Positive Lithium Results Continue at Argentina Lithium's Second Drill Hole on Rincon West

Positive Lithium Results Continue at Argentina Lithium's Second Drill Hole on Rincon West

 
 

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQB Venture Market (OTC): PNXLF  

 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTC: PNXLF) ("Argentina Lithium" or the "Company") reports positive lithium brine values from the second diamond drill hole at its Rincon West Project in Salta Province Argentina . The Rincon West project covers 2,951.5 hectares of the salar basin, located west of the adjacent Rincon Project owned by Rio Tinto. The property is currently permitted for up to 9 exploration drill holes. The fourth exploration hole is currently in final steps to completion. The brine analytical results from the second hole have been received and are reported below.

 

 

  Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.) (CNW Group/Argentina Lithium & Energy Corp.) 

 
 

  "The results of the second exploration hole demonstrate remarkably consistent lithium grades, when compared to the first. RW-DDH-002 results reveal an impressive concentrated brine aquifer, tested with packer sampling over ~77% of the interval between 182 and 305 metre depths, with lithium values ranging from 337 to 367 mg/litre. Additional concentrated brines with lower lithium contents were also recovered from above this 118 metre interval. Drilling thus far validates that the adjacent lithium salar extends under our properties, with consistently high lithium grades. The drill program will continue as planned with the aim of delineating an initial lithium mineral resource." stated Miles Rideout , V.P. of Exploration.

 

The results of the brine analyses and the respective intervals from which brine was recovered are shown in Table 1. Drill collar information is presented in Table 2.

 

  Map 1 presents a map of the Rincon West property showing the positions of the four initial exploration holes, including RW-DDH-002 and the previously announced RW-DDH-001 (see   July 13, 2022 News Release ). Exploration drilling is ongoing. The map presents the completed drill locations overlaid on the conductive zones delineated with geophysics (see   May 2, 2022 News Release ).

 
 
                                                                                                             
 

   Table 1:  Interval data and results of brines analyses for lithium, potassium, and magnesium   

 

   for drill hole RW-DDH-002   

 
 

   Sample interval (m)   

 
 

   Sample method   

 
 

   Li   

 
 

   K   

 
 

   Mg   

 
 

   Density   

 
 

  top  

 
 

  bottom  

 
 

  Thickness  

 
 
 

  (mg/litre)  

 
 

  (g/ml)  

 
 

  112  

 
 

  155  

 
 

  43  

 
 

  single packer  

 
 

  247  

 
 

  4266  

 
 

  2196  

 
 

  1.144  

 
 

  182  

 
 

  207  

 
 

  25  

 
 

  single packer  

 
 

  361  

 
 

  6827  

 
 

  3050  

 
 

  1.2  

 
 

  208  

 
 

  239  

 
 

  31  

 
 

  single packer  

 
 

  337  

 
 

  6503  

 
 

  2844  

 
 

  1.19  

 
 

  255  

 
 

  267  

 
 

  12  

 
 

  single packer  

 
 

  366  

 
 

  7103  

 
 

  3053  

 
 

  1.204  

 
 

  287  

 
 

  293  

 
 

  6  

 
 

  single packer  

 
 

  362  

 
 

  7036  

 
 

  3028  

 
 

  1.21  

 
 

  296  

 
 

  305  

 
 

  9  

 
 

  single packer  

 
 

  367  

 
 

  7068  

 
 

  3047  

 
 

  1.21  

 
 
 
 
 
 
 
 
 
 

  61.3  

 
 

  65.2  

 
 

  3.9  

 
 

  double packer  

 
 

  22  

 
 

  323  

 
 

  256  

 
 

  1.016  

 
 

  67.3  

 
 

  71.2  

 
 

  3.9  

 
 

  double packer  

 
 

  68  

 
 

  1092  

 
 

  1029  

 
 

  1.05  

 
 

  154.3  

 
 

  158.2  

 
 

  3.9  

 
 

  double packer  

 
 

  122  

 
 

  2425  

 
 

  1093  

 
 

  1.076  

 
 

  175.3  

 
 

  179.2  

 
 

  3.9  

 
 

  double packer  

 
 

  243  

 
 

  4462  

 
 

  2007  

 
 

  1.146  

 
 

  217.3  

 
 

  221.2  

 
 

  3.9  

 
 

  double packer  

 
 

  348  

 
 

  6797  

 
 

  2956  

 
 

  1.19  

 
 
 

  *Drill hole RW-DDH-002 was drilled vertically to a depth of 323m below surface; the salar strata
are believed to be flat lying resulting in reported intervals approximating true thickness
 

 
  Technical Details  
 

Hole RW-DDH-002 was executed with diamond drilling (HQ-size), permitting the extraction of core samples of the salar basin formations and recovery of brine samples, where possible. Drilling was conducted between July 7 and July 22 , stopping at 323 metres depth in igneous basement rock units. Final sampling and lining the hole with 2" diameter PVC filters and casing were completed by July 25, 2022 . Drilling was carried out by Salta-based AGV Falcon Drilling SRL, under the supervision of Argentina Lithium's geologists.

 
 
                     
 

   Table 2:  RW-DDH-002 Collar Information   

 
 

   Hole ID   

 
 

   East   

 
 

   North   

 
 

   Elevation   

 
 

   Azimuth   

 
 

   Dip   

 
 

   Depth   

 
 
 

  UTM Zone 19S (WGS84)  

 
 

  (m)  

 
 

  (deg.)  

 
 

  (deg.)  

 
 

  (m)  

 
 

  RW-DDH-002  

 
 

  682198  

 
 

  7337700  

 
 

  3761  

 
 

  n/a  

 
 

  90  

 
 

  323  

 
 
 

Brine sampling was conducted using a single packer sampling unit during drilling. Upon completion of the drilling, selected intervals of the hole were re-sampled with a double packer system, permitting isolation of certain intervals. The packer sampling method allows the collection of brine samples at specific depths while sealing the hole at the top and bottom of the interval.

 

As anticipated by the exploration team, fresh water layers were found to overly the much denser concentrated brine aquifer. Recovered brine samples indicate relatively fresh water in the interval 61.3 to 65.2 metres depth, transitioning to brackish in the interval 67.3 to 71.2 m depth. Brine concentration increased below this level, as reported in Table 1. A number of additional packer sampling attempts from intervals outside of those reported in Table 1 did not return a sufficient quantity of brine considered representative for analysis.

 

No casing was required during drilling. Poorly consolidated gravels were logged from the surface to 23 m depth, where sandy sediments began. Black and dark sands were logged to 66 m depth, at which point sulphates appear, likely indicating the presence of the salar formation. Sandy units with bands of sulphates and gravels were logged from 66 m to 90 m depth, entering a silt layer logged between 90 m and 92 m . Dark sands with abundant layers of clays and occasional gravels were logged from 92 m to 154.25 m depths. Dark sands with abundant interbedding of sulphates continued from 154.25 m to 199 m depth. Sands with intercalated gravels were logged between 199 m and 236 m , followed by gravels logged to 245 m depth. At 245 m , the drill entered aplite (fine-grained igneous rock), displaying varying degrees of fracturing. Sulphates were observed from 66 m depth through the sediment units and within some fractures in the aplite. Metamorphosed quartzite was encountered from 293m , the upper 10 m with significant fracturing. The hole was stopped in metamorphosed quartzite at 323 m depth. All core samples recovered in drilling are retained for logging and are available for subsequent laboratory evaluation of factors such as total and effective porosity, permeability and other measurable characteristics of the aquifer formation.

 
  Analyses and QA/QC  
 

Samples of brine were submitted for analysis to Alex Stewart International Argentina S.A. ("Alex Stewart"), the local subsidiary of Alex Stewart International, an ISO 9001:2008 certified laboratory, with ISO 17025:2005 certification for the analysis of lithium, potassium and other elements. Alex Stewart employed Inductively Coupled Plasma Optical Emission Spectrometry ("ICP-OES") as the analytical technique for the primary constituents of interest, including boron, calcium, potassium, lithium, and magnesium. Measurements in the field included pH, electrical conductivity, temperature and density. The quality of sample analytical results was controlled and assessed with a protocol of blank, duplicate and reference standard samples included within the sample sequence. In addition, 11 samples including 1 blank and two standards were submitted for re-analysis at Alex Stewart. The blank (2), duplicate (1) and re-submitted samples (8) analysed at Alex Stewart all reported in the acceptable range. A low-grade and medium-grade reference standard were included in the initial and second submission to Alex Stewart. The low-grade reference standard analyses were within the acceptable range of 2 standard deviations (SD) and with less than 2% relative percent difference (RPD); the medium-grade standard returned results less than 3 SD, but with a low RPD (1.75% and -3.25%).

 

As well, two duplicate check samples were submitted to SGS Argentina and also analyzed by ICP-OES. Initial results were significantly higher than expected and the samples were re-run in addition to a low-grade standard sample. The lithium grades from the re-analysis of the check samples correlated well with the grades reported by Alex Stewart; the standard sample, however, returned a grade 15% below the acceptable lithium value for the standard. Further investigation to determine the cause of this standard failure is ongoing.

 
  Rincon West Project  
 

The Rincon West Project comprises the following properties: Villanoveño II and Demasia Villanoveño II, totaling 2491 hectares, are held under an option whereby the Company can earn a 100% interest, as described in the Company's   September 28, 2021 News Release . Argentina Lithium has also purchased the 460.5 hectare Riconcita II property, adjacent to Villanoveño II, (see   August 25, 2022 News Release ).

 
  Corporate Update: New Stock Option Plan and Equity Incentive Plan  
 

On August 12, 2022 , the Company adopted a 10% rolling stock option plan (the "Stock Option Plan") and a restricted share unit, performance share unit and deferred share unit plan (the "Equity Incentive Plan"). The number of common shares of the Company reserved for issuance under the Stock Option Plan cannot exceed 10% of the number of common shares of the Company that are outstanding on each applicable grant date, and 7,416,012 common shares of the Company are reserved for issuance under the Equity Incentive Plan.

 
  Qualified Person  
 

  David Terry , Ph.D., P.Geo. is the Company's Qualified Person as defined in National Instrument 43-101. Dr. Terry is responsible for oversight of the Company's early-stage exploration at the Rincon West property. The disclosure in this news release has been reviewed and approved by Dr. Terry.

 
  About Argentina Lithium  
 

 Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them toward production in order to meet the growing global demand from the battery sector. The management group has a long history of success in the resource sector of Argentina and has assembled a first-rate team of experts to acquire and advance the best lithium properties in the "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

 

ON BEHALF OF THE BOARD

 

"Nikolaos Cacos"
_______________________________
Nikolaos Cacos , President, CEO and Director

 

  Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

 

  This news release may contain forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.  

 

  Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: the impact of COVID-19; risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations.   Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's public disclosure documents for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.  

 
 
 

 Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/positive-lithium-results-continue-at-argentina-lithiums-second-drill-hole-on-rincon-west-301638384.html  

 

SOURCE Argentina Lithium & Energy Corp.

 

 

 

 Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/October2022/03/c3574.html  

 
 

News Provided by Canada Newswire via QuoteMedia

LIT:CA
The Conversation (0)
Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Visit Argentina Lithium and Energy (TSXV: LIT) (OTCQB: LILIF) at Booth #2924 at the Prospectors & Developers Association of Canada's (PDAC) Convention at the Metro Toronto Convention Centre (MTCC) from Sunday, March 2 to Wednesday, March 5, 2025.

 

About Argentina Lithium and Energy

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

 
 

 TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3
OTCQB Venture Market: LILIF  

 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQB: LILIF), ("Argentina Lithium" or the "Company") reports positive results from the fourteenth exploration well at its Rincon West Project in Salta Province Argentina . Sixteen representative 2.5 or 3 m brine samples collected over a 225-metre interval of RW-DDH-14 ranged from 277 to 379 mgl lithium.

 

 

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

 
 

  /NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/  

 

 TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF  

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

 
 

 TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3  

 

  /NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/  

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Applies to Extend Warrants November 06, 2024

Argentina Lithium Applies to Extend Warrants November 06, 2024

 
 

 TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FRA): OAY3
OTCQX Venture Market (OTC): PNXLF  

 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") announces that the Company has made an application to the TSX Venture Exchange to extend the term of the outstanding warrants as follows:

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  PV SOLAR CELL Recycling Acquisition Legal Due Diligence Complete

Lithium Universe Ltd PV SOLAR CELL Recycling Acquisition Legal Due Diligence Complete

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce that further to its announcement dated 18 June 2025 (Announcement), it has now completed legal due diligence to its absolute satisfaction. As such, the Company is now progressing towards completion of the Acquisition (defined below).

ACQUISITION DETAILS

As detailed in the Announcement, the Company has entered into a binding agreement to acquire the global rights to commercially exploit a patented photovoltaic (PV) solar panel recycling technology known as Microwave Joule Heating Technology. The rights will be secured via an exclusive licensing agreement with Macquarie University (MQU), held through an Australian-incorporated holding company, New Age Minerals Pty Ltd (NAM). The transaction will be effected by the Company acquiring 100% of the issued share capital of NAM (Acquisition).

As disclosed in the Announcement, completion of the Acquisition was conditional on the Company completing legal due diligence. This has now been completed to the satisfaction of the Company.

Completion was also conditional on the Company, NAM and MQU entering into a variation to the licensing agreement to reflect the change in ownership of NAM. The parties have since agreed in writing to waive this condition to allow completion of the Acquisition to proceed, with the variation to be entered into with MQU as soon as practicable following completion.

The Company will now proceed to the acquisition of NAM.

 

About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.

 

 

Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Western Uranium & Vanadium Announces Results of AGM and Appoints New Transfer Agent

Western Uranium & Vanadium Announces Results of AGM and Appoints New Transfer Agent

 

Western Uranium & Vanadium Corp. (CSE: WUC) (OTCQX: WSTRF) ("Western" or the "Company") is pleased to announce the results of the Company's Annual General and Special Meeting of shareholders (the "Meeting") held in Nucla, Colorado on June 27, 2025.

 

Proxy votes were cast for common shares representing approximately 51% of the issued and outstanding common shares of the Company as at the record date for the Meeting. Each of the other matters put forward before shareholders for consideration and approval at the Meeting, as described in the Company's management information circular dated May 22, 2025, was duly approved by the requisite number of votes.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
SAGA Metals Appoints Accomplished Mining Executive Peter Hogendoorn to Board of Advisors and Engages Xander Capital Partners

SAGA Metals Appoints Accomplished Mining Executive Peter Hogendoorn to Board of Advisors and Engages Xander Capital Partners

 

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical minerals discovery, is pleased to announce the appointment of seasoned mining executive Peter Hogendoorn to its Board of Advisors, along with a key investor relations partnership aimed at elevating shareholder engagement and corporate visibility.

 

  Appointment of Peter Hogendoorn to Board of Advisors  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×