Fabled Copper Report up to 1.47% Copper on the Ram Creek Copper Occurrence

Fabled Copper Report up to 1.47% Copper on the Ram Creek Copper Occurrence

Fabled Copper Corp. ("Fabled Copper" or the "Company") (CSE:FABL)(FSE:XZ7) announces the 13th set of results of 2021 surface field work on it's Muskwa Copper Project comprised of the Neil Property and the Toro Property in Northern British Columbia. The Company also holds rights to the Bronson Property. See Figure 1 below

Figure 1 - Location Map

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

Peter Hawley, President, CEO reports; A total of 19 specific areas were mapped and prospected during the 2021 field season plus 5 select areas for UAV drone surveys. See Figure 2 below.

Figure 2 - 2021 Neil Property Work Site Locations

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

A total of 19 specific areas were mapped and prospected during the 2021 field season and we started the New Year by reporting our findings on the Lady Luck occurrence in the south end of the Neil Property, followed by the Mac; the 8A, Harris, the 2a and 2b, the Creek, Keays south, Belcher Creek, Magnum Drone Survey Mission, the Magnum, Neil Drone Survey Mission, Neil vein / breccia, EM-1 and now the Ram Creek copper occurrence. See Figure 3 below.

Figure 3- Neil Property, Ram Creek Copper Occurrence Location

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

Ram Creek Occurrence

The area containing the Ram Creek Occurrence had ten chip samples and 1 example of mineralized quart-carbonate collected. See Table 1 and Figure 4 below.

Figure 4 - Ram Creek Sample Locations

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

Two quartz-carbonate veins and surrounding sheared stockwork outcrop on the north side of a ridge

at the 1,800 meter elevation and located on the south side of a bowl. See Photo 1 below.

Photo 1 - Ram Creek Copper Occurrence

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

These 2 veins were chip sampled across 2.65 meters. The chip samples contained less than 2% sulphides and this section (samples D-723006 - 010) across 2.65 meters assayed low in copper (0.15%), with the best copper result of 0.74% copper across 0.40 meters, (sample D-723007). See Table 1 and Photo 2 below.

Photo 2 - Chip Sample Location of Ram Creek Copper Occurrence Over 2.65 meters

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

North of these two veins, numerous sheared northwest to northwest striking quartz-carbonate

veins, containing little or no sulphide content, were observed at elevations of approximately 1,800 meters.

Five veins were chip sampled and copper analyses indicate they contained trace copper (

Photo 3 - Chip Sample Site of Ram Creek Copper Occurrence

Fabled Copper Corp., Wednesday, April 20, 2022, Press release picture

Sample D-723016 of quartz-carbonate float, mineralized with 4% chalcopyrite, was collected across the bowl, 120 meters north of the exposed vein on the ridge. This sample had a copper content of 1.47%.

Table 1 - Ram Creek Surface Samples

Sample Number

Elevation

(meters)

Sample

Type

Width

(meters)

Copper

%

Composite

(copper % avg x meters)

D - 723006

1,801

Chip

0.30

0.11

0.15 / 2.65

D - 723007

1,801

Chip

0.40

0.74

0.15 / 2.65

D - 723008

1,799

Chip

0.60

0.09

0.15 / 2.65

D - 723009

1,800

Chip

1.20

0.01

0.15 / 2.65

D - 723010

1,802

Chip

0.15

0.01

0.15 / 2.65

D - 723011

1,801

Chip

0.25

0.50

D - 723012

Chip

0.75

0.09

D - 723013

1,802

Chip

0.75

0.00

D - 723014

1,795

Chip

1.00

0.01

D - 723015

1,809

Chip

1.00

0.00

D - 723016

Float

1.47

QA QC Procedure

Analytical results of sampling reported by Fabled Copper Corp represent rock samples submitted by Fabled Copper Corp staff directly to ALS Chemex, Vancouver, British Columbia Canada. Samples were crushed, split, and pulverized as per ALS Chemex method PREP-31, then analyzed for ME-ICP61 33 element package by four acid digestion with ICP-AES Finish. ME-GRA21 method for Au and Ag by fire assay and gravimetric finish, 30g nominal sample weight.

Over Limit Methods

For samples triggering precious metal over-limit thresholds of 10 g/t Au or 100 g/t Ag, the following is being used:

Au-GRA21 Au by fire assay and gravimetric finish with 30 g sample.

Ag-GRA21 Ag by fire assay and gravimetric finish.

Fabled Copper Corp. monitors QA/QC using commercially sourced standards and locally sourced blank materials inserted within the sample sequence at regular intervals.

About Fabled Copper Corp.

Fabled Copper is a junior mining exploration company. Its current focus is to creating value for stakeholders through the exploration and development of its existing copper properties located in northern British Columbia. The Muskwa Project comprises a total of 76 claims in two non-contiguous blocks and totals approximately 8,064.9 hectares, located in the Liard Mining Division in northern British Columbia.

Mr. Peter J. Hawley, President and C.E.O.
Fabled Copper Corp.
Phone: (819) 316-0919
peter@fabledcopper.org

For further information please contact:

info@fabledcopper.org

The technical information contained in this news release has been approved by Peter J. Hawley, P.Geo. President and C.E.O. of Fabled, who is a Qualified Person as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

The Canadian Securities Exchange does not accept responsibility for the adequacy or accuracy of this release.

Certain statements contained in this news release constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains any required regulatory approvals.

Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Some of the risks and other factors that could cause results to differ materially from those expressed in the forward-looking statements include, but are not limited to: impacts from the coronavirus or other epidemics, general economic conditions in Canada, the United States and globally; industry conditions, including fluctuations in commodity prices; governmental regulation of the mining industry, including environmental regulation; geological, technical and drilling problems; unanticipated operating events; competition for and/or inability to retain drilling rigs and other services; the availability of capital on acceptable terms; the need to obtain required approvals from regulatory authorities; stock market volatility; volatility in market prices for commodities; liabilities inherent in mining operations; changes in tax laws and incentive programs relating to the mining industry; as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

SOURCE: Fabled Copper Corp.



View source version on accesswire.com:
https://www.accesswire.com/698108/Fabled-Copper-Report-up-to-147-Copper-on-the-Ram-Creek-Copper-Occurrence

News Provided by ACCESSWIRE via QuoteMedia

FABL:CC
The Conversation (0)
Fabled Copper Receives Drill Permit and Outlines Proposed 2024 Drill Program on Davis Keays Eagle Vein

Fabled Copper Receives Drill Permit and Outlines Proposed 2024 Drill Program on Davis Keays Eagle Vein

Fabled Copper Corp. ("Fabled Copper" or the "Company") (CNSX:FABL)(FRA:XZ7) announces that it has received its Mines Act Permit which entitles the Company to drill from 15 drill stations over a period of 2 years on the Muskwa Copper Project

The Muskwa Project is comprised of the Neil Property, the Toro Property and the Bronson Property located in northern British Columbia. The Neil Property area was granted the drilling permit and in particular the Davis Keays Eagle Vein area is the Company's first priority interest. See Figure 1 below.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
FABLED COPPER Samples Three Road Side Lithium Bearing Pegmatite Outcrops on Volt 1 Property, Quebec

FABLED COPPER Samples Three Road Side Lithium Bearing Pegmatite Outcrops on Volt 1 Property, Quebec

Fabled Copper Corp. (" Fabled " or the " Company ") (CSE:FABL; FSE:XZ7) is pleased to announce the first Phase sampling program on the Volt 1 Property in Quebec

The VOLT 1 Property is comprised of 9 contiguous cells with a total size of 504 hectares. The VOLT 2 Property is comprised of 2 contiguous cells nearby with a total size of 112 hectares. Both properties are located due east of the village of Miquelon, Quebec and are surrounded by Mosaic Minerals Corp.'s (CSE: MOC) "Lithium SM Project."

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Fabled Copper Outlines 8 km by 2 km Pegmatite Boulder Field With Pegmatite Outcropping in Central Portion of OHM Property, Quebec

Fabled Copper Outlines 8 km by 2 km Pegmatite Boulder Field With Pegmatite Outcropping in Central Portion of OHM Property, Quebec

Fabled Copper Corp. ("Fabled" or the "Company") (CSE:FABL)(FSE:XZ7) is pleased to announce the results of the first phase sampling program on the OHM Property (the "Property

The OHM Property consists of 51 contiguous cells comprising of 2,856 hectares located approximately 70 kms south of Val D'Or. The OHM Property can be easily accessed from the main highway, route 117 and forestry roads 43 and 44 with numerous secondary cutting roads. It is estimated that 80% of the Property has been logged thus outcrop visibility is excellent.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Fabled Copper Closes Debt Settlement and Terminates Proposed Acquisition of the TJ Property

Fabled Copper Closes Debt Settlement and Terminates Proposed Acquisition of the TJ Property

(TheNewswire)

Fabled Copper Corp.

Vancouver, British Columbia TheNewswire August 18, 2023 - Fabled Copper Corp. (" Fabled " or the " Company ") (CSE:FABL ) ; ( FSE:XZ7) announces that it closed, on August 10, 2023, its previously announced debt settlement pursuant to which the Company settled an aggregate amount of C$30,000 in outstanding debt (the " Debt Settlement ") in exchange for the issuance of 375,000 units at a price of C$0.08 per unit (each a " Unit ").

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Fabled Copper Agrees Debt Settlement

Fabled Copper Agrees Debt Settlement

Fabled Copper Corp. ("Fabled" or the "Company") (CSE:FABL)(FSE:XZ7) announces that it proposes to enter into a debt settlement agreement with a consultant, pursuant to which the Company will agree to settle an aggregate amount of C$30,000 in outstanding debt (the "Debt Settlement") in exchange for the issuance of 375,000 units at a price of C$0.08 per unit (each a "Unit

Each Unit will consist of one common share (each a "Common Share") and one common share purchase warrant (each a "Warrant"). Each Warrant entitles the holder thereof to acquire one Common Share at the price of $0.12 per share for a period of 24 months from closing.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Los Andes Copper (TSXV:LA)

Los Andes Copper


Keep reading...Show less
Questcorp Mining (CSE:QQQ)

Questcorp Mining

Keep reading...Show less
Forte Minerals (CSE: CUAU)

Forte Minerals Corp. Closes Oversubscribed Private Placement Offering

Forte Minerals Corp. (Forte” or the “Company) (CSE: CUAU) (OTCQB: FOMNF) (Frankfurt: 2OA), a copper-gold exploration company focused on Peru, has successfully closed its oversubscribed non-brokered private placement, raising gross proceeds of C$2,690,000.

A C$2.4 million financing was initially announced on May 23, 2025. It was met with high investor demand, resulting in the issuance of 6,725,000 units at a price of C$0.40 per unit, and within the right of increase reserved by the Company.

Keep reading...Show less
Electric Royalties (TSXV:ELEC)

Electric Royalties Announces CFO Transition

Electric Royalties Ltd. (TSXV:ELEC)(OTCQB:ELECF) ("Electric Royalties" or the "Company") is pleased to announce the appointment of Robert Scott as Chief Financial Officer. Mr. Scott is replacing Luqman Khan, who has departed the Company to pursue other opportunities.

Mr. Scott, a CPA, CA, and CFA, brings more than 25 years of professional experience in accounting, corporate finance, compliance and banking, and has served on the management teams and boards of a select number of Canadian publicly traded companies. Throughout his career, Mr. Scott has helped raise more than $200 million in equity financing and developed extensive experience in IPOs, reverse takeovers, mergers and acquisitions, and corporate restructuring. He is a founder and President of Corex Management Inc. ("Corex"), which provides professional services to privately held and publicly traded companies. Mr. Scott has significant public company experience, including senior management and board positions with a number of TSX Venture Exchange issuers including Capitan Silver Corp., K2 Gold Corporation, Riverside Resources Inc., Great Bear Resources Ltd. and First Helium Inc.

Keep reading...Show less
CoTec Holdings (TSXV:CTH)

Hypromag Achieves Further Technical Milestones as Piloting Ramps Up in Advance of Commercial Rare Earth Magnet Production in The Uk, Germany and USA

Mkango Resources Ltd. (AIM:MKA)(TSX-V:MKA) ("Mkango") and CoTec Holdings Corp. (TSXV:CTH)(OTCQB:CTHCF) ("CoTec") are pleased to provide a technical update for HyProMag Limited ("HyProMag") and its ongoing advanced pilot programme for the scale-up and roll out of Hydrogen Processing of Magnet Scrap ("HPMS") technology to produce domestically sourced and short-loop recycled rare earth magnets with a minimal carbon footprint in the UK (2025), Germany (2025) and United States (2027).

The ongoing advanced pilot programme at the University of Birmingham is proceeding in parallel with development of the commercial scale plant at Tyseley Energy Park in Birmingham, UK.

Keep reading...Show less

Latest Press Releases

Related News

×