rock tech lithium

Rock Tech Engages ALS for Pilot Plant Programs

(TheNewswire)



Vancouver, BC, Canada TheNewswire - February 16, 2021 Rock Tech Lithium Inc. (the "Company" or "Rock Tech") (TSXV:RCK ) ; ( Frankfurt:RJIB) is pleased to announce that it has engaged ALS Metallurgy ("ALS") to conduct pilot scale test programs, under supervision from Wave International ("Wave").

To confirm its lithium hydroxide flowsheet and process engineering parameters, in support of engineering development, a series of pilot scale tests will be completed for both the industry standard sulphate process and Rock Tech's innovative and patent-pending Nitrate Process.

ALS have been awarded the first stage of the pilot program, which is based on a traditional sulphation route process flowsheet provided by Wave. The feed source for this stage one pilot will be lithium sulphate (from various sources), demonstrating the robustness of the proposed plant to receive intermediary lithium products (other than spodumene concentrate).

The pilot program was commenced last week at ALS' facilities in Perth, Western Australia, under supervision and management by Wave. The program will not only validate the commercial scale flowsheet as outlined above but will also provide a first round of Battery Grade Lithium Hydroxide Monohydrate sample material for ongoing offtake discussions.

ALS is a leading testing, inspection, certification and verification company headquartered in Brisbane, Australia, that has built its reputation around technical innovation, quality, a deep client understanding, and by being a true technical services partner to many companies across a broad spectrum of end markets covering most geographies. ALS provides vital process flowsheet operating data for engineering design, scale-up purposes, process plant upgrade and production of marketing samples. Further, ALS have previously completed various Lithium Hydroxide testwork programs.

Future pilot plant stages will include a second round pilot for the traditional route (producing lithium hydroxide from spodumene concentrates), and a further pilot of the innovate patent-pending Nitrate Process. The future stages will include spodumene feed from the Company's 100%-owned Georgia Lake lithium project in Ontario, Canada, in addition to feed secured from existing and emerging producers.

"We are planning a lithium hydroxide converter with a capacity of 24,000 tonnes per annum so we will rely, to a certain extent, on additional sources to complement our Georgia Lake feed," said Dirk Harbecke, Rock Tech's chairman. "As such, understanding the behaviour of a variety of different feed sources will be invaluable for optimizing process design. Importantly, the pilot programs will provide lithium hydroxide samples which are invaluable for customer qualification as offtake discussions intensify."

Additionally, the Company announces that it has granted 1,480,000 stock options to directors, officers, employees and consultants of the Company. The stock options have an exercise price of $4.21 per share and will expire on February 16, 2023.

On behalf of the Board of Directors,

"Dirk Harbecke"
Dirk Harbecke
Chairman

For further information, please contact:

Brad Barnett
Chief Financial Officer
Rock Tech Lithium Inc.
777 Hornby Street, Suite 600
Vancouver, B.C., V6Z 1S4
Telephone: (778) 358-5200
Facsimile: (604) 670-0033
Email: bbarnett@rocktechlithium.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forward looking statements".  Forward looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions.  The Company cautions readers that forward looking statements, including without limitation those relating to the Company's future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward looking statements.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Rock Tech Lithium

Rock Tech Lithium

Vertically Integrated Lithium Production and Processing

Vertically Integrated Lithium Production and Processing Keep Reading...
SAGA Metals Confirms Significant High-Grade Mineralization at Trapper North Releasing Additional Assays at Radar Critical Minerals Project in Labrador

SAGA Metals Confirms Significant High-Grade Mineralization at Trapper North Releasing Additional Assays at Radar Critical Minerals Project in Labrador

--Drilling Success Continues at Trapper North: 4 out of 4 Drill Holes Confirm High-Grade Titanium, Vanadium and Iron Mineralization-- Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA,OTC:SAGMF) (OTCQB: SAGMF) (FSE: 20H), a North American exploration company focused on critical mineral... Keep Reading...
NextSource Materials Executes Term Sheets with Strategic Investors and Local Capital Partners to Advance Towards Final Investment Decision for its Proposed UAE Battery Anode Facility

NextSource Materials Executes Term Sheets with Strategic Investors and Local Capital Partners to Advance Towards Final Investment Decision for its Proposed UAE Battery Anode Facility

TORONTO, ON / ACCESS Newswire / January 12, 2026 / NextSource Materials Inc. (TSX:NEXT,OTC:NSRCF)(OTCQB:NSRCF) ("NextSource" or the "Company") is pleased to announce that it has finalized multiple term sheets with strategic investors to fund Phase 1 of the Company's proposed Battery Anode... Keep Reading...
NextSource Materials Announces Arrival of First Equipment Shipment in UAE for its Battery Anode Facility and Significant Progress on Front-End Engineering and Design

NextSource Materials Announces Arrival of First Equipment Shipment in UAE for its Battery Anode Facility and Significant Progress on Front-End Engineering and Design

TORONTO, ON / ACCESS Newswire / January 7, 2026 / NextSource Materials Inc. (TSX:NEXT,OTC:NSRCF) ("NextSource" or the "Company") is pleased to announce that the first shipment of equipment for its proposed Battery Anode Facility ("BAF") has arrived in Abu Dhabi in the United Arab Emirates... Keep Reading...
NextSource Materials Announces Results of 2025 Annual Meeting of Shareholders

NextSource Materials Announces Results of 2025 Annual Meeting of Shareholders

TORONTO, ON / ACCESS Newswire / December 31, 2025 / NextSource Materials Inc. (TSX:NEXT,OTC:NSRCF)(OTCQB:NSRCF) ("NextSource" or the "Company") is pleased to announce the results of the Annual Meeting of Shareholders of the Company (the "Meeting") held virtually at 8:00 AM (Toronto time) on... Keep Reading...
Nevada Sunrise Announces Stock Option Grants

Nevada Sunrise Announces Stock Option Grants

Nevada Sunrise Metals Corporation (TSXV: NEV,OTC:NVSGF) (OTC Pink: NVSGF) ("Nevada Sunrise" or the "Company") announced today that it has granted a total of 3,250,000 stock options to directors, officers and consultants of the Company, exercisable at a price of $0.05 per share for a period of... Keep Reading...
Nevada Sunrise Completes Fall 2025 Surface Exploration at the Griffon Gold Mine Project, Nevada

Nevada Sunrise Completes Fall 2025 Surface Exploration at the Griffon Gold Mine Project, Nevada

Nevada Sunrise Metals Corporation (TSXV: NEV,OTC:NVSGF) (OTC Pink: NVSGF) ("Nevada Sunrise" or the "Company") is pleased to announce it has completed surface geophysical and geochemical exploration surveys at its Griffon Gold Mine Project ("Griffon", or the "Project") in White Pine County,... Keep Reading...

Interactive Chart

Latest Press Releases

Related News