Quetzal Copper Announces Acquisition of Cristinas Copper Project, Chihuahua, Mexico

Quetzal Copper Announces Acquisition of Cristinas Copper Project, Chihuahua, Mexico

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company"), a copper-focused exploration company, is pleased to announce that the Company entered into an agreement with certain third-party vendors (the "Polaris Vendors"), pursuant to which the Company has been granted the option (the "Polaris Option") to acquire all of the issued and outstanding shares of Polaris Resources, S.A. de C.V. ("Polaris Resources"). Polaris Resources holds a 100% interest in the Cristinas copper project located in the state of Chihuahua, Mexico (the "Cristinas Project"), subject to fulfillment of certain underlying payments to be made to the underlying property vendors (the "Property Vendors").

CEO Matthew Badiali said, "The Cristinas Project is another exciting exploration target identified by the Company's technical team. It has all the features we value: nearby infrastructure, road access, outstanding geology with high-grades, and historic exploration success. The Cristinas Project held a small-scale oxide copper mine in the 1970's. The only drilling since was completed in 2014. That program yielded 4.3 metres true width grading 3.2% copper and 3.7 meters (true width) of 3.0% copper. These are the deepest completed holes, only 80m below the surface and remain open at depth. No one ever followed up on the historical drill program. We believe the Cristinas Project provides our shareholders with an excellent risk/reward profile for an exploration project, and we intend to commence drilling in late May 2024."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10393/205050_829d367ec4f5cae7_001.jpg

Figure 1:Plan map showing veining, historic copper surface samples and locations of historic drill holes at the Cristinas Project, Chihuahua, Mexico.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10393/205050_829d367ec4f5cae7_001full.jpg

Cristinas Project

The 685-hectare Cristinas Project is in northeastern Chihuahua state, Mexico, approximately 2-hours by car from Chihuahua City. The Cristinas Project includes a historic copper mine that operated in the 1970's on shallow copper oxide mineralization.

In 2014, Cyprium Mining Corp. drilled twelve holes in and around the historic workings. The program evaluated potentially higher-grade shallow copper-silver mineralization up to 150 m in depth (Cyprium Mining Management Discussion and Analysis, November 26, 2014). The program identified four closely spaced, parallel structures with widths between 0.25 m to 10 m in width. Grades ran from 0.2% to 12.4% copper and from 2 to 298 grams per tonne (g/t) silver (Table 1). Cyprium was seeking to put the Cristinas Project into production at a small scale.

Quetzal approaches the Cristinas Project with a new geological interpretation. Company geologists identified extensive sets of copper-rich carbonate veins which may be part of a copper-rich, carbonate replacement (CRD)/skarn style mineralizing system. The Project lies within the most prolific CRD belt in Mexico. This opens the potential for significant extensions of copper mineralization beneath the shallow drilling and along strike.

The deepest drilled holes at the Cristinas Project are the best intercepts and suggest the potential for wider intercepts of high-grade copper mineralization in deeper drilling. It is common for the best copper mineralization to occur at the heart of a CRD system next to the causative intrusive rock. This suggests stepping down from the current results towards the centre of the system is an excellent opportunity and will be the first focus of drilling planned by Quetzal for late May 2024.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10393/205050_829d367ec4f5cae7_002.jpg

Figure 2:Images from Cristinas Property, historic drill core and surface hand samples.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10393/205050_829d367ec4f5cae7_002full.jpg

Table 1 below shows selected historical drill results from 2014:

Drill HoleFrom
(m)
To
(m)
Estimated
True Width
(m)
Copper
(%)
Silver(g/t)
LC14DD0456.260.73.60.73.0
Includes57.459.01.31.78.0
LC14DD0544.545.80.94.96.0
And56.260.73.73.017.0
LC14DD069.217.26.50.52.0
LC14DD0713.917.73.70.66.0
LC14DD09104.6116.810.61.44.0
Includes111.8116.84.33.214.0
And116.8126.78.60.53.0
Includes120.2121.91.51.27.0
LC14DD1061.171.910.31.45.0
Includes66.669.32.53.012.0
And111.1126.915.40.21.0
LC14DD1116.819.62.51.57.0
And35.443.16.70.38.0
Includes42.643.10.431.460.0

The reader is cautioned that results in this news release are based on prior data and reports prepared by previous property owners and operators. The reader is cautioned not to treat them, or any part of them, as current and that a qualified person has not done sufficient work to verify the results and that they may not form a reliable guide to future results. The Company considers these historical results relevant as it is using this data as a guide to plan exploration programs. No independent QA/QC protocols are known and as such analytical results may be unreliable.

Acquisition Terms

Quetzal has entered into an option agreement, dated April 9, 2024, with the Polaris Vendors, pursuant to which the Company has been granted the Polaris Option. In order to exercise the Polaris Option, Quetzal must make a US$50,000 payment to the Vendors by April 9, 2025.

Quetzal will also assume the responsibility to make the underlying option payments on the Cristinas Project to the Property Vendors as follows: (i) cash payments of US$100,000 on each of May 12, 2024 May 12, 2025 and May 12, 2026 to the Vendors; (ii) the issuance of US$500,000 worth of common shares of Quetzal on each of May 12, 2025, May 12, 2026 and May 12, 2027 to the Vendors; and (iii) complete US$1,000,000 in exploration on the Cristinas Project on or before December 31, 2025.

The Polaris Option and fulfillment of the underlying option payments on the Cristinas Project to the Property Vendors is subject to the approval of the TSX Venture Exchange (the "TSXV"). All parties to the Polaris Option are arm's length to the Company. No finder's fee is payable in respect of the Polaris Option.

QP Statement

Dr. Roy Greig, P.Geo., a Qualified Person as defined under National Instrument 43-101, has reviewed and approved the technical content in this release.

Investor Relations

In addition, the Company is pleased to announce that, subject to regulatory approval, it has entered into an advertising and investor awareness agreement with Dig Media Inc. dba Investing News Network ("INN") dated April 8, 2025 (the "Agreement"). Pursuant to the Agreement, INN will receive $60,000 plus GST compensation for the fourteen-month campaign, payable in 12 equal instalments of $5,000. INN and the Company are unrelated and unaffiliated entities and at the time of the Agreement, neither INN nor its principals have an interest, directly or indirectly, in the securities of the Company.

INN is a private company headquartered in Vancouver, Canada, dedicated to providing independent news and education to investors since 2007. For the 14-month term of the Agreement, INN will provide advertising to increase awareness of the Company which will involve, among other things, a profile on the Company in INN's newsletter, news release syndication, banner advertising and dedicated emails for news releases.

About Quetzal Copper

Quetzal is engaged in the acquisition, exploration, and development of mineral properties in British Columbia. Quetzal currently has a portfolio of three properties located in British Columbia, Canada. The Company's principal project, Princeton Copper, is located adjacent to Hudbay's Copper Mountain mine in southern British Columbia.

For further information please contact:

Quetzal Copper Limited

Matthew Badiali, CEO
Phone: (888) 227-6821

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS

The information contained herein contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements in this news release include, among others, statements relating to: exercise of the Polaris Option; payment of underlying option payments; and the exploration and development of the Company's properties.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the results of planned exploration activities are as anticipated, the anticipated cost of planned exploration activities, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, no known mineral reserves or resources, the limited operating history of the Company, aboriginal title and consultation issues, reliance on key management and other personnel, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated, accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/205050

News Provided by Newsfile via QuoteMedia

Q:CC
The Conversation (0)
Quetzal Copper Samples 3.8 M of 2.4% Copper Associated with EM Geophysical Target Extending to 350M Depth at Cristinas Project

Quetzal Copper Samples 3.8 M of 2.4% Copper Associated with EM Geophysical Target Extending to 350M Depth at Cristinas Project

Highlights:

  • Surface rock chip channel sample returns 3.8m of 2.4% Copper and 162 g/t Silver at the Cristinas mine target.
  • Geophysical survey over the mine target area shows a conductor associated with mineralization that extends, untested, to at least 350m depth beneath historic shallow drilling.
  • A second conductor in the hanging wall of the mine target adds an additional drill target.
  • Drilling commencing in May 2024 to test open copper intercepts and geophysical targets at the Cristinas project.

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company"), a copper-focused exploration company, is pleased to announce the results of the due diligence surface rock sampling campaign and geophysical survey at the Cristinas Project, Chihuahua Mexico.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Quetzal Copper Announces Resumption of Trading on TSX Venture Exchange

Quetzal Copper Announces Resumption of Trading on TSX Venture Exchange

Quetzal Copper Corp. (TSXV: Q) (formerly, Ankh Capital Inc.) ("Quetzal" or the "Company") is pleased to announce that, further to its news release dated March 12, 2024, the TSX Venture Exchange (the "TSXV") has granted final approval for the Company's previously disclosed qualifying transaction (the "Transaction"). The common shares of the Company will resume trading on the TSXV as a Tier 2 Mining Issuer under the ticker symbol "Q" when markets open on March 18, 2024.

CEO Matt Badiali said, "Quetzal Copper is excited to begin trading and commence exploration on a portfolio of high-grade copper projects. As a private company we assembled some of the highest discovery potential ground in the industry and have progressed to publicly trading with what the company believes is a very competitive valuation. Quetzal looks forward to drilling at our flagship Princeton Copper Project, immediately north of Hudbay Minerals Copper Mountain Mine in southern British Columbia and continue to advance the Big Kidd and DOT copper projects."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Los Andes Copper Ltd. Announces Board Change

Los Andes Copper Ltd. Announces Board Change

Los Andes Copper Ltd. (TSXV: LA) (OTCQX: LSANF) ("Los Andes" or the "Company"), announces that Non-Executive Director, Warren Gilman, is stepping down from the Board due to other business commitments. Warren will become a Senior Advisor to the Board and remains actively supportive of the Company.

Eduardo Covarrubias, Chairman of Los Andes, commented: "We would like to thank Warren for his invaluable support and time on the Board over the past three years. We are delighted that he has agreed to remain as a key Senior Advisor to the Board allowing us to continue to benefit from his extensive experience and backing."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Bold Ventures Completes Electromagnetic Conductor Modelling at Farwell and Amends Option Agreements

Bold Ventures Completes Electromagnetic Conductor Modelling at Farwell and Amends Option Agreements

Bold Ventures Inc. (TSX.V:BOL) (the "Company" or "Bold") is pleased to announce that it has completed geophysical modelling of 6 high priority electromagnetic conductors identified by a helicopter-borne, versatile time domain electromagnetic (VTEM Plus) and magnetic survey carried out by Bold in 2022. A copy of the report may be found in the Project Reports section found on the Farwell Battery and Precious Metals Project page. Combined with the geological and geophysical work accomplished to date, a drill program to test these targets has been developed

The Farwell Gold and Copper project is located approximately 55km northwest of Wawa Ontario and consists of 133 Cells and Multi Cells comprising 15,901 acres (6,935 hectares). For reporting purposes, the Farwell property has been divided into three areas exhibiting gold and copper mineralization. They are the Farwell Sulphide Zone, the Tundra Gold Horizon and the Koala Gold Area. The focus for this phase of work is the Farwell Sulphide Zone where historical diamond drilling intersected highly anomalous copper values ranging up to 1.47% Cu over 5.2m (Bennett and Thurston 1977). The Farwell property geology and exploration results can be viewed at the Farwell Battery and Precious Metals Project.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
World Copper Closes Final Tranche of Over-Subscribed Non-Brokered Private Placement

World Copper Closes Final Tranche of Over-Subscribed Non-Brokered Private Placement

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper" or the "Company") reports that pursuant to their news releases dated February 27, 2024 and April 12, 2024, the Company has closed the final tranche of their non-brokered financing, issuing an additional 16,531,957 units for proceeds of $1,157,237. Aggregate totals from both tranches total 69,547,069 units for gross proceeds of $4,868,294.89.

Each unit consisted of one common share of the Company (a "Share") and one-half of one common share purchase warrant (a "Warrant"). Each whole Warrant entitles the holder to acquire one additional share of the Company for a period of two years from the date of issuance at a price of $0.17 per share. The expiry of the Warrants may be accelerated if the closing price of the Company's common shares on the TSX Venture Exchange ("TSXV") is equal to or greater than $0.30 for a minimum of twenty consecutive trading days and a notice of acceleration is provided in accordance with the terms of the Warrants.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Interra Provides Rip Copper Molybdenum Project Exploration Update

Interra Provides Rip Copper Molybdenum Project Exploration Update

Interra Copper Corp. (CSE: IMCX) (OTCQB: IMIMF) (FSE: 3MX) ("Interra" or the "Company") is pleased to provide detail of the first phase exploration program at the Rip Copper Project (the "Project" or "Rip") in the Stikine region of British Columbia. The Rip Project is situated approximately 33 km northeast of Imperial Metals' past producing Huckleberry copper-molybdenum ("Cu-Mo") mine (see Figure 1), which is presently on care and maintenance. Imperial Metals Corporation is exploring Huckleberry and its surrounding claims for additional Cu-Mo resources.

In late 2023, the Company first announced its option agreement with ArcWest Exploration Inc. ("ArcWest") to acquire an 80% interest in ArcWest's Rip Cu-Mo project. Interra can earn the first tier of its interest in the project by completing staged exploration work totalling C$2.0 million and direct payment of C$100,000 and annual share payments over 4 years until end of 2027. Interra is currently funded for, and anticipates, it will meet and likely exceed its 2024 and 2025 obligations for the earn-in of C$300,000 and C$500,000 in expenditures respectively with the budget outlined in this 2 stage program. The initial program is staged into 2 work phases: 1) A geophysical program to define drill targets, commencing in late April and; 2) A diamond drilling program tentatively scheduled for Q3/Q4 of 2024.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Ramp Metals Inc.  Opens the Market

Ramp Metals Inc. Opens the Market

Jordan Black Chief Executive Officer and Director, Ramp Metals Inc. (TSXV: RAMP) ("Ramp Metals" or the "Company"), and his team joined Omar Khafagy Manager, Corporate Access, Toronto Stock Exchange (TSX), to open the market and celebrate the Company's listing to TSX Venture Exchange (TSXV).

Ramp Metals is a battery and base metal exploration company with two flagship properties located in northern Saskatchewan and one property in Nye County, Nevada .

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/ramp-metals-inc-tsxv-ramp-opens-the-market-302127855.html

SOURCE Toronto Stock Exchange

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/25/c9697.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

Canadian North Resources Inc. Reports Operational and Financial Results for the Year Ended December 31, 2023

2023 Operational and Project Highlights:

  • The Company raised over $17 million for exploration, with cash and cash equivalents of $5,540,312 at the year end
  • Completed aggressive exploration programs with 21,126 meters in 47 holes drilled in 2023.
  • Adding results of 39,270 meters in 145 holes of new diamond drilling to the project database for the updated Mineral Resources estimation reported in Q1 2024, which includes:

    • A 172% increase of Indicated Mineral Resources to 66.1 million tonnes (Mt) containing 1,093 million pounds (Mlb) copper at 0.75%, 678Mlb nickel at 0.47%, 79Mlb cobalt at 0.05%, 2.34 million ounces (Moz) palladium at 1.10 g/t and 0.42Moz platinum at 0.19 g/t.
    • 80% of the Indicated Mineral Resources is Open Pit with 52.7Mt at 0.65% Cu, 0.43% Ni, 0.05% Co, 0.97g/t Pd and 0.17% Pt.
    • Inferred Mineral Resources of 25.9Mt containing 558Mlb copper at 0.98%, 333Mlb nickel at 0.58%, 40Mlb cobalt at 0.07%, 1.12Moz palladium at 1.43 g/t and 0.21Moz platinum at 0.25 g/t.

Canadian North Resources Inc. ("the Company", TSXV: CNRI; OTCQX: CNRSF; FSE: EO0 (E-O-zero)) is pleased to announce the operational and financial results for the year ended December 31, 2023.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×