lomiko metals news

Learn More About Lomiko's Electric Vehicle Zone, Visit the Lomiko Booth by Registering for the PDAC Investor Exchange

Lomiko Metals Inc. ( TSX-V: LMR, OTC: LMRMF, FSE: DH8C) (Lomiko or the "Company") will be exhibiting at the 2021 Prospectors and Developers Association Conference (PDAC) from March 8 to 11, 2021.

We invite conference delegates to visit us at our Virtual Booth in the Investors Exchange to discuss recent developments and plans for Lomiko's La Loutre Graphite Project and the Electric Vehicle Zone (EV) area.  Lomiko is proud to be a member of the PDAC and official exhibitor in 2021.

Electric Vehicle (EV) Zone Highlights

The successful 2019 drilling campaign at the EV Zone (formerly Refractory) propelled Lomiko's decision to consider metallurgy and a further study.  Please see the detailed EV Zone drill map for details .

LL-16-01 - 7.74%   Cg over 135.60   m including 16.81%   Cg over 44.10   m

LL-16-02 - 17.08%   Cg over 22.30   m and 14.80% Cg over 15.10   m

LL-16-03 - 14.56%   Cg over 110.80   m

Results from the 2019 program EV drill Program are highlighted in the February 5, 2020 , News Release.  A total of 21 holes were completed in 2019 on the EV Zone for a total of 2,985 metres.

Graphene-Battery Zone

The Project was also the subject of an independent technical report in accordance with NI 43-101 - Standards of Disclosure for Mineral Projects, prepared by B. Turcotte and G. Servelle of InnovExplo Inc. from Val-d'Or, Québec, and O. Peters, of AGP Mining Inc., dated March 24,  2016, filed for the Project's combined Graphene-Battery Zone. The report presented a mineral resource estimate of 18.4 M Tonnes at a grade of 3.19% carbon flake graphite ("Cg") in the Indicated category and 16.7 M Tonnes at 3.75% Cg in the Inferred category using a cut-off of 1.5% Cg.  At a 3% cut-off, the resource estimate is 4.14 M Tonnes of 6.50% Cg in the Indicated category and 6.1 M tonnes of 6.1% Cg.

The above-noted 2016 mineral resource does not include the significant intercepts from the EV Zone in 2016.  A new combined PEA will include results from both zones.

"La Loutre has proven to be a large and high-grade area worthy of further investment," stated A.  Paul Gill, CEO. "The only operating graphite mine in North America is the Imerys Graphite & Carbon at Lac-des-Îles, 53 km northwest of La Loutre which reported Proven reserves of 5.2 M Tonnes at a grade of 7.42 % Cg in July 1988 before the start of production." (reference: Potentiel de la minéralisation en graphite au Québec, N'Golo Togola, MERN, page 31, Conférence Québec Mines, November 24 2016).

*   mineralization hosted on adjacent and/or nearby projects is not necessarily indicative of mineralization hosted on the Company's property:

For more information on Lomiko Metals, review the website at www.lomiko.com , contact A. Paul Gill at 604-729-5312 or email: info@lomiko.com.

On Behalf of the Board,

"A. Paul Gill"

Chief Executive Officer

We seek safe harbor. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release


A. Paul Gill Lomiko Metals Inc. (TSX-V: LMR) 6047295312 apaulgill@lomiko.com 

News Provided by GlobeNewswire via QuoteMedia

The Conversation (0)
Glowing graphite molecules.

ASX Graphite Stocks: 5 Biggest Companies in 2025

Graphite isn’t just used for pencils — it's also a key lithium-ion battery component due to its high conductivity and quick-charging capacity.

This means the graphite sector could experience tailwinds from rising demand for electric vehicles and energy storage systems in the coming years.

Australian investors searching for ways to get exposure to the graphite industry can look to the ASX, which is home to a slew of companies focused on the graphite market.

Keep reading...Show less
Australian money and magnifying glass.

CSIRO Backs Graphite with AU$400,000 R&D Grant Program

Australia’s Commonwealth Scientific and Industrial Research Organisation (CSIRO) has launched a new graphite research and development (R&D) program geared at assisting small- to medium-sized enterprises.

The initiative will allow grant recipients to collaborate with CSIRO scientists and access quality facilities.

“(It) comes at a crucial time,” said CSIRO Principal Research Scientist Adam Best.

Keep reading...Show less
NextSource Materials

NextSource Materials Shifts Battery Anode Facility Plans to Middle East for Accelerated Growth

NextSource Materials Inc. (TSX:NEXT)(OTCQB:NSRCF) ("NextSource" or "the Company") announces an update to its Battery Anode Facility (BAF) strategy, withdrawing from its Mauritius option to focus on accelerated, larger-scale opportunities in the Middle East.

Since November 2022, NextSource has been working closely with its project stakeholders to establish a world-class BAF in Mauritius. The Company leased a potential BAF site and invested in upgrading existing processes to ensure compliance with local regulations and to minimize any environmental impact. Throughout the extensive Environmental Impact Assessment (EIA) review process, the Company continually and promptly met all requests for information.

Keep reading...Show less
E-Power Resources (CSE:EPR)

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc (CSE: EPR) ("E-Power" or the "Company") announces that it has closed the third and final tranche "Third Tranche" of the private placement previously announced on March 12, 2025 (the "Private Placement").

An aggregate of 5,598,240 units (the " Units") of the Company were issued in the Third Tranche of the Private Placement at a price of $0.05 per Unit for gross proceeds of $279,912, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date (the "Offering").

Keep reading...Show less
Altech Batteries

Altech Batteries


Keep reading...Show less

Latest Press Releases

Related News

×