Critical Resources

Mavis Lake Delivers Further High-Grade Results, Up To 3.36% Li2o

Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased to announce assay results from the current diamond drilling campaign at the Company’s 100% owned Mavis Lake Lithium Project. The assay results illustrate the continuity of high-grade lithium mineralization within the Main Zone of Mavis Lake and present continued intercepts of extremely high-grade lithium oxide.


Highlights

  • Assay results confirm thick, high-grade intercepts, with sections of exceptionally high- grade lithium oxide at the Mavis Lake Lithium Project
  • Hole MF22-81 assay highlights of 14.7m @ 1.09% Li2O, from 146m including:
    • 8m @ 1.61% Li2O from 146.9m, and
    • 1.5m @3.36% Li2O from 151.5m
  • Hole MF22-82 assay highlights of 13.2m @ 1.30% Li2O from 163m, including:
    • 9.8m @ 1.65% Li2O from 165.63m
  • Hole MF22-85 assay highlight of 15m @ 1.19% Li2O from 148.15m, including:
    • 9.6m @ 1.72% Li2O from 149.6m
  • Recently drilled holes MF22-119 and MF22-121 assay results due mid-October 2022

Critical Resources Non-Executive Director, Mr Alex Cheeseman said:

“To follow our last results with another set of such high-grade assays is an excellent outcome for the Company, and further builds our confidence in delineating a JORC compliant resource in the near term.

We believe the last few rounds of assay results have been the some of the highest grades released by an ASX listed lithium company so far in 2022, this sets us up well to continue advancing the project and transition Critical Resources into a potential lithium project developer.”

Key assay data can be seen in Table 1 below with pegmatite cross sections included in Figure 1 and Figure 2. Full details can be seen in Appendix 1.

Table 1. Significant Assay Results from MF22-81 to MF22-86

Exploration Drilling Overview. As the Company pushes its drilling campaign to the west, the assay results confirm continued lithium mineralization, ultimately extending the confirmed strike length of the main zone which has been subject to approximately 11,000 meters of drilling in this current 2022 campaign. The high-grade lithium confirmed in the assay results correlate with visual assessments released immediately after drilling (refer to ASX Announcements of 16 June 2022 and 22 June 2022).


Click here for the full ASX Release

This article includes content from Critical Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
  Loyal Lithium Limited

Strategic Consolidation of Hidden Lake and Board Changes

Loyal Lithium Limited (ASX:LLI) (Loyal Lithium, LLI, or the Company) is pleased to announce the execution of a definitive agreement for the consolidation of the Hidden Lake Lithium Project, with Patriot Battery Metals (ASX:PMT) becoming a substantial LLI shareholder. Mr. Blair Way, Non- Executive Director and former President & CEO of Patriot Battery Metals, will join the Loyal Lithium Board of Directors, bringing valuable regional and industry expertise to guide the company's growth initiatives. The consolidation of the Hidden Lake Lithium Project provides Loyal Lithium with greater flexibility and optionality to deploy innovative exploration and development solutions.

Keep reading...Show less
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less

Latest Press Releases

Related News

×