Olympio to Resume Drilling at Bousquet Gold Project, Earns 51% interest

Bullion Gold Resources Corp. (TSXV: BGD,OTC:TTEXF) ("Bullion" or the "Company") is pleased to announce that optionee Olympio Metals Limited (ASX: OLY) ("Olympio") is resuming drilling activities (Phase 3 drilling campaign) at the Bousquet Gold Project following completion of the requirements to earn an initial 51% interest in the project pursuant to the option agreement between the parties. The Bousquet Gold project is located on the prolific Cadillac Larder Lake Fault approximately 30 kilometers east of Rouyn-Noranda, Québec, and benefits from existing infrastructure and major Abitibi gold operations including LaRonde and Westwood.

Key points of the news release:

  • The Phase 3 drilling campaign will test the lateral extension of the bonanza intercept of 19.4 m grading 17.29 g/t Au from 172.5 m in the Main Lode system and subsequently test the down plunge extension;

  • Field work includes a televiewer survey to confirm the structural links between holes; and

  • Olympio reached the milestone required to earn 51% ownership of the Bousquet Gold Project.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10471/298980_d09b2f6a243368fb_002.jpg

Plan view map of the Paquin and Amadee prospects

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10471/298980_d09b2f6a243368fb_002full.jpg

Simon Britt, president and CEO: "We welcome the continuation of exploration activities following outstanding results delivered from Olympio's Phase 2 drilling campaign on Bousquet. The 51% interest earn-in (Stage 1) was completed ahead of schedule and we fully expect they will earn the remaining 29% interest (Stage 2) ahead of the next 5 years milestone payments and required exploration expenditures."

Olympio can earn an additional 29% interest (Stage 2) on the Bousquet Gold project ("Bousquet") over the next 5 years, through option payments and exploration expenditures totaling:

  • C$500,000;

  • C$250,000 worth of Olympio shares;

  • C$1,000,000 in exploration expenditures on Bousquet; and

  • The agreement provides Olympio with flexibility to accelerate these commitments.

If Stage 2 conditions are met by Olympio, a Joint Venture ("JV2") will be formed:

  • Olympio's interest in the JV2 will be 80%;

  • Olympio will sole fund Bullion's JV2 20% expenditures until initial production on Bousquet;

  • Bullion's 20% interest is free carried until initial production on Bousquet; and

  • OLY will retain a right of first refusal to purchase Bullion's JV2 20% interest.

Qualified Person

The scientific and technical information disclosed in this news release has been reviewed and approved by Ms. Suzie Tremblay, a member in good standing of the Ordre des géologues du Québec (OGQ No. 10664), who is a "Qualified Person" within the meaning of National Instrument 43-101 - Standards of Disclosure for Mineral Projects. All geoscientific activities related to the Bousquet Gold project are carried out under the supervision of Ms. Suzie Tremblay, Vice President of Explo-Logik.

About Bullion Gold Resources Corp.

Bullion Gold Resources Corp. (TSXV: BGD,OTC:TTEXF) is a junior mining exploration company conducting exploration activities in Quebec, primarily in the Abitibi and James Bay mining regions. The Company holds a 100% interest in the Terragold (Au), Langlade (Cu, Zn, Au, Ag), and Bodo (Cu, Zn, Au, Ag) projects. The Bousquet (Au) project is under option to Olympio Metals (ASX: OLY).

A new corporate website is currently under construction and is expected to be launched in the coming weeks.

For further information, please contact:

Simon Britt
President and CEO
Bullion Gold Resources Corp.
sbritt@bulliongold.ca

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain information and statements that may constitute "forward-looking information". Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates", "aims", "targets" or "believes", or variations of, or the negatives of, such words and phrases or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. Inherent in forward-looking statements are risks, uncertainties and other factors beyond the Corporation 's ability to predict or control. All statements, other than statements of historical facts, included in this news release that address future events, developments or performance that Bullion expects to occur are forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/298980

News Provided by TMX Newsfile via QuoteMedia

BGD:CC
The Conversation (0)
Canadian Maple Leaf gold coin floating over stacked gold bars with glowing red lights.

Top 5 Junior Gold Mining Stocks on the TSXV in 2026

Junior gold stocks are seeing heightened interest in 2026 despite volatility in the gold price, which reached a new record high of nearly US$5,600 per ounce during the first quarter.The gold price may have fallen to the US$4,000 level in the second and third quarters, but plenty of upside... Keep Reading...
Horizon Gold

Quarterly Activities Report for the Period Ended 30 September 2026

Horizon Gold Limited (ASX : HRN) (‘Horizon’ or ‘Company’) is focussed on progressing its exploration and development activities at the 100%-owned Gum Creek Gold Project (‘Gum Creek’ or the ‘Project’) located in the Mid-West Region of Western Australia (Figure 1). Gum Creek has historically... Keep Reading...
Cerrado Gold Reports 21% Year-Over-Year Increase in Q3 2026 Production Results at Minera Don Nicolas

Cerrado Gold Reports 21% Year-Over-Year Increase in Q3 2026 Production Results at Minera Don Nicolas

Strong Production of 16,685 Gold Equivalent Ounces ("GEO") for the 3rd Quarter 2026, up 21% from Q3/25 Production of 44,942 GEO Year-to-Date Exploration is ongoing, with a key focus now on the Falcon property to support resource growth for a new Preliminary Economic Assessment targeted for late... Keep Reading...
Gold letters spelling "Fed" in front of a pile of gold dollar coins and US flag.

Gold Price Falls, Then Recovers After Fed Keeps Rates Steady

The gold price fell on Wednesday (October 28) after the US Federal Reserve kept interest rates unchanged.The Federal Open Market Committee voted 10 to two to keep its benchmark interest rate at 3.75 to 4 percent. Fed officials Lisa D. Cook and Beth M. Hammack dissented and called for a 0.25... Keep Reading...
Pile of gold bars over black background.

5 Best-performing Gold Stocks on the TSX in 2026

The gold price hit record highs of over US$5,500 per ounce in January 2026, and while its price has pulled back, it has largely held above the US$4,000 mark since it first broke through that point in September 2025.Gold's growth may have been stalled by a variety of factors, including widespread... Keep Reading...
Map detail showing BC and Alberta with cities marked, bordered by blue ocean and green land areas.

Osisko Gold Reports Progress at Cariboo Project in BC

Osisko Gold Group (TSXV:OGG,NYSE:OGG) announced that as of September 30, construction of its Cariboo gold project in Central BC is 28 percent complete, based on costs incurred.By the end of September, the company had incurred C$355 million in project costs, while the estimated remaining cost to... Keep Reading...

Interactive Chart

Latest Press Releases

Related News