Purepoint Uranium Reports Results from Tabbernor Project Geophysical Survey

Purepoint Uranium Reports Results from Tabbernor Project Geophysical Survey

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") today announced initial results of its recently completed airborne FALCON gravity survey across the 81,817-hectare Tabbernor Project, located near the southeastern edge of Saskatchewan's Athabasca Basin.

"The results of our FALCON gravity survey have provided a critical next step in refining priority targets at Tabbernor." said Scott Frostad, Vice President Exploration at Purepoint. "We have now outlined three key areas showing favourable geology, complex structural features and potential hydrothermal alteration - strong indicators of uranium mineralization. Our next phase of work will focus on further refining these targets in preparation for drilling."

Highlights

  • 7,549 line-kilometre, airborne FALCON gravity and magnetic completed by Xcalibur Smart Mapping;

  • Three high-priority exploration zones identified, each displaying gravity low anomalies, suggesting potential hydrothermal alteration and uranium-bearing structures; and

  • Follow-up prospecting and soil geochemistry programs planned for summer 2024 to further define drill targets.

  • Previous airborne electromagnetic surveys over the Tabbernor project have outlined over 70 kilometres of EM conductors reinforcing the project's potential.

Recent airborne electromagnetic surveys at the Tabbernor project have now defined over seventy (70) kilometres of EM conductors reinforcing the project's potential to host large-scale uranium mineralization. The Central Conductive Trend, stretching 57 kilometres, has emerged as the primary exploration target. Results from the FALCON gravity and magnetic survey (Figure 1) indicate that these centrally located conductive rocks mark a key geological transition zone shifting from granitic rocks in the south to sedimentary rocks towards the north - a setting known to be favourable for uranium disposition.

The project area is structurally controlled by the Tabbernor Fault System, a deep-seated, regionally significant fault network linked to several uranium deposits to the north. The 2024 FALCON gravity survey has significantly enhanced the structural interpretation, identifying previously unrecognized faulting that could control uranium deposition.

Exploration efforts are now focused on three priority exploration target areas where airborne gravity data has identified low-density anomalies, potentially indication hydrothermal alteration - a key indicator of uranium mineralization. Summer 2025 exploration plans include prospecting, boulder sampling and soil geochemistry with results guiding follow-up ground geophysics and diamond drilling.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3218/241939_figure1_550.jpg

Figure 1: Enhanced Vertical Gravity Results from 2024 Airborne FALCON Gravity Survey over the Tabbernor Project

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3218/241939_figure1.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3218/241939_904c8413b4b8689c_008.jpg

Figure 2: Location of the Tabbernor Project

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3218/241939_904c8413b4b8689c_008full.jpg

Tabbernor Project

The 100% owned Tabbernor Project is strategically positioned along three major trends of the Tabbernor Fault System, a deep seated, 1,500-kilometre crustal shear system that runs north through the Athabasca Basin. The system not only hosts over 80 historic mines and gold occurrences but also crosscuts the Basin's mine trend aligning itself with 8 of the Basin's largest uranium discoveries.

The Tabbernor project is roughly 40 kilometres south of Cameco's Eagle Point deposit (Figure 2) and is comprised of 35 contiguous mineral claims covering an area of 81,817 hectares. The original three north-south claim groups that covered Tabbernor structures have now been expanded to include a strong east-northeast trending corridor of conductive rocks further enhancing the project's exploration potential.

Purepoint's current focus is the 57-kilometre graphitic corridor that cuts through the project, specifically, areas with gravity low responses and showing evidence of structural complexity. Notably, recent drilling on an adjacent property intersected significant mineralization associated with the central Tabbernor graphitic structure (see CanAlaska Uranium Ltd. press release, September 27, 2023).

Tabbernor Fault System

The Tabbernor Fault System (TFS) is a wide, >1,500 kilometre geophysical, topographic, and geological structural zone that trends approximately northward along Saskatchewan's eastern boundary. Purepoint's research has shown that although none of the province's currently known uranium deposits have been linked to the north-south trending TFS, localized shear zones hosting uranium mineralization may have an associated north-south structural component.

Reactivation of the TFS may have coincided with the age of formation of large uranium deposits in the Athabasca Basin (Davies, 1998). Davies also concluded that structural similarities between the TFS and mineralized areas suggest that the fault system may have had a control on the location of mineralization. More specifically, he considered that several deposits, such as the Sue, Midwest, Dawn Lake and Rabbit Lake all demonstrate a north-south control and strong Tabbernor-like characteristics.

Reference:

Davies, J.R. (1998): The origin, structural style, and reactivation history of the Tabbernor fault zone, Saskatchewan, Canada; Master's thesis, McGill University, Montreal, Quebec, 105p.

About Purepoint

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) is a focused explorer with a dynamic portfolio of advanced projects within the renowned Athabasca Basin in Canada. The most prospective projects are actively operated on behalf of partnerships with industry leaders including Cameco Corporation, Orano Canada Inc. and IsoEnergy Ltd.

Additionally, the Company holds a promising VMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Corporation's McIlvenna Bay project. Through a robust and proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the globe's most significant uranium districts.

Scott Frostad BSc, MASc, PGeo, Purepoint's Vice President, Exploration, is the Qualified Person responsible for technical content of this release.

For more information, please contact:

Chris Frostad, President & CEO
Phone: (416) 603-8368
Email: cfrostad@purepoint.ca

For additional information please visit our new website at https://purepoint.ca, our Twitter feed: @PurepointU3O8 or our LinkedIn page @Purepoint-Uranium.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press release.

Disclosure regarding forward-looking statements

This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/241939

News Provided by Newsfile via QuoteMedia

PTU:CA
Purepoint Uranium

Purepoint Uranium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Purepoint Uranium (TSXV:PTU, OTCQB:PTUUF)

Purepoint Uranium


Keep reading...Show less

Backed by Industry Leaders. Built for Large-Scale Exploration

Purepoint Completes Initial Drill Program Along Groomes Lake Conductive Corridor at Smart Lake JV

Purepoint Completes Initial Drill Program Along Groomes Lake Conductive Corridor at Smart Lake JV

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") today reported the completion of its initial drill program at the Smart Lake Joint Venture in Saskatchewan's Athabasca Basin. The first-pass program, which included 1,264 metres of diamond drilling across three holes, was conducted to test newly identified electromagnetic (EM) conductors along the Groomes Lake Conductive Corridor. The drill program provided a critical step in defining high-priority uranium exploration targets associated with the Groomes Lake conductive features.

The Smart Lake Project is a joint venture between Cameco Corporation (73%) and Purepoint (27%) and is located approximately 60 km south of the former Cluff Lake uranium mine and 18 km west-northwest of Purepoint's Hook Lake JV project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Uranium Announces Flow-Through Private Placement

Purepoint Uranium Announces Flow-Through Private Placement

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced a non-brokered private placement (the "Offering") of up to 4,347,826 flow-through units (the "Flow-Through Units") at a price of $0.23 per unit for aggregate gross proceeds up to $1,000,000. Each Flow-Through Unit consists of one common share of the Company to be issued on a "flow through" basis pursuant to the Income Tax Act (Canada) (each a "Flow-Through Share") and one-half (12) of one common share purchase warrant. Each whole warrant entitles its holder to purchase one common share of the Company (each a "Warrant Share") at an exercise price of $0.30 per share for a period of 24 months from the date of issuance. Red Cloud Securities Inc. is acting as a finder in connection with the offering.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Mobilizing for Summer Uranium Drill Program at Dorado Project - Eastern Athabasca Basin

Purepoint Mobilizing for Summer Uranium Drill Program at Dorado Project - Eastern Athabasca Basin

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") is pleased to announce that mobilization is underway for the upcoming summer uranium drill program at its Dorado Project, part of the Purepoint-IsoEnergy Joint Venture in Saskatchewan's eastern Athabasca Basin. Drilling is scheduled to commence on or about May 26, 2025.

The Dorado Project covers over 150 kilometres of discreet electromagnetic (EM) conductors that lie within the Dorado Graphitic Domain-a structurally controlled package of conductive, graphite-rich rocks (Figure 1). The Dorado Domain encompasses the northeastern extension of the Larocque Trend, a highly prospective structural corridor that hosts multiple high-grade uranium deposits and occurrences, including IsoEnergy's Hurricane Deposit-recognized as the world's highest-grade published indicated uranium resource, with 48.6 million pounds at 34.5% U₃O₈ (https://www.isoenergy.ca/featured-project/). At Dorado, these graphitic rocks bifurcate and wrap around a granitic dome that is considered an important component in the original plumbing system that once directed the flow of uranium-bearing hydrothermal fluids.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Uranium Provides Q2 Corporate Update on Exploration Activities

Purepoint Uranium Provides Q2 Corporate Update on Exploration Activities

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") provided its Q2 corporate update on exploration activities across its portfolio of uranium projects in Canada's Athabasca Basin. This exploration update highlights the continued advancement of multiple high-priority targets as Purepoint executes on its 2025 exploration strategy alongside industry-leading joint venture partners.

Smart Lake Joint Venture (Cameco/Purepoint)

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Purepoint Uranium Commences Initial Drill Program Along Groomes Lake Conductive Corridor, Smart Lake JV Project

Purepoint Uranium Commences Initial Drill Program Along Groomes Lake Conductive Corridor, Smart Lake JV Project

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") is pleased to announce the commencement of a first-pass drill program along the high-priority Groomes Lake Conductive Corridor at the Smart Lake Joint Venture (JV) project in Saskatchewan's Athabasca Basin. The program will include four drill holes, totalling approximately 1,400 metres, to test the conductive belt of rocks refined by the 2024 ground electromagnetic (EM) survey.

The Smart Lake Project is a joint venture between Cameco Corporation (73%) and Purepoint (27%) and is located approximately 60 km south of the former Cluff Lake uranium mine and 18 km west-northwest of Purepoint's Hook Lake JV project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Schedules Start of Drill Program for Ivana Uranium-Vanadium Project

Blue Sky Uranium Schedules Start of Drill Program for Ivana Uranium-Vanadium Project

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSX-V: BSK) (FSE: MAL2) (OTC: BKUCF), ("Blue Sky" or the "Company") is pleased to announce that it has secured drill contractors and scheduled a start date of June 1 st 2025 for the previously announced drill programs to advance the Ivana Uranium-Vanadium Project (the " Project ").  As reported on May 14, 2025 Blue Sky's joint-venture operating company Ivana Minerales S.A., (" JVCO ", a partnership with Abatare Spain, S.L.U.) has planned a two-phase drilling campaign. The first phase will focus on infill drilling at the Ivana deposit, while the subsequent second phase will test satellite targets.  The entire campaign is expected to last approximately five months.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Baselode Reports Shallow Uranium Results from Summer 2024 Drill Program

Baselode Reports Shallow Uranium Results from Summer 2024 Drill Program

  • Six drill holes expand shallow uranium mineralization footprint in Pod 1 (i.e., within 50 metres from surface), eleven drill holes confirmed uranium starting within 100 metres from surface in three Pods
  • Shallow uranium mineralization updip of Pod 7 remains largely untested and requires further follow-up drilling

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to release uranium ("U3O8") assay results from all 28 drill holes of the 2024 drill program on the ACKIO prospect area ("ACKIO") in the Athabasca Basin ("Basin") area of northern Saskatchewan (Figure 1).

"We're especially encouraged with 6 drill holes intersecting uranium within 50 m from surface and 11 drill holes within 100 m from surface. These shallow mineralization results continue to demonstrate ACKIO's unique advantage in the Basin area with easily accessible, near-surface uranium. Last year's summer drill program successfully defined more shallow uranium mineralization to the north and south of our shallowest uranium zone, Pod 1. Uranium at the overburden-bedrock contact still remains open to the south and north.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano to Commence Extensive Summer 2025 Drilling Program at Preston Uranium Project

Skyharbour and JV Partner Orano to Commence Extensive Summer 2025 Drilling Program at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner, Orano Canada Inc. ("Orano"), will commence a large-scale diamond drilling program at the 49,635-hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The drilling program will consist of approximately 6,000 to 7,000 metres of drilling during the summer of 2025. Orano is the majority owner and operator at the project with Skyharbour owning a minority interest of approximately 25.6%.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Expands Drill Plan to Advance the Ivana Uranium-Vanadium Project

Blue Sky Uranium Expands Drill Plan to Advance the Ivana Uranium-Vanadium Project

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF), ("Blue Sky" or the "Company") is pleased to announce an update to the 2025 drill program to advance the Ivana Uranium-Vanadium deposit towards feasibility. The drill program is being planned and executed by Blue Sky's joint-venture operating company Ivana Minerales S.A., (" JVCO ", a partnership with Abatare Spain, S.L.U.).

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium

Purepoint Uranium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×