Engineer Gold Mines Completes 2026 Drill Core Sampling at TAG

Engineer Gold Mines Completes 2026 Drill Core Sampling at TAG

(TheNewswire)

Engineer Gold Mines Ltd.
 

November 3, 2026 TheNewswire - Vancouver, BC, Canada Engineer Gold Mines Ltd. (the "Company") (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ ) is pleased to announce that it has now completed the 2026 infill diamond drill core sampling program at the TAG Property, part of its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia.

538 infill diamond drill core samples, totalling 685 metres from 20 holes, were selected for this initial sampling phase.  Samples are being shipped to MSA Labs in Prince George, BC for analyses for Au-AG by photon assaying, plus multi-element ICP.  Continued sampling in 2027 will be contingent upon results from this initial phase.  The compiled drilling data will then be modelled in order to generate diamond drill targets for 2027 designed to facilitate the completion of a resource estimate at TAG.

From 2006 to 2008, CZM Capital Corp. diamond drilled 69 holes at TAG, totalling 11,524 metres along a prominent 6 km gold-silver bearing structure named the 025FZ ((Fekete and Simper (2009), Fekete and Skinner (2007); ARIS reports #30931 and #29581) (see News Release dated August 25, 2026).

Earlier in 2026, the Company completed a review of the historical diamond drilling results and  deemed the project to have merit for continued exploration including infill drill core sampling.  Several of the key intersections have gaps within or adjacent where no samples were taken, although the rock units are lithologically the same with similar quartz veining and stringers as seen in the sampled intervals.

The QP has reviewed all the available drill logs, sample intervals, assay certificates from assessment reports and company files, as well as examining the drill core stored on site.  Although the QP cannot verify the historic information, the programs were carried out in a professional manner using standard industry practices and are deemed to be reliable to guide future exploration work at TAG.  

Linda Dandy, P.Geo. is an Independent Qualified Person as defined by National Instrument 43- 101 and has reviewed and approved the technical content in this news release.

   

About Engineer Gold Mines Ltd.

The Engineer Gold Project encompasses approximately 18,319 hectares in northwestern British Columbia and is subdivided into three principal target areas: the Engineer Gold Mine, the TAG Property, and the Wann River prospect.

ENGINEER GOLD MINE

The historic Engineer Gold Mine is a past-producing, underground gold-silver operation.  Historical production between 1910 and 1952 totalled approximately 14,263 tonnes grading 39.4 g/t (1.15 oz/ton) gold and 19.5 g/t (0.57 oz/ton) silver (BC Minfile 104M014).

In 2011, an historical Inferred Mineral Resource as defined under National Instrument 43-101, including only the Engineer and Double Decker veins, was completed (Snowden, 2011, amended and restated in 2018, O'Brien et al - www.sedarplus.ca).  The historical resource, based on a 5.0 g/t gold cut-off, gave an inferred 25,000 ounces of gold at a grade of 19 g/t.  The historical mineral resource was calculated using mining industry standard practices and is deemed to be reliable and relevant in that it demonstrates the mineral potential of the property.  This estimate was based on the following method and parameters: (1) VLP (long section) approach with projection of mineralized shoots down-dip and along strike based on surface exposure and/or underground development; (2) The global grade applied to each vein structure is based on a probabilistic approach, with grades assigned to domains from historical production figures; (3) All grades were diluted to minimum stoping width of 1 m; and (4) A density factor of 2.8 t/m3 was used which is believed to be conservative.

A Qualified Person has not done sufficient work to make the resource current and Engineer Gold Mines is not treating the estimate as current.  The historical estimate is provided for information purposes only and should not be relied upon.  The historical estimate uses the categories set out in section 1.2 of the NI-43-101.  A thorough review of all historic data performed by an independent QP, along with additional exploration work, including diamond drilling, is required to confirm results and to produce a current mineral resource estimate. 

TAG PROPERTY

The TAG Property is located approximately 6 kilometres north of the historic Engineer Mine and is associated with a 6km long structurally controlled mineralized system related to  splays off of the Llewellyn Fault.  The majority of the diamond drilling to date has concentrated on the southern 2 km section of the structure.  Significant historical diamond drill intervals from TAG include:  Hole TAG06-23 which assayed 1.7 g/t Au and 5.1 g/t Ag over 26.7 m (including 3.52 g/t Au over 4.7 m); hole TAG07-29 which assayed 1.3 g/t Au and 5.9 g/t Ag over 35.0 m; TAG08-51 which assayed 1.8 g/t Au and 7.4 g/t Ag over 24.3 m; and TAG08-59 which assayed 1.5 g/t Au and 8.05 g/t Ag over 42.1 m (Fekete and Simper (2009), Fekete and Skinner (2007); ARIS reports #30931 and #29581).  

 

WANN RIVER PROSPECT

The Wann River prospect is located 4 kilometres south of the Engineer Mine and represents a highly prospective, underexplored target.  Exploration work to date has identified a mineralized corridor approximately 800 metres by 180 metres in extent.  While mineralization at the Engineer Mine and TAG Property is characteristic of epithermal-style systems, the Wann River prospect represents an orogenic gold target associated with the prolific Llewellyn Fault and has returned significant gold and silver values, including a quartz grab sample of 263 g/t gold and 1,350 g/t silver from the Lum showing (Aspinall (2011); ARIS Report #32004).

Historic diamond drilling of 17 holes in 2011 returned numerous gold and silver intercepts.  The most significant intervals were from hole WR030211 which assayed 11.3 g/t Au and 76.2 g/t Ag over 1 m, and hole WR040111 assaying 11.3 g/t Au and 94.8 g/t Ag over 1.0 m (Aspinall, 2011; BC ARIS Report #32478).  In addition to prior drilling, Wann River has undergone several surface sampling programs which returned good gold-silver and base metal values.

 

On Behalf of the Board of Directors

"Spiro Kletas"

Spiro Kletas

CEO, President & Director

 

For further information please contact:

Engineer Gold Mines Ltd.

Tel:  +1 604-669-6463

E-Mail: spiro@engineergoldmines.com

Website: engineergoldmines.com

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) has reviewed this news release and does not accept responsibility for the adequacy or accuracy of its contents.

Disclaimer for Forward-Looking Information

This news release contains "forward-looking statements" or "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable securities laws. These statements are not statements of historical fact and may include, without limitation, statements regarding the Company's beliefs, plans, expectations, intentions, objectives, strategies, future performance, and anticipated events or results.

Forward-looking statements are based on management's current expectations, estimates, and assumptions, which are subject to change and may ultimately prove to be inaccurate. Such statements involve known and unknown risks, uncertainties, and other factors that could cause actual results, performance, or achievements to differ materially from those expressed or implied in the forward-looking statements.

There is no assurance that the anticipated events or outcomes described in these forward-looking statements will occur, or, if they do occur, what benefits Engineer Gold Mines will derive from them. Factors that could cause actual results to differ materially include, but are not limited to, exploration results, the availability of financing, fluctuations in commodity prices, permitting and regulatory risks, operational risks, and other risks detailed in the Company's public disclosure record.

Forward-looking statements contained in this release are made as of the date hereof, and Engineer Gold Mines assumes no obligation to update or revise them to reflect new information, future events, or otherwise, except as required by applicable securities laws. Readers are cautioned not to place undue reliance on forward-looking statements.

  

Copyright (c) 2026 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

EAU:CC
The Conversation (0)
Three towering gold bars stand on a chart backdrop with numbers and graphs, text reads: 95426, 8599, 756.8.

Gold Majors’ Q3 Free Cash Flow Falls as Spending and Costs Rise

Major gold producers ended the third quarter with less free cash flow than in Q2 as heavier capital spending and higher costs absorbed cash, even as gold edged higher.The LBMA gold price hit its quarterly low of US$3,978.55 per ounce on July 1, then climbed to a high of US$4,663.70 on August 24... Keep Reading...
Shiny gold bar rests on financial chart with fluctuating orange and blue lines.

Gold Rebounds After Jobs Data Sparks Friday Selloff

Gold prices retreated on Friday (November 6) coming under pressure from a stronger US dollar and rising Treasury yields, after new US jobs data showed that employers added 165,000 jobs in October.Spot gold was trading around US$4,063 by 2:55 p.m. EST. The decline followed a strong rally earlier... Keep Reading...
Peruvian Metals Provides Corporate Update on Production, New Tailings Results and the Process to Re-Instate the OTCQB Listing

Peruvian Metals Provides Corporate Update on Production, New Tailings Results and the Process to Re-Instate the OTCQB Listing

Peruvian Metals Corp (TSXV: PER,OTC:DUVNF) (OTC Pink: DUVNF) ("Peruvian Metals" or the "Company") is pleased to provide a corporate update regarding 2026 production at the 80% owned Aguila Norte Processing Plant ("Plant"), new sample results from the tailings area and the reinstatement on the... Keep Reading...
Gold nuggets with text: "5 Top Australian Mining Stocks This Week."

Top 5 Australian Mining Stocks This Week: BPM Minerals Gains 111 Percent

Welcome to the Investing News Network's weekly round-up of the top-performing mining stocks on the ASX.This week's top five gainers includes companies focused on gold, antimony, lithium and more.Read on to discover this week's top gaining Australian mining stocks on the ASX and what drove their... Keep Reading...
Peter Schiff, gold bar.

Peter Schiff: Gold, Silver, Energy, Value Stocks — 2027 Opportunities

Peter Schiff, chief economist and global strategist at Euro Pacific Asset Management and founder of Schiff Gold, sees lower gold and silver prices as a buying opportunity.He believes part of the reason for their decline is that markets are overestimating the strength of the American economy, as... Keep Reading...
Chris Temple, gold bars.

Chris Temple: Gold Price Rout Not Over, Watch for This Green Light

Chris Temple, founder, editor and publisher of the National Investor, lays out what's weighing on the gold price right now and what would prompt a turnaround.In his view, the light will turn green for metals once the US Federal Reserve stops talking about fighting inflation, with gold's rebound... Keep Reading...

Interactive Chart

Latest Press Releases

Related News