tinto

Benton Receives Second Option Payment from Rio Tinto Exploration for Baril Lake West Project

Benton Resources Inc. (TSXV: BEX) ('Benton' or 'the Company') is pleased to announce it has received the second anniversary option payment of $25,000 from Rio Tinto Exploration Canada ("RTEC") for Baril Lake West project (see PR: Benton Completes Option to Purchase Deal with Rio Tinto on Baril Lake Project, dated January 2, 2019). Baril Lake West is situated approximately 4km west of Benton's Bark Lake project, also under option to RTEC (see PR: Benton Options Bark Lake Cu-Ni-PGE Project to Rio Tinto, dated October 25, 2016), and immediately adjacent to RTEC's Baril Lake Project where RTEC discovered significant mineralization grading 4.78%Ni and 0.43% Cu over 2.08m in 2018 (Ontario ENDM Assessment File: 200000017073). These projects are approximately 100km west of the Escape Lake and TBN projects, along the major crustal-scale, east-west oriented, Quetico fault, in which the Escape Lake and TBN projects held by Clean Air Metals Inc. are situated. While the Baril Lake West and Bark Lake projects are early stage in nature, the Company believes they have the potential to contain a magmatic conduit system that could host Cu-Ni-PGEs. At Bark Lake, numerous mineralized boulders near the Quetico Fault contain anomalous Cu-Ni-PGEs grades up to 4.35gpt Pd, 2.64gpt Pt, 0.74gpt Au, 1.2% Cu, 1.5% Ni. Drilling completed by RTEC in 2018 on the Bark Lake project encountered mineralization of 0.31% Cu and 0.72gpt Pt + Pd over 19.2m (see PR: Benton Receives Results from Rio Tinto on Bark Lake Option, dated May 25, 2018). A map showing the location of the Baril West and Bark Lake projects appears on the Benton website (www.bentonresources.ca).

Equity Holdings

Benton continues to be very excited about the future of Clean Air Metals Inc. ("Clean Air"), in which Benton holds 24.6 million shares. Clean Air has two drill rigs operating on the Thunder Bay North and Escape Lake Copper-Nickel-PGM project and has released excellent drill results from its ongoing drill campaign. Benton anticipates ongoing success for Clean Air and looks forward to future resource developments and drill results.

Benton also holds 4.0 million shares of Quadro Resources Ltd., which is advancing various projects in Newfoundland and Ontario. Additionally, Benton holds 3.6 million shares of Maxtech Ventures Inc. Maxtech has an Option and Joint Venture agreement on Benton's Panama Lake gold project in the Red Lake mining region. Further, Benton holds 1 million shares of Sokoman Minerals Corp. which has recently released excellent drill results from its Moosehead Project in Newfoundland. Benton holds 1.38m shares of Metallica Metals Corp. advancing Benton's Saganaga Gold project in NW Ontario. Benton has two NW Ontario projects optioned to Rio Tinto Exploration Canada (the Bark Lake and Baril Lake West Copper-Nickel PGE projects).

QP

Nathan Sims (P.Geo.), Senior Exploration Manager for Benton Resources Inc., the 'Qualified Person' under National Instrument 43-101, has approved the scientific and technical disclosure in this news release and prepared or supervised its preparation.

On behalf of the Board of Directors of Benton Resources Inc.,

"Stephen Stares"
Stephen Stares, President

About Benton Resources Inc.

Benton Resources is a well-funded Canadian-based project generator with a diversified property portfolio in Gold, Silver, Nickel, Copper, and Platinum group elements. Benton holds multiple high-grade projects available for option which can be viewed on the Company's website. Most projects have an up-to-date 43-101 Report available.

Parties interested in seeking more information about properties available for option can contact Mr. Stares at the number below.

For further information, please contact:

Stephen Stares, President & CEO
Phone: 807-475-7474
Email:sstares@bentonresources.ca

CHF Capital Markets

Cathy Hume, CEO
Phone: 416-868-1079 x231
Email:cathy@chfir.com

Website: www.bentonresources.ca
Twitter: @BentonResources
Facebook: @BentonResourcesBEX

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be "forward-looking statements."

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate financing on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks related to gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty to forward-looking statements. These forward looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances. Actual events or results could differ materially from the Company's expectations or projections

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/72418

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Miramar Resources

Entitlement Offer Closes and JMEI Credits Granted

Miramar Resources Limited (ASX:M2R, “Miramar” or “the Company”) is pleased to advise that the non- renounceable rights issue (Entitlement Offer) announced on 21 June 2024 has raised $1.58 million (before costs).

Keep reading...Show less

Ero Copper and Vale Base Metals Execute Definitive Earn-In Agreement on the Furnas Copper Project

Ero Copper Corp. (TSX: ERO, NYSE: ERO) ("Ero" or the "Company") is pleased to announce that it has signed a definitive earn-in agreement ("Agreement") with Salobo Metais S.A, a subsidiary of Vale Base Metals Limited ("VBM"), to earn a 60% interest in the Furnas Copper Project ("Furnas" or the "Project") located in the Carajás Mineral Province in Pará State, Brazil.

The terms of the Agreement align with the previously signed binding term sheet outlined in the Company's press release dated October 30, 2023. For additional detail on the Project, including location maps, geologic cross sections, historical drill intercepts and a description of the Company's work programs, please refer to the Company's press release dated October 30, 2023.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Seismic graph.

Seismic Disruptions Could Cost Copper and Rhenium Industries Billions, USGS Study Shows

Astudy published by the US Geological Survey shows that earthquakes can have a "substantial" impact on mining, smelting and refining operations, creating lasting impacts for the global economy and supply chains.

Focusing on copper and rhenium, a silver-gray transition metal, the study aims to quantify the risks that earthquakes pose to supply — a variable that has not previously been systematically categorized.

Keep reading...Show less
Copper pipes laid on top of each other in bundles.

Top 5 Copper Stocks on the TSX in 2024

Copper prices saw some gains during the first quarter of the year, but supply concerns and rising demand caused the copper price to surge in Q2 to a record high on the COMEX of US$5.20 per pound, or US$11,464 per metric ton, on May 20.

Although strong demand from the energy transition has been expected to impact supply chains for some time, lower treatment charges from Chinese refiners during the first quarter introduced added pressure into the market. The low charges caused cuts to output, ultimately bottlenecking the supply of refined copper to end users.

How have TSX-listed copper companies performed since the start of 2024? Learn about the top 5 best performing copper stocks in 2024 below.

Keep reading...Show less
Spools of copper wire.

Top 5 Junior Copper Stocks on the TSXV in 2024

Many Canadian junior copper stocks are up significantly in 2024 thanks to a strong copper price.

The second quarter of 2024 saw carried-over momentum from March. Easing inflation and speculation of a manufacturing rebound fueled broad gains in commodity markets, helping to push COMEX copper prices to a record high of US$5.20 per pound, or US$11,464 per metric ton, on May 20.

Prices have found support over demand growth from energy sectors as wind and solar projects see greater uptake, particularly in China and India.

Keep reading...Show less
Copper bars.

Chinese Copper Smelters to Trim Output in Response to Falling Margins

Two Chinese copper smelters have announced plans to reduce production next year due to diminishing profit margins caused by an ongoing shortage of ore concentrate, Bloomberg reported on Tuesday (July 16).

These decisions were revealed during a quarterly meeting of Chinese smelters held in Shanghai last week.

Daye Nonferrous Metals, a major smelter based in the country's Hubei province, plans to cut its smelting output by 20 percent in 2025. The company has already implemented smaller reductions, resulting in a decline in its total refined copper production capacity, which now stands at 930,000 metric tons on an annual basis.

Keep reading...Show less

Latest Press Releases

Related News

×