p eng

Granada Gold Hits 3.43 g/t Gold Over 20.5 Meters Near Surface and 6.45 g/t Over 4.5 Meters and 7.9 g/t Over 3 Meters

 Granada Gold Mine Inc. (TSXV: GGM) (the "Company" or "Granada") is pleased to provide another update on its continuing drill program at Granada . This release contains drill results from the 100-series, part 3, near-surface drill program targeting Vein 1. The program is progressing as expected with the intention of converting the current low-grade open pit resource at 1 gram per tonne to a smaller, higher grade open pit with the majority of the future potential ounces in a resource underground. The company has now increased the drill program to 18,000 meters with a target of 120,000 meters to be drilled.

Highlights:

  • 7.9 g/t gold over 3.0m in hole GR-20-121 from 15.0 to 18.0m
  • 6.45 g/t gold over 4.5m in hole GR-20-122 from 0.0 to 4.5m
  • 3.43 g/t gold over 20.5m in hole GR-20-126 from 0.0 to 20.5m

Frank J. Basa , P.Eng., President and CEO notes, "The short-hole drill program has been successful and the company will begin with a new 200-series program with the objective of identifying deeper, down-dip, near-surface mineralization to develop a higher-grade open pit. The current program has been focused on an over 500 meters east-west strike length of a potential 5.5 kilometers mineralized strike length."

ASSAY RESULTS

Hole ID

From (m)

To (m)

Length (m)

Gold

(g/t)

GR-20-121

0.00

9.00

9.00

0.45

and

15.00

18.00

3.00

7.90

including

15.00

16.50

1.50

15.65

GR-20-122

0.00

10.50

10.50

3.25

including

0.00

4.50

4.50

6.45

and

67.50

78.00

7.00

0.66

and

87.35

91.45

4.10

3.06

including

88.85

91.45

2.60

4.46

GR-20-126

0.00

20.50

20.50

3.43

including

11.00

13.00

2.00

4.12

including

16.00

18.00

2.00

14.9

Lengths are core length, no capping applied. Au is Gold by Fire assay, or by gravimetric finish or screen metallic method. Other assays results are still pending. As the Company is being impacted by longer than expected turnaround time (TAT) of analytical results due to COVID-19 and extensive workloads at the ALS laboratory the Company has decided to send the next samples to SGS laboratories to shorten the time frames.

The 100-series holes were drilled to intersect the vein uncovered by stripping and to follow the high-grade corridor.  Holes GR-20-118 to GR-20-125 are vertical holes drilled to intersect the mineralized vein structures and Hole GR-20-126 is drilled within the vein structure.

Typical true thickness of the number 1 vein is 1.5 to 6.0 meters. The halo effect around vein 1 has been measured up to 20 meters true thickness with numerous mineralized veinlets hosting native gold. It has been estimated, based on metallurgical testing, that close to 50 percent of the gold is in native form and can be recovered from these veinlets.

Current Drilling

Drilling continues with two drills remaining on site at Granada.  The goal is to complete 6000-meter drill program intervals with the objective of targeting 120,000 meters. The current program is focused on exploration on only 20 percent of the entire potential 5.5-kilometre mineralized structure.

Qualified person

The technical information in this news release has been reviewed by Claude Duplessis , P.Eng., GoldMinds Geoservices Inc. member of Québec Order of Engineers and a qualified person in accordance with National Instrument 43-101 standards.

Quality Control and Reporting Protocols

All NQ core assays reported were obtained by either 1-kilogram screen fire assay or standard 50-gram fire-assaying-AA (Atomic Absorption) finish or gravimetric finish at ALS Laboratories in Val d'Or , Québec, Thunder Bay, Ontario , Sudbury, Ontario or Vancouver, British Columbia . The screen assay method is selected by the geologist when samples contain visible gold. The drill program, Quality Assurance/Quality Control ("QA/QC") and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes for this program in addition to the lab QA/QC.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. continues to develop the Granada Gold Property near Rouyn-Noranda, Quebec . Approximately 120,000 meters of drilling has been completed to date on the property, focused mainly on the extended LONG Bars zone which trends 2 kilometers east-west over a potential 5.5 kilometers of mineralized structure. The highly prolific Cadillac Break, the source of more than 75 million plus ounces of gold production in the past century, cuts through the north part of the Granada property but is not necessarily indicative of mineralization hosted on the Company's property.

Pit-Constrained Mineral Resources at Granada disclosed on February 13 th , 2019 Press Release prepared by SGS independent QP Maxime Dupéré Geo. & Allan Armitage P. Geo "Technical Report on the Granada Gold Project Mineral Resource Estimate, Rouyn-Noranda, Quebec, Canada " stand at:

Category

Tonnes

Grade (g/t AU)

Contained Gold
(oz.)

Measured

12,637,000

1.02

413,000

Indicated

9,630,000

1.13

349,000

Measured & Indicated

22,267,000

1.06

762,000

Inferred

6,930,000

2.04

455,000

Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

* Pit constrained mineral resources are reported at a cut-off grade of 0.4 g/t Au within a conceptual pit shell.

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and half kilometers. Three of these structures were mined historically from two shafts and two open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 5 to 3.5 grams per tonne gold.

The Company is in possession of all mining permits required to commence the initial mining phase, known as the "Rolling Start", which allows the company to mine up to 550 tonnes per day. Additional information is available at www.granadagoldmine.com .

"Frank J. Basa"

Frank J. Basa P. Eng .
President and Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE Granada Gold Mine Inc.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/January2021/27/c3415.html

News Provided by Canada Newswire via QuoteMedia

The Conversation (0)
Granada Gold

Granada Gold

Building a High-Grade Mine on Quebec’s Cadillac Trend

Building a High-Grade Mine on Quebec’s Cadillac Trend Keep Reading...
A gold bar chart with increasing vertical columns on a white background.

Robert Sinn: More Upside Ahead for Junior Mining Investors

Gold, silver and copper have all hit record highs in 2026 as geopolitical tension, supply chain disruptions and mounting government debt push investors toward hard assets.Gold led the charge, peaking at US$5,589.38 per ounce on January 28 as investor uncertainty reached levels not seen in... Keep Reading...
Stock market tickers with various numbers in red and green; text reads: "mergers and acquisitions."

Artemis Gold Buys Vista Gold in US$427 Million Deal

Artemis Gold (TSXV:ARTG,OTCQX:ARGTF) has agreed to acquire Vista Gold Corp (NYSE:VGZ) in a US$427 million all-stock transaction that secures full ownership of the Mt Todd gold project in Australia’s Northern Territory.Under the definitive arrangement agreement, Vista Gold shareholders will... Keep Reading...

Orosur Mining

Orosur Mining is a gold exploration company focused on the development of early- to advanced-stage gold assets in South America. Exploration has revealed multiple gold deposits at its flagship Anzá gold project in Colombia, which is located 50 kilometers west of Medellín and sits along... Keep Reading...
Bill Holter: Gold's Next Leg Has Begun, This is the "Ultimate Catalyst"

Bill Holter: Gold's Next Leg Has Begun, This is the "Ultimate Catalyst"

Bill Holter of BillHolter.com believes gold's next leg higher has already begun, and its ultimate catalyst is the financial markets themselves. "I think price wise, we're early," he said. "Time wise, I don't think there's a lot of time left before we see the implosion of fiats. The inverse of... Keep Reading...
Spanish flag with stacked coins on a map

The Weight of Gold: Europe’s Thin Gold Story and New Opportunities

Gold remains abundant in Europe; what is currently scarce is gold-producing mines on the continent. Data from the World Gold Council reveals that Europe contributes only a small fraction to the overall global supply. 2025 production in the region was led by Finland with 8.7 tonnes, Bulgaria with... Keep Reading...

Interactive Chart

Latest Press Releases

Related News