project, Sonora, Mexico

Riverside Resources Inc. (TSXV: RRI) (OTCQB: RVSDF) (FSE: 5YY) ("Riverside" or the "Company"), is pleased to announce that further to its press release dated September 6, 2024, Riverside's wholly-owned subsidiary, RRM Exploracion, S.A.P.I. DE C.V. (the "Vendor") has entered into a definitive option agreement (the "Option Agreement") with Questcorp Mining Inc. ("Questcorp") dated May 5, 2025, for the 2,520.2 hectare La Union carbonate replacement gold- polymetallic project (the "Project" or "La Union") located in Sonora, Mexico (the "Transaction").

"We are thrilled to finalize this agreement for the La Union Project, which is a strong asset in Riverside's portfolio. Securing up to C$5,500,000 in exploration funding from Questcorp is an excellent step forward in advancing this larger Carbonate Replacement Deposit ("CRD") project," said John-Mark Staude, CEO of Riverside Resources. "Riverside is pleased to have the updated NI 43-101 Technical Report completed and we see an active exploration program launching in the coming weeks with Riverside as the Operator of the exploration program. Riverside is expected to become a shareholder of Questcorp with an initial 9.9% equity interest, subject to final approval by the Canadian Securities Exchange or confirmation that such approval is not required. The first-year work program of C$1,000,000 in exploration expenditures will launch the first round of exploration at the project."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lode Gold Resources

Lode Gold Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

Ɨ