March 14, 2024
Elixir Energy Limited (“Elixir” or the “Company”) is pleased to provide an operations update on its 100% owned Grandis and Nomgon projects located in Queensland and Mongolia respectively.
HIGHLIGHTS
- Coiled tubing unit cleaning out Daydream-2 wellbore in preparation for DFITs
- Significant stimulation and testing program at Grandis on track for April through to June
- Nomgon Pilot Project continues reservoir de-pressurisation process
Grandis Project
A coiled tubing unit has recently been mobilised and is currently cleaning out the Daydream-2 cased wellbore.

This cleanout is a pre-cursor to the Diagnostic Formation Integrity Test (DFIT) program which will follow shortly thereafter. The results of this DFIT program will then be used to optimize the subsequent stimulation and flow testing phases of Daydream-2, which will run from April through to around June.
The detailed design of the stimulation and testing program has now been finalized, with a total of 6 zones to be stimulated. These zones cover ~47 metres of pay out a total of 245 metres (being the final sandstone net pay of 180 metres and coals of 65 metres) recorded in the Daydream 2 wellbore (19% of the total net interval). The sandstone net pay advised to the market on 14 December 2023 of 154 metres has been revised upwards following an external independent expert review.
The zones selected represent a cross-section of permeable sands, tight sands and coals. The total zones being tested in Daydream-2 are guided by the key principle of maximizing useful data acquisition from an appraisal well – that would then inform how future development wells would be designed.
In such future development wells, much greater pay would likely be stimulated and flowed. The results from the stimulation program in Daydream-2 will guide the targeting of further zones in future wells and can be extrapolated over the entire gas prone intervals.
The stimulation program, to be conducted by global leading contractor Halliburton, will be followed by a series of flow tests in May and June.
Nomgon Project
In conjunction with this intense program in Queensland, operations also continue at the Nomgon Pilot Project in Mongolia. In Mongolia, the current key objective is to continue to de-pressurise the gas- bearing coal reservoir through the ongoing pumping of water therefrom.
Recently one of the pilot wells, Nomgon-10, was worked over, with a larger downhole pump installed. Increased water rates have already been observed. Elixir’s engineers are actively managing the Pilot Plant to maximise water production and therefore accelerate the time to reach desorption pressure. Data analysis from the Nomgon field indicates that steady progress is being made in reducing the reservoir pressure required to reach the gas desorption pressure.
Click here for the full ASX Release
This article includes content from Elixir Energy, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
EXR:AU
The Conversation (0)
02 May 2024
Elixir Energy
Early-mover in natural gas exploration and appraisal in Australia and Mongolia.
Early-mover in natural gas exploration and appraisal in Australia and Mongolia. Keep Reading...
3h
Oil Prices Near US$120 as Global Supply Fears Grow
Oil markets staged another dramatic rally over the past 24 hours (March 18–19), as escalating geopolitical tensions in the Middle East sent both benchmark crude prices sharply higher before pulling back on profit taking and policy speculation.Brent crude surged to an intraday high near US$119... Keep Reading...
17 March
QIMC Reports Results from Hole 1 DDH-26-01 at West-Advocate Natural Hydrogen Project, Nova Scotia; R2G2(TM) Exploration Model Applied
R2G2(TM) Exploration Model Applied to the 300-km Cobequid-Chedabucto Structural Corridor
Discovery Highlights — West-Advocate Natural Hydrogen ProjectHole 1 DDH-26-01 completed as part of QIMC's five-hole 2026 drilling programR2G2™ exploration model applied to drill targeting within the Cobequid-Chedabucto structural corridor - trademark filedScientific commentary by Prof. Marc... Keep Reading...
16 March
Oil Spikes, Gold Hesitates: Markets React to Strait of Hormuz Risk
Prices for gold and oil have moved sharply in recent weeks as escalating geopolitical tensions in the Middle East inject fresh volatility into the global commodities space. Crude prices have surged in recent weeks after disruptions to shipping through the Strait of Hormuz, the narrow maritime... Keep Reading...
16 March
SURGE ENERGY INC. CONFIRMS APRIL 2026 DIVIDEND
Surge Energy Inc. ("Surge" or the "Company") (TSX: SGY,OTC:ZPTAF) confirms that a cash dividend to be paid on April 15, 2026, in respect of March 2026 production, for the shareholders of record on March 31, 2026, will be $0.043333 per share.The dividend is an eligible dividend for the purposes... Keep Reading...
13 March
Top 5 Canadian Mining Stocks This Week: First Atlas Gains 105 Percent
Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian news impacting the resource sector.Statistics Canada released February’s Labor Force Survey on Friday (March 13). The data showed that... Keep Reading...
13 March
Vitesse Energy Announces Hedging Update and Board Member Transition
Vitesse Energy, Inc. (NYSE: VTS) ("Vitesse" or the "Company") today announced a hedging update related to opportunistic additional hedges through 2027 at price levels that support its dividend, along with the transition of M. Bruce Chernoff from Vitesse's Board of Directors (the "Vitesse... Keep Reading...
Latest News
Interactive Chart
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00