US EV Battery Supply Chain: Drilling Continues to Deliver High-Grade Nickel and Copper Intercepts at the Tamarack Nickel Project

Assay results continue to define high nickel & copper grades outside main resource area

Talon Metals Corp. (TSX:TLO) ("Talon" or the "Company") is pleased to provide an update on the Tamarack Nickel-Copper-Cobalt Project ("Tamarack Nickel Project"), located in central Minnesota.

Figure 1: 15.32 meters grading 6.06% Ni and 2.51% Cu (7.40% NiEq, 19.74% CuEq) (drill hole 21TK0334)

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2443/105765_9f91bc73046d0bb0_001full.jpg

Most recent assay results from the CGO West area (outside the main resource area of the Tamarack Nickel Project) have resulted in additional high nickel and copper grades (see Table 2). Selected intervals from the 11 new holes contained in this news release, include:

  • 15.32 meters grading 6.06% Ni and 2.51% Cu (7.40% NiEq1, 19.74% CuEq2) at 231.57 meters depth (drill hole 21TK0334);
  • 9.93 meters grading 5.68% Ni and 2.12% Cu (6.86% NiEq, 18.29% CuEq) at 267.77 meters depth (drill hole 21TK0320);
  • 13.25 meters grading 3.97% Ni and 1.48% Cu (4.82% NiEq, 12.85% CuEq) at 190.75 meters depth (drill hole 21TK0323);
  • 7.24 meters grading 4.77% Ni and 1.89% Cu (5.80% NiEq, 15.46% CuEq) at 241.53 meters depth (drill hole 21TK0316);
  • 11.32 meters grading 2.65% Ni and 1.16% Cu (3.32% NiEq, 8.85% CuEq) at 187.87 meters depth (drill hole 21TK0329);
  • 7.61 meters grading 2.26% Ni and 1.67% Cu (3.18% NiEq, 8.48% CuEq) at 232 meters depth (drill hole 21TK0331).

"The hits just keep on coming - the Talon exploration team is consistently hitting high-grade massive sulphides during the Tamarack drill program," said Etienne Dinel, Ph.D, P.Geo Vice President Geology at Talon. Dinel added: "All of the drill holes reported today fall outside of the Tamarack Nickel Project's main resource area and are expected to increase the size and extent of the known nickel and copper resource at Tamarack."

CGO West Summary

The CGO West area lies approximately 100 meters north-north-east of the Tamarack Nickel Project's resource area and extends for an additional 400 meters where drilling shows the presence of shallow, high-grade nickel-copper mineralization. The thick intersections of mixed and massive sulphides are found at the base of the overlying Fine-grained Orthocumulate ("FGO") and Coarse-grained Orthocumulate ("CGO") intrusions.

Figure 2: Plan view geological map of the northern portion of the Tamarack Nickel Project showing the new nickel-copper mineralization intervals in green text boxes in the CGO West area

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/2443/105765_9f91bc73046d0bb0_002full.jpg

  

Figure 3: Section A represents a portion of the CGO West area looking east showing the thick intersections of nickel-copper mineralization found in drill holes 21TK0316, 21TK0320 and 21TK0333

To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/2443/105765_9f91bc73046d0bb0_003full.jpg

  

Figure 4: Section B represents a portion of the CGO West area looking east showing the thick intersections of nickel-copper mineralization found in drill holes 21TK0299, 21TK0323, 21TK0329 and 21TK0336

To view an enhanced version of Figure 4, please visit:
https://orders.newsfilecorp.com/files/2443/105765_9f91bc73046d0bb0_004full.jpg

Table 1: Collar Locations of New Drill Holes Referred to in this Press Release

CGO WEST
HOLEID Easting (m) Northing (m) Elevation (masl) Azimuth Dip End Depth (m)
21TK0299 491108.8 5169252.7 388.0 0.5 -65.9 187.3
21TK0316 491069.4 5169033.6 388.0 308.9 -54.1 313.9
21TK0323 491077.7 5169039.1 388.5 358.8 -72.0 249.3
21TK0329 491074.0 5169043.0 388.0 20.0 -66.0 228.0
21TK0320 491008.4 5168962.4 388.8 340.2 -53.5 293.1
21TK0331 491060.0 5169035.0 388.0 333.8 -72.6 277.4
21TK0332 491060.0 5169035.0 388.0 355.7 -71.2 231.7
21TK0333 491008.0 5168963.0 388.0 336.3 -56.2 403.9
21TK0334 491060.0 5169036.0 388.0 326.2 -65.5 324.9
21TK0335 491142.0 5169176.0 388.0 215.7 -70.0 219.5
21TK0336 491009.0 5168963.0 388.0 25.5 -59.0 295.1

 

Collar coordinates are UTM Zone 15N, NAD83
Azimuths and dips are taken from survey record at collar unless otherwise noted

Table 2: Assay Results of New Drill Holes Referred to in this Press Release

Drill Hole From To Length Results
# (m) (m) (m) Ni (%) Cu (%) Co (%) Pd (g/t) Pt (g/t) Au (g/t) NiEq (%) CuEq (%)
21TK0299 121.19 126.96 5.77 0.61 0.39 0.02 0.03 0.04 0.04 0.82 2.18
and 143.28 151.98 8.70 1.18 0.76 0.03 0.19 0.30 0.11 1.63 4.34
21TK0316 225.76 233.22 7.46 0.72 0.51 0.02 0.09 0.14 0.09 1.01 2.69
and 241.63 248.87 7.24 4.77 1.89 0.15 0.17 0.23 0.13 5.80 15.46
21TK0320 235.00 250.46 15.46 0.90 0.50 0.03 0.13 0.22 0.09 1.21 3.24
and 267.77 277.70 9.93 5.68 2.12 0.15 0.24 0.32 0.19 6.86 18.29
including 277.31 277.70 0.39 7.68 2.92 0.19 0.27 0.30 0.16 9.20 24.53
21TK0323 190.75 210.00 13.25 3.97 1.48 0.12 0.22 0.28 0.10 4.82 12.85
21TK0329 187.87 199.19 11.32 2.65 1.16 0.09 0.18 0.24 0.12 3.32 8.85
21TK0331 182.00 190.71 8.71 0.56 0.28 0.02 0.12 0.20 0.10 0.77 2.06
and 232.00 239.61 7.61 2.26 1.67 0.04 0.30 0.55 0.24 3.18 8.48
including 233.26 236.33 3.07 4.27 1.73 0.15 4.78 0.11 6.15 2.70 16.40
21TK0332 180.37 201.30 20.93 1.67 0.71 0.06 0.11 0.17 0.09 2.09 5.59
including 195.91 201.30 5.39 4.16 1.48 0.15 0.17 0.18 0.08 5.02 13.39
21TK0333 232.50 245.50 13.00 0.55 0.25 0.01 0.14 0.24 0.11 0.76 2.03
and 252.00 271.28 19.28 0.77 0.50 0.02 0.14 0.22 0.12 1.08 2.89
and 290.19 291.66 1.47 4.52 2.27 0.11 0.17 0.21 0.10 5.62 15.00
21TK0334 193.09 197.99 4.90 0.56 0.32 0.02 0.16 0.27 0.11 0.81 2.17
and 231.57 246.89 15.32 6.06 2.51 0.16 0.30 0.40 0.14 7.40 19.74
including 243.95 246.89 2.94 7.20 3.15 0.16 0.42 0.60 0.26 8.87 23.65
21TK0335 172.33 190.08 17.75 1.48 0.74 0.05 0.11 0.18 0.11 1.91 5.11
including 185.25 190.08 4.83 4.17 1.92 0.14 0.26 0.39 0.19 5.27 14.04
21TK0336 207.50 216.54 9.04 0.58 0.34 0.02 0.04 0.08 0.09 0.78 2.08
and 223.84 246.68 22.84 0.99 0.64 0.03 0.13 0.22 0.15 1.37 3.65
and 265.25 273.98 8.73 4.67 1.98 0.10 0.48 0.61 0.27 5.83 15.55

 

Length refers to drill hole length and not True Width.
True Width is unknown at the time of publication.
All samples were analysed by ALS Minerals. Nickel, copper, and cobalt grades were first analysed by a 4-acid digestion and ICP AES (ME-MS61). Grades reporting greater than 0.25% Ni and/or 0.1% Cu, using ME-MS61, trigger a sodium peroxide fusion with ICP-AES finish (ICP81). Platinum, palladium and gold are initially analyzed by a 50g fire assay with an ICP-MS finish (PGM-MS24). Any samples reporting >1g/t Pt or Pd trigger an over-limit analysis by ICP-AES finish (PGM-ICP27) and any samples reporting >1g/t Au trigger an over-limit analysis by AAS (Au-AA26).
NiEq% = Ni%+ Cu% x $3.00/$8.00 + Co% x $12.00/$8.00 + Pt [g/t]/31.103 x $1,300/$8.00/22.04 + Pd [g/t]/31.103 x $700/$8.00/22.04 + Au [g/t]/31.103 x $1,200/$8.00/22.04
CuEq% = Cu%+ Ni% x $8.00/$3.00 + Co% x $12.00/$3.00 + Pt [g/t]/31.103 x $1,300/$3.00/22.04 + Pd [g/t]/31.103 x $700/$3.00/22.04 + Au [g/t]/31.103 x $1,200/$3.00/22.04
No adjustments were made for recovery or payability.

QUALITY ASSURANCE, QUALITY CONTROL AND QUALIFIED PERSONS

Please see the technical report entitled "NI 43-101 Technical Report Updated Preliminary Economic Assessment (PEA) #3 of the Tamarack North Project - Tamarack, Minnesota" with an effective date of January 8, 2021 prepared by independent "Qualified Persons" (as that term is defined in National Instrument 43-101 ("NI 43-101") Leslie Correia (Pr. Eng), Andre-Francois Gravel (P. Eng.), Tim Fletcher (P. Eng.), Daniel Gagnon (P. Eng.), David Ritchie (P. Eng.), Oliver Peters (P. Eng.), Volodymyr Liskovych (P.Eng.), Andrea Martin (P. E.) and Brian Thomas (P. Geo.) for information on the QA/QC, analytical and testing procedures at the Tamarack Project. Copies are available on the Company's website (www.talonmetals.com) or on SEDAR at (www.sedar.com). The laboratory used is ALS Minerals who is independent of the Company.

Lengths are drill intersections and not necessarily true widths. True widths cannot be consistently calculated for comparison purposes between holes because of the irregular shapes of the mineralized zones. Drill intersections have been independently selected by Talon. Drill composites have been independently calculated by Talon. The geological interpretations in this news release are solely those of the Company. The locations and distances highlighted on all maps in this news release are approximate.

Dr. Etienne Dinel, Vice President, Geology of Talon, is a Qualified Person within the meaning of NI 43-101. Dr. Dinel is satisfied that the analytical and testing procedures used are standard industry operating procedures and methodologies, and he has reviewed, approved and verified the technical information disclosed in this news release, including sampling, analytical and test data underlying the technical information.

ABOUT TALON

Talon is a TSX-listed base metals company in a joint venture with Rio Tinto on the high-grade Tamarack Nickel-Copper-Cobalt Project located in central Minnesota. Talon has an earn-in to acquire up to 60% of the Tamarack Project. The Tamarack Project comprises a large land position (18km of strike length) with numerous high-grade intercepts outside the current resource area. Talon is focused on expanding its current high-grade nickel mineralization resource prepared in accordance with NI 43-101; identifying additional high-grade nickel mineralization; and developing a responsible processing capability in the United States. Talon has a well-qualified exploration and mine management team with extensive experience in project management.

For additional information on Talon, please visit the Company's website at www.talonmetals.com/

Media Contact:

Todd Malan
1-(202)-714-8187
malan@talonmetals.com

Investor Contact:

Sean Werger
1-(416)-361-9636 x102
werger@talometals.com

FORWARD-LOOKING STATEMENTS

This news release contains certain "forward-looking statements". All statements, other than statements of historical fact that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Such forward-looking statements include statements relating to the timing and results of the exploration program, including assay results, grades, geophysical results and drilling plans; an increase to the size and extent of the known nickel and copper resource; and the timing and results of a new resource estimate. Forward-looking statements are subject to significant risks and uncertainties and other factors that could cause the actual results to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company.

Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

____________________

1 Where used in this news release NiEq% = Ni%+ Cu% x $3.00/$8.00 + Co% x $12.00/$8.00 + Pt [g/t]/31.103 x $1,300/$8.00/22.04 + Pd [g/t]/31.103 x $700/$8.00/22.04 + Au [g/t]/31.103 x $1,200/$8.00/22.04

2 Where used in this news release CuEq% = Cu%+ Ni% x $8.00/$3.00 + Co% x $12.00/$3.00 + Pt [g/t]/31.103 x $1,300/$3.00/22.04 + Pd [g/t]/31.103 x $700/$3.00/22.04 + Au [g/t]/31.103 x $1,200/$3.00/22.04

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/105765

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Canadian flag draped over "Ni" symbol and stock chart.

Top 5 Canadian Nickel Stocks of 2025

Nickel prices have experienced volatility in the past few years due to supply and demand uncertainty.

This trend has continued into 2025, and is expected to remain in place for the year. While this environment has been tough, some nickel stocks are still thriving amid the ongoing uncertainty.

Supply is expected to outflank demand over the short term, but the longer-term outlook for the metal is strong. Demand from the electric vehicle (EV) industry is one reason nickel's outlook looks bright further into the future.

Keep reading...Show less
Diagonal rows of nickel rolls.

Top 3 ASX Nickel Stocks of 2025

With its diverse applications in both technology and industry, nickel is a metal that will never go out of style.

Nickel is commonly used in alloys to create stainless steel, but more recently has found a modern use: batteries. As the electric vehicle trend gains steam, the base metal is in high demand for its role in lithium-ion batteries.

However, nickel has encountered much volatility in the past few years.

Keep reading...Show less
Seesaw diagram with "demand" outweighing "supply" on a chalkboard.

Nickel Price Update: Q2 2025 in Review

After spiking above US$20,000 per metric ton (MT) in May 2024, nickel prices have experienced a downward trend, mainly remaining in the US$15,000 to US$16,000 range.

Indonesia's elevated production levels have been a primary factor contributing to these low prices, as sustained high output continues to oversupply the market. The supply surplus has had a knock-on effect, putting pressure on western producers who have been forced to slash their production to maintain profitability.

Elevated output coincides with electric vehicle (EV) demand, which is under threat as market uptake has slowed, and policy changes in the United States are expected to increase costs for consumers and lower sentiment for the vehicles.

Keep reading...Show less
Closeup of periodic table highlighting nickel with a nickel block on its symbol.

South32 Announces Up to US$100 Million Sale of Cerro Matoso, Shifts Focus to Critical Minerals

South32 (ASX:S32,OTC Pink:SHTLF) said on Monday (July 7) that it has agreed to sell the Cerro Matoso nickel mine in Colombia to a subsidiary of CoreX Holding following recent changes in the nickel market.

South32 now plans to focus on critical minerals, describing its flagship Hermosa project in Patagonia as a “next generation mine.” Hermosa hosts the zinc-lead-silver Taylor sulphide deposit, and the zinc-manganese-silver Clark oxide deposit.

"The Transaction is consistent with our strategy and will further streamline our portfolio toward higher margin businesses in minerals and metals critical to the world’s energy transition,” said South32 CEO Graham Kerr.

Keep reading...Show less
FPX Nickel (TSXV:FPX)

FPX Nickel Completes Production Run of Battery-Grade Nickel Sulphate to Support Discussions with Prospective EV Battery Supply Chain Partners

FPX Nickel Corp. (TSXV: FPX) (OTCQB: FPOCF) ("FPX" or the "Company") is pleased to announce successful production of additional battery-grade nickel sulphate from its Baptiste Nickel Project ("Baptiste" or the "Project"). Building on the success of previous testing campaigns, a production run was completed to produce larger quantities of nickel sulphate crystals. The nickel sulphate samples, which meet the strict target specifications for battery applications, will be provided to selected prospective downstream partners including pCAM producers, battery companies, and automakers pursuing supply security, traceable sourcing, and low carbon intensity production.

"The production of high-purity nickel sulphate further positions us to engage in strategic discussions with prospective downstream partners across the global EV supply chain," commented Martin Turenne, FPX Nickel's President and Director. "This milestone further demonstrates the strategic flexibility of the Baptiste awaruite concentrate and the technical maturity of the awaruite refining process."

Keep reading...Show less

Latest Press Releases

Related News

×