- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Nomgon CBM Pilot Operations Update
Elixir Energy Limited(“Elixir” or the “Company”) is pleased to provide an operations update on the extended pilot production project (the “Nomgon Pilot Project”) currently underway in its 100% owned Nomgon IX Coal Bed Methane (CBM) Production Sharing Contract (PSC) in the South Gobi Basin, Mongolia.
HIGHLIGHTS
- Nomgon Pilot Project to be expanded
- Nomgon-9 well back producing after successful workover
- Exploration drilling to commence shortly
Given the results achieved to date, the Board of Elixir is encouraged that the Project is on the path to commerciality and has therefore resolved to expand the Pilot Project through:
- An extension of the flow period.
- The drilling of an additional pilot well.
Elixir’s strong view is that the commerciality of CBM in the Mongolian context has material advantages over the likes of Australia, given comparatively much lower drilling costs and access to gas prices that reflect the East Asian region is an LNG importer rather than exporter.
The company completed the workover of the 2 well Pilot Project in Nomgon IX in early April 2023. This involved the existing completions being removed, cleaned out and replaced. Smaller pumps, which are more suited to the actual water flow-rates, were installed. The pumps and associated gauges were placed lower in the wellbore to allow for the fluid levels to be lowered to below the level of the coal seam.
The Nomgon-9 well has successfully been brought back into production, with various experiments being conducted to control rates (which have ranged up to 76,000 standard cubic feet per day) whilst monitoring the back pressure and fluid (water) level in the well.
Water flow rates have remaining stable in the last few weeks at ~105 barrels of water per day, which is a strong indicator of increased desorbed gas flows emerging in the future.
In the multi-decade CBM related experience of the Directors of Elixir, the varying patterns of fluid (gas and water) flows from the Pilot is commonplace in CBM projects globally.
The Nomgon 8-well is currently shut in and is being primarily used as a monitoring well to measure interference pressure.
A new Pilot Well (Nomgon-10) is now planned to add to the data set to be gained from the Nomgon Pilot Project. Elixir is currently evaluating the optimal drilling contractor selection for this well in the context of its other drilling plans for 2023.
Elixir’s 2023 exploration drilling campaign is due to start shortly. Mongolian owned and operated Top Diamond Drilling LLC (who Elixir has used in the previous 2 years) is the successful tenderer for the Company’s 5 well exploration program.
Once certain regulatory processes have been closed out (expected in the next week or so), the 2023 exploration drilling program will commence. The formal regulatory process for the preferred tenderer for the Company’s 2023 appraisal program is also nearing completion.
Elixir’s Managing Director, Mr Neil Young, said: “We are pleased to announce an expansion of the Nomgon Pilot Project. Our strategy to invest in Mongolian CBM rests on the strong regional combination of high gas prices and low costs and the results to date are highly encouraging in this context.”
Click here for the full ASX Release
This article includes content from Elixir Energy, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Elixir Energy Investor Kit
- Corporate info
- Insights
- Growth strategies
- Upcoming projects
GET YOUR FREE INVESTOR KIT
Elixir Energy
Overview
Elixir Energy (ASX:EXR) is a gas exploration and development company currently focused on its portfolio of natural gas assets in Queensland, Australia and Mongolia. As an early mover in both areas, Elixir Energy has been the first company ever to free-flow gas from the deep Taroom Trough in Queensland and flow gas of any description in Mongolia.
Elixir Energy’s Grandis Gas project in Queensland is located in the Taroom Trough in the Southern Bowen Basin, where Australia’s premier physical and commercial gas hub – Wallumbilla – is immediately adjacent. Market factors are now driving new rounds of drilling in the Taroom Trough contributing to its reputation as an emerging energy super basin with major electricity as well as gas infrastructure.
A successful free-flowing test was conducted on the Lorelle Sandstone and has indicated it could produce a commercial flow rate of gas, with the breakeven commercial initial flow rate estimated at 2.5 million cubic feet per day.Gas flow from Stage 1 Lorelle Sandstone post stimulation
Elixir Energy’s Nomgon coal-bed methane (CBM) project is located in Mongolia.
The Nomgon CBM project is in the South Gobi region of Mongolia and on the Chinese/Mongolian border. The ideal location of the asset provides access to excellent infrastructure, including planned pipelines and local mines as customers. The Nomgon project includes a CBM pilot production plant, which flowed gas in its early stages and is now moving to progressively de-water with a view to building up a sustained gas flow rate.
The company is led by a highly experienced team with direct histories in Queensland, Australia and Mongolia and expertise in the natural resources industry, community engagement and working with government stakeholders.
Company Highlights
- Elixir Energy (ASX:EXR) is an exploration and development company with energy assets in Australia and Mongolia, targeting natural gas and renewable energy/hydrogen.
- The company’s Grandis Gas project in Queensland is located in an established gas and oil region, with exceptional access to existing infrastructure and high gas prices.
- The region is currently hosting multi-operator activity, including by Shell.
- Elixir has discovered a deep free-flowing gas zone in Grandis – the first of its kind.
- The company was also the first to flow natural gas in Mongolia, pioneering production in the country.
- A management team with a wide range of expertise in the natural resources sector provides leadership for maximising the value of Elixir Energy’s assets.
Key Projects
Grandis Gas Project
The company’s asset in Queensland, Australia, covers approximately 1,000 square kilometers in an established oil and gas province. The project is well-suited for cost-effective transportation to domestic and international gas markets.
Project Highlights:
- Strong Local Infrastructure: The region's long history of oil and gas production has resulted in a robust infrastructure, including gas transportation and electricity transmission access – and community support for the industry.
- Adjacent to Current and Proposed Pipelines: The asset is located close to existing – and proposed gas pipelines to assist in efficient and low-cost transportation as production commences.
- Impressive Initial Flow Test Results: After a successful suite of DFITs, free-flowing test on the Lorelle Sandstone has been successfully stimulated. Elixir’s technical and economic modeling indicates the Lorelle Sandstone alone could produce a commercial flow rate of gas, with the breakeven commercial initial flow rate estimated at 2.5 million cubic feet per day.
- Project Expansion: In August 2024, Elixir was formally awarded a 100 percent working interest in ATP 2077 by the Queensland Government. The area is prospective for both deep and shallow gas, with an independently certified 2C resources of 173 billion cubic feet.
Daydream-2 Lorelle Sandstone Flow Testing*
Nomgon CBM Project
Elixir Energy’s 100-percent-owned coal-bed methane (CBM) project is ideally located in the South Gobi region of Mongolia. This location gives the asset access to robust local infrastructure and close access to Chinese energy markets – the world’s largest.
Project Highlights:
- CBM Pilot Project In Production: The pilot plant passed a key production milestone of 200,000 square cubic feet per day in its early stages. Water production has progressed since these early flows with a view to de-pressuring the CBM reservoir, leading to sustained gas flows.
- District-scale Asset: The Nomgon project covers a significant 30,000 square kilometers in Mongolia. Initial exploration campaigns have been promising and indicate the potential for the asset to become a significant producer of regional energy markets.
Management Team
Richard Cottee - Non-executive Chairman
Richard Cottee was appointed as the non-executive chairman of the company on April 29, 2019. Cottee was the managing director of coal-seam-gas(CSG)-focused Queensland Gas Company (QGC) during its growth from a $20-million market capitalization junior explorer through to its acquisition by BG Group for $5.7 billion. QGC’s CSG assets are now operated by Shell and produce gas that is sold to China and other LNG markets.
Originally a lawyer, Cottee has spent the vast majority of his career in senior executive roles in the energy industry, including as CEO at CS Energy, NRG Europe, Central Petroleum and Nexus Energy. A 32-year veteran of the industry, Cottee is a strong business development professional and a graduate of The University of Queensland.
Neil Young - Managing Director and Chief Executive Officer
Neil Young was appointed to the board of Elixir on December 14, 2018, as its chief executive officer. Young has more than 20 years of experience in senior management positions in the upstream and downstream parts of the energy sector, focusing on business development, new ventures, gas marketing and general commercial functions. He has worked for a range of companies in the UK and Australia, including EY, Tarong Energy and Santos. Young founded Golden Horde Ltd in 2011 to explore gas on the Chinese border in Mongolia. He has also developed various new ventures in other countries including Kazakhstan, Japan and the USA. Young has an M.A. (Hons) joint degree in economics/politics from the University of Edinburgh.
Stephen Kelemen - Non-executive Director
Stephen Kelemen was appointed as the non-executive director of the company on May 6, 2019. Kelemen led Santos’ coal seam gas (CSG) team from its inception in 2004 and drove the growth in this area that allowed Santos to become one of Australia’s leading CSG companies.
An engineering graduate from Adelaide University, Kelemen served Santos for 38 years in multiple technical and leadership roles.
Kelemen is currently an adjunct professor at the University of Queensland’s Centre for Coal Seam Gas and also acts as a non-executive director on the boards of Galilee Energy (ASX:GLL) and Advent Energy.
Anna Sloboda - Non-executive Director
Anna Sloboda was appointed as the non-executive director of the company on October 1, 2020. Sloboda is a joint Belarusian/Australian citizen and has more than 20 years of experience in corporate finance, and in developing junior resource companies operating around the world.
Sloboda is currently an executive director of Red Citadel Resources Pty Ltd, a privately owned mineral resources exploration company with a range of projects in Africa and South America.
She also serves as an advisory committee member, maritime archaeology, at the Western Australian Museum.
Previously she was a co-founder of Trans-Tasman Resources and in that capacity had substantial experience in dealing with Chinese off-takers and partners. Other prior employers include Lehman Brothers, Clough and Curtin University.
Sloboda has a Master of Economics from Belarusian University and an executive MBA from Melbourne Business School.
Victoria Allinson - Company Secretary and Chief Financial Officer
Victoria Allinson is a fellow of The Association of Certified Chartered Accountants, a fellow of the Governance Institute of Australia and an NSX-nominated advisor. She has more than 30 years of accounting and auditing experience, including senior accounting positions in a number of listed companies and was an audit manager for Deloitte Touche Tohmatsu. Allinson has gained professional experience while living and working in both Australia and the United Kingdom.
Her previous experience has included being company secretary and CFO for a number of listed companies, including ASX-listed: Kiland, Safety Medical Products, Marmota Limited, Centrex Metals, Adelaide Energy, Enterprise Energy NL, and Island Sky Australia as well as several unlisted companies.
High grade Assay Results Continue at Youanmi
West Australian gold exploration and development company, Rox Resources Limited (“Rox” or “the Company”) (ASX: RXL), has received the final batch of assays from its 11,000m DD and RC program at the Youanmi Gold Project in WA.
- The latest batch of assays have been received from the 11,000m drilling program (both diamond core and reverse circulation) at the high gold-grade Youanmi Gold Project, located centrally in Western Australia’s prolific gold fields
- The recently-completed infill/exploration program aimed to improve resource confidence and open up corridors for resource growth; to underpin the Definitive Feasibility Study (DFS), and, additionally, provide sample material for ongoing metallurgical optimisation test-work for the DFS program
- Latest highlights from the program include:
- RXDD131: 4.38m @ 19.07 g/t Au from 387.98m,
- incl. 1.73m @ 41.43 g/t Au from 389.96m
- RXDD119: 4.56m @ 14.60 g/t Au from 220.64m
- RXDD115: 2.99m @ 21.11 g/t Au from 249.88m
- RXDD119: 4.0m @ 7.37 g/t Au from 162.0m
- RXDD132: 7.19m @ 3.90 g/t Au from 263.61m
- RXDD133: 2.83m @ 6.53 g/t Au from 431.00m
- RXDD128: 3.82m @ 4.51 g/t Au from 364.59m,
- incl. 1.73m @ 8.22 g/t Au from 364.59m
- incl. 1.73m @ 8.22 g/t Au from 364.59m
- RXDD122: 0.95m @ 13.50 g/t Au from 204.44m
- §These results further demonstrate the continuity of high- grade gold mineralisation along the Youanmi greenstone belt belt, and the potential for resource growth both at depth and along-strike, with discovery potential to the south
- 35,000m Step-up drill campaign well underway with the plan to bring forward ounces and increase the mine plan
The program focused on converting Inferred stopes at Pollard, United North and Youanmi Main to higher confidence Indicated classification and providing material for metallurgical testing for the upcoming Definitive Feasibility Study (DFS) – on track for H2 CY25.
This final consignment of diamond assay results are the fourth batch of assays results returned from the drill program and have been entirely drilled from the Pollard, Youanmi and United North areas (Figure 1).
Rox Resources’ Chief Executive Officer, Phillip Wilding, commented:
“It’s pleasing to round out the 11,000m RD and DD drilling program with another batch of excellent intercepts.
“More importantly, the program has significantly improved our knowledge of the high grade and underexplored Youanmi ore system, and shown that mineralisation remains open at depth.
“Next steps are to convert Inferred areas of the Resource to the higher confidence Indicated classification, and finalise key intercepts of sample material for metallurgical test work to feed into the Youanmi DFS.
“We are excited to have commenced the 35,000m Step-up program to potentially bring forward ounces in the mine plan and significantly increase the size of the Pollard ore zone.”
Youanmi Major Growth Drill program
Resource drilling has focused on converting selected Inferred stopes in the current Mineral Resource of 16.2Mt at 4.4g/t Au for 2.3Moz (Indicated: 10.7Mt at 4.5g/t Au for 1.6 Moz : Inferred 5.5Mt at 4.2g/t Au for 0.7 Moz) 1 to higher confidence Indicated classification at Pollard, United North and Youanmi Main as shown in plan on Figure 1. The drilling has also provided both sample material for metallurgical testing and valuable geological data for the pending Definitive Feasibility Study (“DFS”) planned for second half of 2025.
Figure 1: Plan view of the Youanmi Gold Project featuring drill hole collar locations and 2024 Resource outline overprinted on aerial photography
Outside of the immediate resource area, drilling was also conducted on near-mine exploration and focused on the Youanmi South prospect area, or Paddy’s Lode, first reporting high-grade intercepts in 20232. The drilling at Paddy’s has complimented the Company’s exploration strategy moving south along the Main Lode Shear Zone (MLSZ) and adding additional gold ounces to the Resource. Youanmi South has the potential to grow the Resource above the 103kozpa Production Target outlined in the recently completed Pre-Feasibility Study (“PFS”)3.
Click here for the full ASX Release
This article includes content from Rox Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Drilling Commenced at Viani in Fiji
Alice Queen Limited (ASX:AQX) (“Alice Queen” or the “Company”) is pleased to announce that drilling has commenced at its 100% owned Viani Project in Vanua Levu, Fiji (see Image 1). The initial planned three-hole diamond drilling program will test for high-grade epithermal gold-style mineralisation intersected at the Viani Project by historic drilling.
HIGHLIGHTS
- The Phase 1, three-hole diamond drilling program has commenced at the Viani Project, Fiji and will test for extensions to the quartz vein gold mineralisation at depth.
- Phase 1 is expected to be completed in early 2025, with plans for additional drilling under the same program dependent on the initial results
- The Viani Project (SPL1513) covers an area of approximately 200km2 and is largely underexplored.
- At the Dakuniba prospect within Viani, low sulphidation epithermal high-grade gold mineralisation has been mapped over >3km strike length.
- Diamond drilling completed by Japan International Cooperation Agency (JICA) in 1995 to 1997 intersected high-grade gold in low sulphidation epithermal quartz veins, including 0.6m @ 27.6 g/t Au.
With drilling underway, Alice Queen is positioned to test the epithermal gold-style mineralisation identified in historic drilling at the Viani Project. Weather permitting, we anticipate completing the Phase 1, three-hole diamond drilling program in early 2025. Following this, our exploration team will mobilise the drill rig to the Sabeto Project in Fiji to maintain the momentum of this campaign. To deliver timely results to shareholders, we intend to accelerate the analysis of the drill core at ALS Brisbane.”
Image 1 – Diamond drilling at Viani
Details
Geology
The geology of the Viani Project (SPL 1513) comprises olivine basalts and volcaniclastics of the Natewa Volcanic Group which are intruded by andesite sills and dykes. In the 1940s, gold mineralisation was found by local prospectors near the village of Dakuniba. At Dakuniba, low sulphidation style epithermal gold occurs in quartz veins, and silicified rocks along a 3km long NE trending zone.
In 1995-1997, Japan International Cooperation Agency (JICA) drilled six diamond holes at Dakuniba and intersected high-grade gold in chalcedonic, crustiform, colloform banded quartz veins at depths of 50m to 100m below surface (i.e. MJVFV-5 intersected 2.2m @ 11.3 g/t Au, incl 0.6m @ 27.6 g/t Au at 121m downhole). This high-grade gold mineralisation is open in all directions.
Proposed Drill program
The initial Phase 1 drill program at Viani (see Table 1) will comprise three diamond drillholes designed to test continuity to the epithermal gold mineralisation previously intersected in JICA drillhole MJVFV- 5 (2.2m @ 11.3 g/t Au) (see Figure 2). The drilling will test for extensions to the gold mineralisation at depth and along strike.
Click here for the full ASX Release
This article includes content from Alice Queen Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
FireFly Drills its Best Hole Yet with Assay of 86.3m at 3.7% CuEq
Latest drilling returns very thick intersections with exceptional grades, outlining a rich area of mineralistion which will form part of the next Resource update
FireFly Metals Ltd (ASX: FFM) (“Company” or “Firefly”) is pleased to announce its best assays yet at the Green Bay copper-gold project.
- Latest drilling at the Ming Mine within the Green Bay Project returns spectacular results which support the Company’s strategy to continue growing the Resource (currently 59Mt at 2% CuEq; see ASX release dated 29 October 2024)
- There are two distinct styles of mineralisation at Ming; upper copper-gold rich Volcanogenic Massive Sulphide (‘VMS’) lenses above a broad copper footwall stringer zone (‘FWZ’)
- The latest drilling reveals strong FWZ mineralisation directly below the high-grade VMS; This has resulted in continuous copper-gold intersections which are both wide (~true thickness) and high-grade, including drill holes:
- 86.3m @ 3.7% CuEq 1 (3.1% Cu & 0.6g/t Au) in hole MUG24-079
Intersection includes two distinct VMS lodes grading 15.5m @ 4.6% CuEq and 9.9m @ 5.8% CuEq above a broad copper FWZ intersection with a high-grade core of 27.6m @ 5.3% CuEq
- 76.3m @ 2.9% CuEq (2.4% Cu & 0.5g/t Au) in hole MUG24-073
Intersection includes an upper VMS lode grading 20.1m @ 6.1% CuEq above multiple FWZ intersections including 24.0m @ 2.6% CuEq and 11.0m @ 2.4% CuEq
- Other notable assays received subsequent to the completion of the October 2024 Resource update include (~true thickness):
- 7.9m @ 3.8% CuEq (1.1% Cu & 2.9g/t Au) VMS zone MUG24-070
- 21.0m @ 1.8% CuEq and 21.9m @ 1.9% CuEq and 19.7m @ 2.0% CuEq FWZ zone MUG24-070
- 50.9m @ 1.7% CuEq (1.6% Cu & 0.1g/t Au) FWZ zone MUG24-069
- Both the high-grade massive sulphide zones and broad footwall stringer zones remain open, with downhole geophysical surveys indicating likely extensions to the mineralisation
FireFly Managing Director Steve Parsons said: “These exceptional new results highlight both the quality and ongoing growth potential at Green Bay.
”The results, which come from some of the deepest holes drilled to date, are world-class, demonstrating exceptionally high grades over huge true widths. They will be included in the next Resource update.
“The Resource remains open, and we will continue to add value through the drill bit by continuing to grow and infill what is already a high-grade and large-scale copper deposit”.
The results highlight the huge scope for ongoing growth in the Resource, which already stands at 59Mt @ 2% for 1.2Mt of contained copper metal equivalent.
These reported intersections were received after the October 2024 Resource update.
There are two distinct styles of mineralisation at the Ming underground mine at Green Bay. One comprises the upper copper-gold rich Volcanogenic Massive Sulphide (‘VMS’) lenses. This sits above a broad copper stringer zone known as the Footwall Zone (‘FWZ’).
Drilling at the margins of the current Resource show the development of a strong copper-rich footwall zone directly beneath the upper VMS lenses. In other parts of the deposit the separation of the VMS and FWZ can exceed 50 metres. Their convergence has resulted in thick and consistent high-grade copper and gold intersections which are amongst the best mineralised results returned from the deposit to date. Highlights include 86.3m @ 3.7% CuEq (~true thickness) made up of two separate VMS intersections of 15.5m @ 4.6% CuEq and 9.9m @ 5.8% CuEq above a thick FWZ mineralised zone with a core of 27.6m @ 5.3% CuEq.
Both the high-grade massive sulphide zones and broad footwall stringer zones remain open, with downhole geophysical surveys indicating probable extensions to the mineralisation pointing to future resource growth.
The Company will continue with its strategy of Resource growth at Ming with exploration development continuing to position drill rigs to deliver Resource growth during 2025. Four rigs continue to drill underground as part of the fully-funded 130,000m campaign designed to deliver both additional Resource extensions and infill drilling to increase confidence in the Inferred areas of the current estimate.
FireFly is well funded with ~A$88M in cash at the end of October 2024.
Click here for the full ASX Release
This article includes content from Firefly Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Strategic Expansion of MacBride Base & Precious Metal Project in Canada
Acquired ground more than doubles Corazon’s prospective landholding / Aerial geophyical survey extended to test new tenure / Work underway defining priority targets for early 2025 drill program
Corazon Mining Limited (ASX: CZN) (Corazon or Company) is pleased to announce the strategic expansion of its MacBride Base and Precious Metals Project (MacBride or Project) in the Lynn Lake district, of Manitoba, Canada.
KEY HIGHLIGHTS
- Corazon has secured additional ground at the MacBride Base and Precious Metals Project in Canada’s Lynn Lake district
- MacBride Project now covers a 14-kilometre strike of stratigraphy prospective for Cu-Zn-Au-Ag massive sulphide deposits, including the drill-defined outcropping MacBride and Wellmet deposits
- High-grade gold assays from historical sampling (up to 25.9g/t Au in grab samples) within the new ground further highlights the region’s prospectivity for orogenic gold deposits
- An aerial VTEM geophysical survey is currently underway
- Previous VTEM survey effectively defined a conductor coincident with the MacBride Deposit, as well as multiple untested, high-priority conductors undercover on trend
- The new VTEM survey provides greater coverage of the MacBride Project, including the first-time survey of the Wellmet Cu-Au and Zn-Cu-Au trends
- Results from the new VTEM survey are expected to be available in the coming weeks and will be used in targeting drilling for early 2025
- The MacBride Project is an exciting exploration opportunity and will be a major focus of Corazon’s ongoing Lynn Lake region exploration activities
The Company has physically staked and made applications for new Mining Claims that increases the MacBride project area from ~26km2 to ~56km2, covering a contiguous
~14km strike length of the prospective MacBride/Wellmet trend (Figure 1). The new Claims are pending grant by the Manitoba Provincial Government.
The new area hosts several prospects identified by historical exploration, including results as high as 25.9 g/t Au in grab sampling at Prospect Area F (Figure 1).
Exploration at MacBride between the 1940’s and early 1990’s defined the MacBride and Wellmet copper-zinc-gold- silver deposits and established the fertility of the region. The only recent exploration was a 2008 aerial VTEM (versatile time domain electromagnetic) survey, which identified the MacBride deposit as a conductor, along with multiple high-order conductive bodies, undercover along trend (ASX announcement 7 October 2024). These conductive bodies are yet to be followed up with drilling.
The MacBride Project is a major focus of Corazon’s Lynn Lake region exploration activities. The effectiveness of past geophysical VTEM surveys in defining drill-defined massive sulphide mineralisation has resulted in extending coverage over a larger part of the project area. The geophysical conductors defined from this work will be the priority focus for first pass drilling currently proposed for early 2025.
The MacBride Project expansion further enhances Corazon’s position as a significant landholder and active explorer- developer in the Lynn Lake district, which also hosts the Company’s 100% owned, flagship Lynn Lake Nickel-Copper- Cobalt Sulphide Project.
Click here for the full ASX Release
This article includes content from Corazon Mining, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here
Latest News
Elixir Energy Investor Kit
- Corporate info
- Insights
- Growth strategies
- Upcoming projects
GET YOUR FREE INVESTOR KIT
Latest Press Releases
Related News
TOP STOCKS
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.