lomiko metals news

Rock Tech Announces Results from Lithium Hydroxide Pilot Plant in Germany - High Quality, Battery Grade Lithium Hydroxide Produced

Rock Tech Lithium Inc. (the "Company" or "Rock Tech") (TSX-V: RCK) (Frankfurt: RJIB)  (OTCQX: RCKTF) is pleased to announce completion of a pilot test program and prototype production of battery grade lithium hydroxide monohydrate greater than 99.5% purity, in compliance with end-user electric vehicle lithium-ion battery production specifications.

Rock Tech Lithium Inc. (CNW Group/Rock Tech Lithium Inc.)

Rock Tech has been developing and optimizing a commercially proven process technology to produce battery grade lithium hydroxide monohydrate (BG-LHM) from various spodumene concentrates. The process technology was developed to optimize conversion and purification of lithium from concentrates produced at several mining operations in Australia and North America .

The process technology was pilot tested at Anzaplan of Germany to demonstrate product quality using the process design developed for Rock Tech by Wave International of Australia . Several test programs are in progress at various equipment vendor test facilities to finalize the design and process equipment selection for commercial scale solution purification and crystallization circuits.

Through consultation with tier 1 end users, the Company planned and delivered a high-end product specification which exceeds the requirements of GB/T 26008-2020 D1, a Chinese technical standard commonly considered as the benchmark for BG-LHM. The Company has targeted such a specification in order to attract tier 1 customers, and de-risk the future marketability of the Company's product as customers continue to demand higher specification cathode materials over time.

"We are pleased with the initial test results from our batchwise pilot program in Germany ," said Don Stevens , Rock Tech's Chief Technology Officer. "The results demonstrate the functionality of our process flowsheet to produce high quality, battery grade lithium hydroxide and are key inputs into the design of our first planned commercial scale lithium hydroxide converter."

The Company has received a sample of BG-LHM as a product from the Anzaplan pilot test program and has begun shipping samples to potential customers (end-users) for product quality testing as offtake discussions progress.

"Discussions with potential LHM customers are intensifying," said Dirk Harbecke , Rock Tech's Chairman and Chief Executive Officer. "Understanding the performance of spodumene feedstock in our flowsheet and meeting potential customer product specifications are key milestones for us as we aim to build Europe's first lithium hydroxide converter."

About ANZAPLAN
The Dorfner group of companies is a leading European industrial and specialty minerals producer with more than a century of experience in industrial and specialty minerals processing, delivering high quality materials, purified products and refined additives to a wide range of industries including the chemical, pharmaceutical, electronics, ceramics and glass industry.

About Wave International
Wave International (Wave) are a leading consultancy specializing in the battery and technical metals sectors, with specific expertise in the lithium ion battery supply chain. Wave have over 18 years experience in lithium processing, including upstream mineral concentrates and downstream lithium chemical manufacturing. Wave are headquartered in Australia , with offices in the Netherlands , Mongolia and South Africa .

About Rock Tech Lithium Inc.
Rock Tech is a cleantech company powering the electric mobility revolution. The Company aims to serve the automotive industry with high-quality lithium hydroxide. Rock Tech's goal is to zero out emissions – one lithium battery at a time by becoming the first closed-loop lithium company, using and reusing lithium for a cleaner future.

On behalf of the Board of Directors,

"Dirk Harbecke"  
Dirk Harbecke
Chairman & Chief Executive Officer

Cautionary Note Concerning Forward-Looking Information
The following cautionary statements are in addition to all other cautionary statements and disclaimers contained elsewhere in, or referenced by, this news release.

Certain information set forth in this news release contains "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this news release, including those regarding Rock Tech's opinions, beliefs and expectations, business strategy, development and exploration opportunities and projects, mineral resource estimates, drilling and modeling plans, and plans and objectives of management for operations and properties constitute forward-looking information. Generally, forward-looking information can be identified by the use of words or phrases such as "estimate", "project", "anticipate", "expect", "intend", "believe", "hope", "may" and similar expressions, as well as "will", "shall" and all other indications of future tense. All forward-looking information set forth in this news release are expressly qualified in their entirety by the cautionary statements referred to in this section.

Forward-looking information is based on certain estimates, expectations, analysis and opinions that are believed by management of Rock Tech to be reasonable at the time they were made or in certain cases, on third party expert opinions. It should be noted that, in order to achieve its objectives, Rock Tech will be required to raise additional funding and the availability of financing on satisfactory terms is not guaranteed. This forward-looking information was derived utilizing numerous assumptions regarding, among other things, the supply and demand for, deliveries of, and the level and volatility of prices of, intermediate and final lithium products, expected growth, performance and business operation, prospects and opportunities, general business and economic conditions, results of development and exploration, Rock Tech's ability to procure supplies and other equipment necessary for its business, including development and exploration activities. The foregoing list is not exhaustive of all assumptions which may have been used in developing the forward-looking information. While Rock Tech considers these assumptions to be reasonable based on information currently available, they may prove to be incorrect. Forward-looking information should not be read as a guarantee of future performance or results.

In addition, forward-looking information involves known and unknown risks and uncertainties and other factors, many of which are beyond Rock Tech's control, that may cause Rock Tech's actual events, results, performance and/or achievements to be materially different from that which is expressed or implied by such forward-looking information.  Risks and uncertainties that may cause actual events, results, performance and/or achievements to vary materially include the risk that Rock Tech will not be able to meet its financial obligations as they fall due, changes in commodity prices, Rock Tech's ability to retain and attract skilled staff and to secure feedstock from third party suppliers, unanticipated events and other difficulties related to construction, development and operation of converters and mines, the cost of compliance with current and future environmental and other laws and regulations, title defects, competition from existing and new competitors, changes in currency exchange rates and market prices of Rock Tech's securities, Rock Tech's history of losses, impacts of climate change and other risks and uncertainties discussed under the heading "Financial Instruments and Other Risks" in Rock Tech's most recently filed Management Discussion and Analysis, a copy of which is filed electronically through SEDAR and is available online at www.sedar.com . Such risks and uncertainties do not represent an exhaustive list of all risk factors that could cause actual events, results, performance and/or achievements to vary materially from the forward-looking information.

We cannot assure you that actual events, results, performance and/or achievements will be consistent with the forward-looking information and management's assumptions may prove to be incorrect. Our forward-looking information reflects Rock Tech management's views as at the date the information is created. Except as may be required by law, Rock Tech undertakes no obligation and expressly disclaims any responsibility, obligation or undertaking to update or to revise any forward-looking information, whether as a result of new information, future events or otherwise, to reflect any change in Rock Tech's expectations or any change in events, conditions or circumstances on which any such information is based.

The forward-looking information contained herein is presented for the purposes of assisting readers in understanding Rock Tech's plans, objectives and goals and is not appropriate for any other purposes.

Given these uncertainties, readers are cautioned not to rely on the forward-looking information set forth in this news release.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/rock-tech-announces-results-from-lithium-hydroxide-pilot-plant-in-germany--high-quality-battery-grade-lithium-hydroxide-produced-301402278.html

SOURCE Rock Tech Lithium Inc.

News Provided by Canada Newswire via QuoteMedia

The Conversation (0)
Altech Batteries Ltd  CERENERGY Battery Project Funding Update

Altech Batteries Ltd CERENERGY Battery Project Funding Update

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce an update on funding of the CERENERGY(R) sodium-chloride solid-state battery project in Saxony, Germany.

Highlights

- Financing plan and target structure in place

- Funding investment teaser documents and data room established

- Reach out to 10 commercial banks and 2 venture debt funds - all positive interests

- Shortlisting potential lead bank

- Equity Funding - potential sale of minority interest of the project to realise capital and strategic value

- Discussions and draft term sheets shared with investors

- Offtake agreement LOI signed with ZISP

On 14 June 2024, the Company, through its Germany subsidiary Altech Batteries GmbH ("ABG"), announced the appointment of global big four professional services firm ("funding adviser") to assist in securing finance for the construction of Altech's 120MWh CERENERGY(R) battery manufacturing plant in Germany. The project's financing strategy is structured across three key areas: debt, equity, and grants.

These sources will cover not only the capital expenditures but also financing costs, working capital, debt service coverage, and an additional contingency for potential business interruptions, See Figure 1*.

DEBT PROCESS

A funding invitation document (investment teaser) has been finalised and distributed to various financial institutions for debt funding in the project. The Group has engaged ten commercial banks and two venture debt funds in a first market round, receiving predominantly positive initial feedback. Several of these institutions have expressed strong interest in participating in the financing. The Group is now in the process of shortlisting potential lenders to identify the most suitable financial partners for the project. To support a thorough due diligence process, a secure data room has been set up, providing detailed project information to interested financiers and ensuring full transparency. The DFS financial model has been adjusted to stress-test various funding scenarios tailored to the lending institutions ABG has engaged with. Further steps involve determining the most suitable banks to form a syndicate and appointing a lead bank to guide the lending process. This syndicate will play a crucial role in structuring the financing arrangement to meet the project's requirements.

EQUITY FUNDING

In addition to ongoing debt financing efforts, the Group has engaged several equity advisers to support the equity component of the project's funding package. As part of this strategy, the Altech Group plans to divest a minority interest in the project to one or two strategic investors. This partial divestment aims to attract investors who can bring not only capital, but also strategic value to the project, aligning with the CERENERGY(R) project's long-term growth and sustainability objectives.

The Group is specifically targeting large utility groups, data centre operators, investment funds and corporations that are heavily involved in the green energy transition. These entities are seen as ideal partners due to their strong alignment with the project's focus on sustainable energy solutions, as well as their capacity to provide substantial financial backing.

To date, significant progress has been made in these equity discussions. Several Non-Disclosure Agreements (NDAs) have been signed, allowing for deeper engagement with prospective investors. Altech has also circulated draft term sheets to a number of interested parties, outlining the proposed terms and conditions for investment. These documents serve as a starting point for negotiations, paving the way for more detailed discussions regarding the potential equity stake and partnership structure.

The strategic decision to divest a portion of the project is aimed at reducing the overall financial burden on the Company while bringing in experienced partners who can contribute to the project's success. By securing both the equity and debt components, the Company aims to finalise the full financing package, ensuring the timely construction and commissioning of the CERENERGY(R) battery plant. The next steps will focus on advancing these discussions and converting interest into formal commitments, which are crucial for moving forward with the project.

OFFTAKE ARRANGEMENTS

On 13 September 24, Altech announced the execution of an Offtake Letter of Intent between Zweckverband Industriepark Schwarze Pumpe (ZISP) and Altech Batteries GmbH. Under this Offtake Letter of Intent (LOI), ZISP will purchase 30 MWh of energy storage capacity annually, consisting of 1MWh GridPacks, for the first five years of production. The price of these batteries has been agreed and aligns with the sales price contained within Altech's Definitive Feasibility Study. The purchase of these batteries is subject to performance tests, battery specifications and the batteries meeting customer requirements. This offtake LOI constitutes an important aspect of the financing process. This lays the foundation for additional offtake arrangements, which are currently in progress. These agreements are vital for advancing our financing and construction timelines for the CERENERGY(R) project.

CEO and MD Mr Iggy Tan stated "The funding stage of any project is the most complex and challenging process of any project. Securing a big four funding adviser with expertise and a global network is a major step in our financing efforts. Altech is advancing both debt and equity discussions, along with offtake agreements, to fully fund the CERENERGY(R) project. We are seeing strong interest, especially from European banks and potential equity partners".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/PO741A78

To view MD Iggy Tan explain the Funding, please visit:
https://www.abnnewswire.net/lnk/23705649



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. (CSE: EPR) ("E-Power" or the "Company") announces that it has closed a third and final tranche of the private placement previously announced on September 24, 2024 (the "Private Placement"). The oversubscribed private placement was originally announced for $420,000, but a total of $526,264 was raised in all three tranches.

An aggregate of 3,150,000 units (the " Units") of the Company were issued in the third and final tranche at a price of $0.05 per Unit for gross proceeds of $157,500, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date. (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Mawson Finland Limited Presents Downhole EM  Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited Presents Downhole EM Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce results from downhole electro-magnetic "DHEM" geophysical surveys conducted at the Rajapalot gold-cobalt project in Finland

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - EDDY

Canadian Investment Regulatory Organization Trade Resumption - EDDY

Trading resumes in:

Company: Edison Lithium Corp.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Corp. (TSXV: EDDY) (OTC Pink: EDDYF) (FSE: VV0) ("Edison" or the "Company") is pleased to announce that, effective November 12, 2024, it has accepted a non-binding purchase offer letter from Mava Gasoil LLC ("Mava"), a corporation based in Houston Texas, for the sale of 100% of the interest in the Company's Argentina subsidiary, Resource Ventures S.A. ("ReVe"), in consideration for USD$3,500,000. One of the LEXI claims owned by ReVe and the royalties on that mining property, and the PINAC mining properties owned by ReVe are excluded from the sale and will be retained by Edison.

ReVe controls the rights to prospective lithium brine claims in the province of Catamarca, Argentina. The claims are principally located in the two geologic basins known as the Antofalla Salar and the Pipanaco Salar. ReVe's assets on closing of the disposition to Mava will include 30 mining concessions covering approximately 104,538 hectares area in Catamarca Province, Argentina. The Company will retain and focus its Argentinian efforts on 8 mining concessions covering approximately 35,000 hectares area in Catamarca Province, Argentina, which are not subject to the sale and amount to approximately 25% of the claims currently held by ReVe.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×