Noram Lithium Announces Appointment of Vice President, Project Development

Noram Lithium Announces Appointment of Vice President, Project Development

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announced today it has appointed Mr. Glenn Barr as Vice President, Project Development, effective immediately

Mr. Barr has more than 25 years of experience in complex mining project development. Most recently he was Vice President, Project Development at Twin Metals Minnesota (TMM). His work included leading engineering studies, overseeing metallurgical test work programs and integrating environmental protection measures into project design. Prior to TMM, he held various roles at Stantec and Teck. As an Engineering Liaison at Stantec, he guided the environmental and engineering consultants in ensuring alignment and work efficiencies. While at Teck, he was integral in the development and commercialization of a novel hydrometallurgical process, and was a key member of the team that engineered and constructed a hydrometallurgical processing plant in Brazil. Mr. Barr holds a Bachelor of Science, Chemistry from the University of Victoria.

"We welcome Glenn to noram to the newly created position of Vice President, Project Development," stated Greg McCunn, CEO of noram. "His extensive experience with flowsheet development, engineering studies and the permitting environment in the United States will be instrumental to our continued de-risking of the Zeus Lithium Project. Glenn's initial focus will be managing the Prefeasibility Study for Zeus being led by Ausenco."

About noram lithium corp.

noram lithium corp. (TSXV: NRM| OTCQB: NRVTF | Frankfurt: N7R) is focusing on advancing its 100%-owned Zeus Lithium Project located in Clayton Valley, Nevada an emerging lithium hub within the United States. With the upsurge in the electric vehicle and energy storage markets the Company aims to become a key participant in the domestic supply of lithium in the United States. The Company is committed to creating shareholder value through the strategic allocation of capital and is well-funded with approximately CAD$14 million in cash on December 31, 2022 and no debt.

About the Zeus Project (100% noram)

The Zeus Lithium Project contains a Measured and Indicated resource estimate of 5.2 Mt Lithium Carbonate Equivalent ("LCE", 1034 Mt at 941 ppm lithium), and an additional Inferred resource estimate of 1.1 Mt LCE (235 Mt at 871 ppm lithium) utilizing a 400 ppm Li cut-off1.

Please visit our web site for further information: www.noramlithiumcorp.com.

Footnote
1 Updated Resource Estimate Zeus Project, ABH Engineering (December 2022).

Qualified Person

The technical information contained in this news release has been reviewed and approved by Brad Peek, M.Sc., CPG, who is a Qualified Person with respect to noram's Zeus Lithium Project as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, and also Vice President of Exploration for noram.

ON BEHALF OF THE BOARD OF DIRECTORS

Sandy MacDougall
Founder and Executive Chairman
C: 778.999.2159

For additional information please contact:

Greg McCunn
Chief Executive Officer
greg@noramlithiumcorp.com
C: 778.991.3798

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward Looking Information

This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, plans for ongoing development of the Zeus Lithium Project. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes, results of further exploration work, and availability of capital on terms acceptable to the Company. Although noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: noram lithium corp.



View source version on accesswire.com:
https://www.accesswire.com/749213/Noram-Lithium-Announces-Appointment-of-Vice-President-Project-Development

News Provided by ACCESSWIRE via QuoteMedia

NRM:CA
The Conversation (0)
Noram Lithium Provides Update

Noram Lithium Provides Update

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is providing a corporate update and an update on its 100% owned Zeus Lithium Project ("Zeus" or the "Project"), located in Clayton Valley, Nevada

Zeus Lithium Project Update

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Engages CDMG for Marketing Services

Noram Lithium Engages CDMG for Marketing Services

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announces that it has engaged Creative Direct Marketing Group Inc. ("CDMG") to provide the Company with marketing services and to raise public awareness of the Company

"A leader in targeted advertising, Creative Direct Marketing Group, Inc is a full-service, direct response advertising and digital marketing agency with one goal in mind: increasing your response, market presence, and profits through ‘accountable advertising.' For more than 40 years, we've helped turn entrepreneurial start-ups into large companies and large companies into multibillion-dollar businesses" commented CDMG.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Engages Ausenco To Complete the Pre-Feasiblity Study for the Zeus Lithium Project

Noram Lithium Engages Ausenco To Complete the Pre-Feasiblity Study for the Zeus Lithium Project

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announces it has engaged Ausenco Engineering Canada Inc. ("Ausenco") to lead the Pre-Feasibility Study ("PFS") of its 100% owned Zeus Lithium Project ("Zeus" or the "Project") in Clayton Valley, Nevada

The Company recently engaged SRK Consulting Inc ("SRK") to produce an optimized mine plan for Zeus (see news release dated February 7, 2023) and initiated a further round of metallurgical testing with Kemetco Research Inc ("Kemetco") to confirm and refine the process design for the Project (see news release dated February 14, 2023). Both of these ongoing work streams will form the basis of the PFS, now being managed by Ausenco.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Files NI43-101 Technical Report for Zeus Lithium Project

Noram Lithium Files NI43-101 Technical Report for Zeus Lithium Project

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announced today that it has filed on SEDAR a National Instrument 43-101 ("NI 43-101") technical report (the "Report") titled "Updated Resource Estimate Zeus Lithium Project". The technical report supports the updated Mineral Resource Estimate announced on January 30, 2023 and is available for review on both SEDAR (www.sedar.com) and the Company's website (www.noramlithiumcorp.com). There are no material differences in the mineral resources reported in the news release of January 30, 2023 and those described in the report

About noram lithium corp.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Announces Results From 2023 Annual General Meeting

Noram Lithium Announces Results From 2023 Annual General Meeting

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announces that all motions put forward for approval at its 2023 Annual General Meeting held March 14th in Vancouver, British Columbia (the "AGM") were passed

2023 Annual General Meeting Results

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
VIDEO: Lithium Universe Limited  Alex Hanly CEO Interview - Becancour Refinery Project

VIDEO: Lithium Universe Limited Alex Hanly CEO Interview - Becancour Refinery Project

Melbourne, Australia (ABN Newswire) - In this interview, Lithium Universe Limited (ASX:LU7) CEO Alex Hanly talks about the company's business strategy, government engagement and fieldwork around the Becancour Lithium Refinery Project.

The project is advancing well and remains on track. Key milestones include finalizing the plant layout, issuing technical specifications for capex estimation, and progressing with supplier quotation activities. Environmental site visits and studies are ongoing, with no significant issues identified. Hatch's transition from Brisbane to Montreal offices is smoothly underway, ensuring continuity in project management. Early contractor engagement and strategic risk assignment are mitigating potential delays. Overall, the project is adhering to its timeline, with significant progress in engineering and procurement, ensuring readiness for a capital cost estimate and commitment to ensure environmental compliance with the regulatory framework.

To Watch the Video Interview, please visit:
https://www.abnnewswire.net/lnk/05GX0H86



About Lithium Universe Ltd:

Lithium Universe Ltd (ASX:LU7) (OTCMKTS:ESMAF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.



Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Applies to Extend Warrants

Argentina Lithium Applies to Extend Warrants

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") announces that the Company has made an application to the TSX Venture Exchange to extend the term of the outstanding warrants as follows:

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
GMV Minerals Inc. Reaffirms Commitment to Mexican Hat Gold Project - Drill Permit Received for Nevada Project

GMV Minerals Inc. Reaffirms Commitment to Mexican Hat Gold Project - Drill Permit Received for Nevada Project

GMV Minerals Inc. (the "Company" or "GMV") (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce the following update

The Company continues to be highly encouraged by its primary core project known as the Mexican Hat gold deposit located in SE Arizona. The Company's Preliminary Economic Assessment" PEA" reports 36.7 million tonnes grading 0.58 gpt gold in a 688,000 ounce Inferred Mineral Resource. An open pit with a 1.87:1 strip ratio was modeled to extract 32.6 million tonnes of this deposit recovering 525,000 ounces of gold over a 10-year mine life. This is a low capital cost operation, total cost of US$67.8 million, which includes US$12 million in contingency and US$13 million in sustaining capital. Heap leach testing demonstrates an exceptional recovery of 88% of the gold from a two-stage crushing circuit.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Victory Updates Management

Victory Updates Management

Victory Battery Metals CORP. (CSE:VR)(OTC PINK:VRCFF)(FWB:VR6) is pleased to announce that its board of directors now consist of Gerald Tritt, David Stadnyk and George Tsafalas, all of Vancouver, BC. David Stadnyk has assumed the role of president and CEO. The Company intends to close its recently announced Yellow Chief Uranium acquisition in the next 10 days

The Company wishes to thank Mark Ireton for his service to the company and wishes him well in his future endeavors.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CENTURY LITHIUM CHANGES PROJECT NAME TO ANGEL ISLAND MINE

CENTURY LITHIUM CHANGES PROJECT NAME TO ANGEL ISLAND MINE

Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or the Company) announces it has changed the name of its 100%-owned Clayton Valley Lithium Project in Nevada, USA to the Angel Island Mine (the Project). In April 2024 the Company announced a positive Feasibility Study for the Project, making it one of the few advanced lithium projects being developed in the United States . As the Company now continues to work towards permitting the Project, regulators encouraged a name change for clarity in the permitting process. The Angel Island name distinguishes it from other mining and energy projects in the area by using the name of a topographical feature from the Project.

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Brunswick Exploration Outlines New Spodumene Rich Boulder Trains at Mirage and Launches Summer Drill Campaign

Brunswick Exploration Outlines New Spodumene Rich Boulder Trains at Mirage and Launches Summer Drill Campaign

Brunswick Exploration Inc. (" BRW " or the " Company ") is pleased to announce the completion of the 2024 prospecting program and start of a 5,000-metre summer drill program at the Mirage Project, located in the Eeyou Istchee-James Bay region of Quebec. To date, 71 drill holes and more than12,000 meters have been drilled on the Mirage project which have delineated nine near-surface spodumene-bearing pegmatite dykes, all of which remain open at depth and along strike. Approximately two dozen additional dykes, with widths ranging from 8 metres to approximately 20 metres, have also been intercepted in the two previous campaigns with minimal to no follow-up work. The proposed program will focus on MR-6, MR-3 and MR-4 as well as new targets that were delineated using drilling, geophysics, till mineralogy and prospecting.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×