Slave Lake Zinc Advances Its Critical Metals Zinc, Lead O'Connor Lake Project

Slave Lake Zinc Advances Its Critical Metals Zinc, Lead O'Connor Lake Project

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") is actively exploring the O'Connor Lake zinc - lead project located in the South Slave region of the NWT. The Company has progressively advanced its project using a systematic exploration process.

Slave Lake Zinc has now compiled results from the recent prospecting undertaken at the O'Connor Lake zinc - lead project. As a result of this new information and interpretation of the project geology, regional setting and structure, the Company is planning a major follow up prospecting and development program for 2023.

This season's program was reduced in scale due to a lack of qualified field personnel and a late start. However, the cost-effective exploration during 2022 successfully achieved two main objectives. Trace element geochemistry from the regional scale sampling of quartz vein systems over a distance of approximately eight kilometers confirmed that the wide-spread mineralization is orogenic in nature originating from a deep seated magmatic hydrothermal source. The discovery of a new zinc - lead mineralized zone, approximately 5 kilometers north of the Shaft Zone (News Release October 12, 2022), demonstrates that there appears to be a "structural corridor" trending N-NW hosting mineralization similar to the known deposit; and validates the regional scale deep seated hydrothermal magmatic source model proposed by Dr. B. Prusti (1954).

Slave Lake Zinc was originally formed to search for metals deemed essential to the new environmental and technological age. The Federal Government of Canada has designated zinc to be one of the metals critical to Canada's economic security. Zinc is also essential for Canada's transition to a low - carbon economy. The O'Connor Lake project area originally attracted SLZ due to the extensive historic development work of high-grade zinc - lead mineralization prior to 1952 and primarily because no modern exploration has occurred since this time. Vein structures were delineated prior to 1952 with drilling, trench sampling, and underground methods. It is important to note that the South Slave region is underlain by the regional scale Talston Magmatic Zone ("TMZ"). Similar magmatic zones occur worldwide and contain, and produce, significant quantities of a variety of different, essential minerals, including zinc. As a result, Slave Lake Zinc has targeted the O'Connor deposit and the TMZ region as an attractive and underexplored geological environment.

Preliminary work by the Company included geophysical grid surveying and sampling of mineralization in the area of the historic work (The "Shaft Zone") and compilation of the historic data. Based on information generated by SLZ, the Company projected a northwest trending "structural corridor" to be controlling the location of mineralization. Additionally, a PhD thesis by Dr. B Prusti (1954) concluded that the mineralization was generated from a deep-seated hydrothermal source. This geological model is consistent with deposition in a structurally deformed regional magmatic zone. The 2022 sampling has allowed SLZ to verify that Shaft Zone type mineralization occurs some 5 kilometers to the N-NW providing significant potential for finding additional economic mineralization along this structural trend.

A 900-line km airborne geophysical survey has already been flown over the bulk of the corridor will be released in an upcoming news release.

Slave Lake Zinc has recently completed acquisition of a major land position by staking new mineral claims surrounding the Company's original mineral lease established in 2018. Acquisition of these claims was enabled for Slave Lake Zinc following extensive negotiations in the community of Fort Resolution with the Northwest Territory Metis Nation (NWTMN) council, leading to a formal Collaboration Agreement between the Company and NWTMN. After a complex process lasting over 2 years, the subject lands were made available to SLZ for staking through the lifting of the Interim Land Withdrawal (land dispositions selected for the purposes of settling land claims through federal negotiations) by a Territorial Government Order -in-Council. The interim land withdrawal covers a significant portion of the South Slave Region.

The Company selected the new land for staking based on discussions with the NWTMN and on analysis of the information created and compiled by SLZ. Slave Lake Zinc now holds the largest mineral claim assemblage in the South Slave Taltson Magmatic Zone.

Ritch Wigham, CEO, commented, "The Company's focus now is to develop new zinc and lead rich systems similar to our historic Shaft Zone mineralization, and to explore extensions to the known deposits themselves. The Company has also confirmed the original Dr. Prusti thesis that the O'Connor Lake area mineralization arises from a deep-seated hydrothermal source; and is consistent with the mineralization being derived from a regional magmatic zone environment. The new mineralized system discovered by SLZ approximately 5 kilometers north of the historic Shaft Zone also provides further evidence of the deep-seated hydrothermal origin of the known mineralization. Having generated this information confirming the nature of the zinc - lead mineralization, the Company can now proceed with confidence to design a major exploration program to evaluate multiple targets along the structural corridor. It should also be noted that Slave Lake Zinc has been issued a Land Use Permit and Water License to allow the Company to undertake exploration activities, including drilling."

Gary Vivian, P. GEO, a NI 43-101 Qualified Person has reviewed the information contained in this news release.

On October 31, 2022, the Company signed an agreement with CanaCom Group, pursuant to which CanaCom agreed to provide digital content, marketing, and media distribution services to the Company. Pursuant to the terms of the agreement, such marketing services are to be provided over a 12-month period, commencing on November 3, 2022, for a fee of $100,000, plus applicable taxes. CanaCom is a full-service marketing agency based in Toronto, Ontario. CanaCom provides digital marketing awareness via advertising through its fully owned platform theDeepDive.ca, which includes both video and written content coverage of Canadian small-cap stories. To the best of the Company's knowledge CanaCom does not have any equity interest in the securities of the Company, or a right to acquire such an interest. CanaCom operates as an arm's length service provider to the Company.

On October 31, 2022, the Company has entered into an advertising and investor awareness campaign with Dig Media Inc. dba Investing News Network (INN). INN is a private company headquartered in Vancouver, Canada, dedicated to providing independent news and education to investors since 2007. For the six (6) month term of the agreement starting November 3, 2022, INN will provide advertising on its website to increase awareness of the issuer. INN does not provide Investor Relations or Market Making services. The cost of the campaign is 40,000.00 CDN plus applicable taxes. INN can be reached at 604-688-8231 or info@investingnews.com.

The Company also announces the engagement of CFN Media, a division of CFN Enterprises Inc., a digital agency and financial media platform focused on advancing public companies in emerging industries across the globe.

Under the terms of the agreement entered into with CFN Media, CFN Media will convey the Company's message and value proposition to investors active in the metals and mining space to grow its shareholder base over a two-month campaign. The agreement has a starting date of November 3, 2022 and the cost of the campaign is 20,000.00 USD.

About Slave Lake Zinc

Slave Lake Zinc Corp. intends to develop the potential of its O'Connor Lake property, an historic zinc lead copper property located in the Northwest Territories of Canada. The property is located south of Great Slave Lake and to the east of Pine Point project. The property was initially developed after the Second World War and subsequently abandoned in 1952 when the prices of zinc and lead collapsed post war. Slave Lake Zinc Corp. believes that it is well positioned to advance this project and to expand significantly the historic potential of the property. For more information, please visit www.zinccorp.ca.

On Behalf of the Board of Directors,
Slave Lake Zinc Corp.

Per: 

Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release

Forward-Looking Statement

Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company herein.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/142541

News Provided by Newsfile via QuoteMedia

SLZ:CC
The Conversation (0)
Climate Change Has Now Become Personal for the North and South Slave and Slave Lake Zinc

Climate Change Has Now Become Personal for the North and South Slave and Slave Lake Zinc

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company"): As much as we want to get on the ground and advance our project, we support and sympathise with the efforts to contain the devastation that our friends are subjected to in the communities that we are associated with in the South Slave.

Hay River, Fort Smith, and Yellowknife are integral to our partners and our ongoing advancement of our mutually beneficial project to combat the obvious climate change challenges that we all face. Thankfully at this point Fort Resolution has only been superficially affected by this regional catastrophe. We deeply hope that remains the case as the summer and this catastrophic fire season are not yet contained.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Forest Fires Delay Plans for Slave Lake Zinc

Forest Fires Delay Plans for Slave Lake Zinc

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") With the expansion of the forest fire issues in the Northwest Territories, the Territorial government has expropriated all the rotary wing aircraft available in the N.W.T. to support the efforts to fight the expanding forest fire problem. Fixed wing aircraft are also have significant issues in operating under the current conditions.

Consequently, Slave Lake Zinc has had to postpone the proposed ground exploration recognisance program that was scheduled. We will resume these plans as soon as practicable and look even more forward to advancing our exciting critical metals suite of minerals.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project

Slave Lake Zinc Initiates Summer Lithium Exploration Program to Expand "Critical Metals" Project

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") is pleased to announce the commencement of its anticipated summer Lithium exploration program, as previously announced on July 17, 2022. This program marks a significant step towards enhancing the Company's "critical metals" project.

The summer exploration program will begin with a focus on conducting reconnaissance prospecting and sampling within a 15 square kilometer area located west of the original headframe, where many pegmatite showings are mapped. The initial fieldwork will target a pegmatite dyke swarm within this region, where northwest trending pegmatites are found to intrude all other rock units. The Company's property is part of the regional-scale Yellowknife Lithium initiative, with the east arm of Great Slave Lake providing the only separation of SLZ from known lithium bearing pegmatites in this extensive lithium corridor. Slave Lake Zinc has engaged Aurora Geosciences of Yellowknife as their experienced geological consultants. CEO Ritch Wigham will accompany Aurora Geosciences during this phase of exploration.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories

Slave Lake Zinc Announces Corporate Update and Exploration of Lithium Potential in Northwest Territories

Slave Lake Zinc Corp. (CSE: SLZ) (the "Company") Slave Lake Zinc is excited to share its corporate update and announce its exploration plans for lithium potential in Canada's Northwest Territories. The company is currently designing its summer exploration program and is eagerly anticipating the sampling of pegmatite formations on its property for potential lithium content. This project could potentially add to the company's already important critical metals project in the region.

The company's geologists and advisors have identified numerous significant pegmatite formations from historic mapping conducted on the maiden O'Connor Lake MWK claims from the 1950s. These formations have been mapped over several hundreds of meters. This historical mapping was conducted in conjunction with the then-company, American Yellowknife Mines, which was establishing production for zinc/lead at O'Connor Lake prior to operations halting due to poor metals prices in the early 1950s.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Slave Lake Zinc Poised to Become a Key Player in Canada's Green Economy

Slave Lake Zinc Poised to Become a Key Player in Canada's Green Economy

Slave Lake Zinc Corp (CSE: SLZ) is on the verge of becoming a significant participant in the country's green economy with its strategic metal's exploration operations. The company has recently expanded its potential to include lithium, which is a critical component for electric car batteries, alongside its existing zinc and lead exploration developments.

Slave Lake Zinc has a unique project with an established zinc/lead target and unparalleled lithium potential in the same suite of host rocks.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
[VIDEO ENHANCED] Prismo Metals Options Two High-Grade Silver-Gold Mines in the Arizona Copper Belt - Immediate Exploration Planned

[VIDEO ENHANCED] Prismo Metals Options Two High-Grade Silver-Gold Mines in the Arizona Copper Belt - Immediate Exploration Planned

 

(TheNewswire)

 
       
  Prismo Metals Inc. 
                
 

Vancouver, British Columbia, July 3rd, 2025 TheNewswire - Prismo Metals Inc. (the " Company ") (CSE: PRIZ) (OTCQB: PMOMF) is pleased to announce that it has signed option agreements to acquire 100% interest in two historic high-grade precious and base metal mines — the Silver King and Ripsey mines — both located in Arizona's prolific Copper Belt near its flagship Hot Breccia project.

 

Additional information on the Silver King and Ripsey mines as well as Prismo's other projects (Hot Breccia and Palos Verdes) is available on Prismo's Youtube channel at:   

  

 

  Exceptional Grades and Untapped Potential  

 

Discovered in 1875, the Silver King mine is one of Arizona's most important historic producers, yielding nearly 6 million ounces of silver at grades of up to 61 oz/t. Remarkably, selected samples from small-scale production in the late 1990s returned grades as high as 644 oz/t silver (18,250 g/t) and 0.53 oz/t gold (15 g/t), indicating that high-grade mineralization remains. Additionally, the presence of freibergite (AgCuSbS) suggests a potential for antimony, a critical mineral with growing strategic demand.

 

The Ripsey mine, located 20 km west of Hot Breccia, is also an historic gold-silver-copper producer with significant upside. Historic sampling has returned up to 15.85 g/t gold and 276 g/t silver, yet no modern exploration has been conducted.

 

  Strategic Location — World-Class Neighbors  

 

The Silver King mine sits only 3 km from the main shaft of the Resolution Copper project — a joint venture between Rio Tinto and BHP and one of the world's largest unmined copper deposits with an estimated copper resource of 1.787 billion metric tonnes at an average grade of 1.5% copper (1) . This unique land position is fully surrounded by Resolution Copper's claim block, offering strategic upside.

 

"The Silver King and Ripsey mine projects are exciting additions to our Arizona portfolio. We see an opportunity to create near term value through immediate exploration on a historic high-grade silver producer with antimony potential that has seen limited modern exploration by drilling both laterally and at depth into a prospective source formation, said Gordon Aldcorn, President of Prismo. "We look forward to getting our exploration team back in the field, advancing our exciting projects and revitalizing investor interest in the Company."

 

The Silver King mine was discovered in 1875 and produced ore with as much as 10,000 ounces per ton silver in near surface workings (2) . Underground production through 1889 is estimated at almost 6 million ounces of silver at grades of between 61 and 21 ounces per ton. During a second period of production from 1918 to 1928, 230,000 ounces were produced at a grade of 18.7 ounces per ton.  No significant production has occurred after 1928.

 

The orebody at Silver King is a steeply west-dipping pipelike stockwork and breccia zone that was mined on eight levels to about 300 meters depth below a glory hole at the surface. The pipe is described as a dense stockwork with local breccia zones and a quartz core (3) .  Records indicate that due to variations in mineralogy, much of the upper portion of the body was evidently not mined. The current owners (the " Optionor ") rehabilitated the main shaft in the late 1990s, opened the upper levels of the mine and produced a small tonnage. Assay certificates from this period show selected samples with 400 to 600 ounces per ton silver with 0.2-0.5 oz/t gold and some base metals. Virtually no modern exploration has been carried out at the mine providing significant exploration upside and multiple drill targets.

 

The Ripsey mine is a historic gold-silver-copper producer located about 20 km west of the Hot Breccia project. Historic mine workings consisting of tunnels and shafts on several levels were developed along a vein over about 400 meters of strike length and 160 meters vertically. A small tonnage of mineral was produced by the Optionor in the late 1990's. Sampling by Dr. Craig Gibson from the mine workings has yielded 15.9 g/t gold and 275 g/t silver over 0.75 meters and 8.7 g/t gold, 181 g/t silver, 3% copper and 9% zinc over 1 meter. No modern exploration has been carried out at the project, providing significant exploration upside and multiple drill targets.

 

The Company plans to conduct a detailed mapping and sampling program at both projects at surface exposures and in accessible workings.  A drill program is planned for Silver King, with about 1,000 meters initially. The Silver King drill program is designed to test the mineralized body at four elevations as well as lateral to the pipelike body. De-watering of the Silver King shaft to gain access to the upper levels may also be undertaken as submersible pumps are in place.

 

"This is a fabulous opportunity for the Company. Both projects are high-grade and are easily accessible and may be associated with porphyry copper mineralization. We also look forward to evaluating the potential for antimony at Silver King. We're excited to begin exploration immediately to test the Silver King's pipelike mineralized body at multiple depths and laterally," said Dr. Craig Gibson , Chief Exploration Officer. "This region is world-class for porphyry systems and base and precious metals, and we believe these mines have significant untapped potential."

 

    
Click Image To View Full Size
 

 

Location of the Company's projects withing the Arizona Copper Belt

 

    
Click Image To View Full Size
 

 

Land map of the Silver King mine.

 

    
Click Image To View Full Size
 

 

Drone view of the Silver King mine.

 

     

 

The Silver King mine in the late 1800's.

 

    
Click Image To View Full Size
    
Click Image To View Full Size
 

 

Small scale mining in the upper levels of the Silver King mine in the late 1990's.

 

  Deal description  

 

Prismo has the option to acquire a 100% interest in both the Silver King and Ripsey mines. Prismo can earn a 100% interest in the Ripsey mine by issuing one million shares to the Optionor, paying the Optionor US $10,000 within six months of the signing of the option agreement (the " Effective Date "), US $10,000 on each anniversary of the Effective Date and US $1 million to the Optionor within five years of the Effective Date. Prismo does not have minimum work commitments as part of the Ripsey option agreement.

 

Regarding the Silver King mine, Prismo can acquire a 100% interest in three stages. Prismo must issue one million shares to the Optionor, pay the Optionor US $10,000 within six months of the Effective Date, and US $10,000 on each anniversary of the Effective Date. To earn a first 50% interest, Prismo must incur no less than US $500,000 in expenditures on or before the first anniversary of the Effective Date, incur no less than an additional US $2.5 million expenditures on or before the third anniversary of the Effective Date and issue to the Optionor two million shares. Prismo can acquire an additional 30% interest by incurring no less than an additional US $3 million in expenditures, paying the Optionor US $1 million and issuing to the Optionor two million shares before the fifth anniversary of the Effective Date. Prismo can elect to form a joint venture at anytime after earning it initial 50% interest. The option agreement and joint venture agreement terms and conditions contain standard buyout and dilution terms regarding the final 20% interest.

 

  Private Placement  

 

Prismo is also pleased to announce a non-brokered private placement (the " Private Placement ") of five million units of the Company (" Units ") at an issue price of $0.05 per Unit for minimum gross proceeds of $250,000. Each Unit will consist of one common share in the capital of the Company (a " Share ") and one-half of one common share purchase warrant of the Company (each whole warrant, a " Warrant "). Each Warrant will entitle the holder to purchase one Share for a period of twenty-four (24) months from the date of issue at an exercise price of $0.10.

 

The Private Placement will also be made available to existing shareholders of the Company who, as of the close of business on July 1st, 2025, held Shares (and who continue to hold such Shares as of the closing date of the Private Placement), pursuant to the existing securityholder exemption set out in BC Instrument 45-534 – Exemption From Prospectus Requirement for Certain Trades to Existing Security Holders (the " Existing Securityholder Exemption "). The Existing Securityholder Exemption limits a shareholder to a maximum investment of CAD$15,000 in a 12-month period unless the shareholder has obtained advice regarding the suitability of the investment and, if the shareholder is resident in a jurisdiction of Canada, that advice has been obtained from a person that is registered as an investment dealer in the jurisdiction. If the Company receives subscriptions from investors relying on the Existing Securityholder Exemption exceeding the maximum amount of the Private Placement, the Company intends to adjust the subscriptions received on a pro-rata basis.

 

The Units issued pursuant to the Private Placement and the Existing Securityholder Exemption will be subject to a four-month hold period from the closing date of the Private Placement under applicable Canadian securities laws, in addition to such other restrictions as may apply under applicable securities laws of jurisdictions outside Canada.  

 

  The Company intends to use the net proceeds of the Private Placement for general corporate purposes. The Company may pay finder's fees to eligible finders in connection with the Private   Placement, subject to compliance with applicable securities laws and Canadian Securities Exchange policies.  

 

  The securities being offered have not been and will not be registered under the U.S. Securities Act and may not be offered or sold in the United States, or to, or for the account or benefit of, U.S. persons or persons in the United States, absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any State in which such offer, solicitation or sale would be unlawful.  

 

  Debt Settlements  

 

  Prismo also announces that it has entered into debt settlement agreements (the "   Settlement Agreements   ") with certain creditors of the Company (the "   Creditors   ") pursuant to which the Company agreed to issue to the Creditors, and the Creditors agreed to accept, an aggregate of 160,000  shares of the Company (each, a "   Share   ") in full and final settlement of accrued and outstanding indebtedness in the aggregate amount of $11,000 (the "   Debt Settlement   ").   All securities issued pursuant to the Debt Settlement will be subject to a statutory hold period of four months from the date of issuance, in accordance with applicable policies of the Canadian Securities Exchange.  

 

  Share and Warrants Issuance  

 

  A private company dealing at arms' length with Prismo, its officers and directors, had certain rights into the Silver King and Ripsey mines ("   PrivateCo   "). In consideration for PrivateCo relinquishing its rights in the Silver King and Ripsey mines in favor of the Company, Prismo has agreed, subject to regulatory approval, to issue PrivateCo five million units (the "   Units   "). Each Unit is comprised of one common share (a "   Share   ") and one share purchase warrant (a "   Warrant   "). The Shares will become free trading as to 25% every six months from the Effective Date. Two million of the Warrants will be exercisable at $0.10 ("   First Tranche   ") and three million Warrants will be exercisable at $0.15 ("   Second Tranche   "), all for a period of three years. The shares from the exercise of the Warrants will become free trading as to 25% every six months from the Effective Date. In addition, the exercise of the First Tranche is conditional on Prismo having raised $1.5 million from parties introduced to Prismo by the principals of PrivateCo and the exercise of the Second Tranche is conditional on Prismo having raised $3.0 million from parties introduced to Prismo by the principals of PrivateCo.  

 

  Qualified Person  

 

   Dr. Craig Gibson, PhD., CPG., a Qualified Person as defined by NI-43-01 regulations and Chief Exploration Officer and a director of the Company, has reviewed and approved the technical disclosures in this news release. Other than the sampling conducted by Dr. Craig Gibson as indicated herein, the data presented in this press release was obtained from public sources, should be considered incomplete and is not qualified under NI 43-101, but is believed to be accurate. The Company has not verified the historical data presented and it cannot be relied upon, and it is being used solely to aid in exploration plans.   

 

  1)     https://resolutioncopper.com/about-us/    

 

  2)   Galbraith, F, 1935, Geology of the Silver King area, Superior, Arizona, Univ. of Arizona thesis, 153p plus plates.  

 

  3)   Blake, W.P., 1883, Description of the Silver King Mine, Arizona, New Haven, 48p plus plates.  

 

  About Prismo Metals Inc.  

 

  Prismo (CSE: PRIZ) is a mining exploration company focused on advancing its Hot Breccia copper project in Arizona and its Palos Verdes silver project in Mexico.  

 

  Please follow @PrismoMetals on   ,   ,   ,    Instagram    , and  

 

  Prismo Metals Inc. ,   1100 - 1111 Melville St., Vancouver, British Columbia V6E 3V6  

 

  Contact:  

 

  Alain Lambert, Chief Executive Officer    alain.lambert@prismometals.com   

 

  Gordon Aldcorn, President    gordon.aldcorn@prismometals.com   

 

  Cautionary Note Regarding Forward-Looking Information  

 

  This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to, among other things: the timing, costs and results of drilling at Hot Breccia.  

 

  These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things: delays in obtaining or failure to obtain appropriate funding to finance the exploration program at Silver King and Ripsey. In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that: the ability to raise capital to fund exploration and the timing of such exploration.  

 

  Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-   looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.  

 

  NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES
OR FOR DISSEMINATION IN THE UNITED STATES
 

 

Copyright (c) 2025 TheNewswire - All rights reserved.

 

 

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Bold Ventures Provides Update on Field Work at Burchell Property

Bold Ventures Provides Update on Field Work at Burchell Property

 

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") is pleased to provide an update on the progress of field work at its Burchell Gold and Copper Property, located approximately 100 km west of Thunder Bay.

 

Prospecting, outcrop mapping and soil sampling were carried out during the months of May and June on a 1 km by 800 m flagged grid centered on the recently discovered 111 Zone, where grab samples returned between 10 ppb gold and 68 g/t gold last December (see news releases dated December 12, 2024 and January 9, 2025). More than 600 rock and soil samples have been submitted for analysis from this first phase of field work, with final results pending.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×