12.5 feet in meters

Iconic Receives 2nd Option Payment for Bonnie Claire and Extends Deadline for Final Payment

Iconic Minerals Ltd. (TSXV: ICM) (OTC Pink: BVTEF) (FSE: YQGB) (the "Company" or "Iconic") is pleased to announce that the Company has received the second option payment of $2MM USD from Nevada Lithium Resources Inc. ("Nevada Lithium") which increases Nevada Lithium's aggregate ownership in the Bonnie Claire Project to 35%. Concurrent with the payment, Iconic and Nevada Lithium have also agreed to an amendment of the Option Agreement, which extends the deadline for the third and final option payment under the agreement until December 15th, 2021. Upon payment of the third option of $2MM USD, Nevada, will have fully earned its option for an aggregate 50% ownership in the Bonnie Claire Project.

"We are pleased to announce the receipt of the second option payment from Nevada Lithium and look forward to working in partnership to confirm what we believe to be one of the largest world class lithium deposits. The Company anticipates the acceptance of the Plan of Operations in the near future and is eager to commence our 2022 drilling campaign at the Bonnie Claire Property. The data collected from this campaign is integral to the completion of the Pre-Feasibility Study and the next stage of our development towards Pre-Production," said Iconic CEO, Richard Kern.

Bonnie Claire Property

The Bonnie Claire Property is located within Sarcobatus Valley, which is approximately 30 km (19 miles) long and 20 km (12 miles) wide. Quartz-rich volcanic tuffs containing anomalous amounts of lithium occur within and adjacent to the valley. Drill results from the salt flat have included lithium values as high as 2550 ppm Li and a 1560 foot (roughly 475 meter) vertical intercept that averaged 1153 ppm Li. The current 43-101 resource from the PEA report for borehole mineable portion of the resource is 3,407 million tonnes grading 1,013 ppm Li or 18,372 million kilograms of lithium carbonate equivalent. (though this is a resource, not a reserve, and has not yet proven economic viability). The gravity low within the valley is 20 km (12 miles) long, and the current estimates of depth to basement rocks range from 600 to 1,200 meters (2,000 to 4,000 feet). The current claim block covers an area of 74 km2 (28.6 mi2) with potential for brine systems and further sediment resources.

On behalf of the Board of Directors

SIGNED: "Richard Kern"

Richard Kern, President and CEO

Contact: Keturah Nathe, VP Corporate Development (604) 336-8614

For further information on Iconic, please visit our website at www.iconicminerals.com. The Company's public documents may be accessed at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included herein including, without limitation, statements with respect to the Option, the Joint Venture, the amount of the Offering, the expected use of proceeds from the Offering and the future business plans and exploration activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "will", "believes", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "potential", "scheduled" or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that investor interest will be sufficient to close the Offering, that market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals required for the Option Agreement and the future development of the Company's projects in a timely manner.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, including on the Bonnie Claire Property, requirements for additional capital, future prices of lithium and gold, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on the business, financial condition and exploration and development activities of the Company, changes in laws, regulations and policies affecting mining operations, title disputes, the inability of the Company to obtain any necessary permits, consents, approvals or authorizations, including of the TSX Venture Exchange in respect of the Option Agreement and the Offering, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and risks related to joint venture operations, and other risks and uncertainties disclosed in the Company's latest interim Management's Discussion and Analysis and filed with the Canadian Securities Authorities. All of the Company's Canadian public disclosure filings may be accessed via www.sedar.com and readers are urged to review these materials, including the technical reports filed with respect to the Company's mineral properties.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this news release or incorporated by reference herein, except as otherwise required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/106063

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×