Lundin Mining Announces Closing of $800 Million Term Loan with Additional $400 Million Accordion Available

TSX: LUN) (Nasdaq Stockholm: LUMI) Lundin Mining Corporation ("Lundin Mining" or the "Company") is pleased to announce the closing of a three-year term loan ("Term Loan") in a principal amount of $800 million, with an additional $400 million accordion becoming available upon receipt of additional binding commitments and closing of up to an additional nineteen (19%) interest in SCM Minera Lumina Copper Chile ("Lumina Copper") and satisfaction of relevant conditions precedent.

The Company has used the Term Loan to refinance the drawdown under the existing $1 .75 billion revolving credit facility used to fund the upfront cash consideration of $800 million for the acquisition of fifty-one percent (51%) of the issued and outstanding equity of Lumina Copper, which owns the Caserones copper-molybdenum mine in Chile .

The Term Loan bears interest on US dollar denominated drawn funds at an annual rate equal to the Term Secured Overnight Financing Rate plus a credit spread adjustment plus an applicable margin of 1.60% to 2.65%, depending upon the Company's net leverage ratio. The Company is working with the Co-Sustainability Structuring Agents to establish a sustainability-linked component to the Term Loan and the existing revolving credit facility. The Term Loan is unsecured, save and except for a charge over certain assets in the United States of America , and has similar covenants to the Company's existing $1.75 billion revolving credit facility.

BMO Capital Markets, ING Capital LLC and The Bank of Nova Scotia have acted as Joint Lead Arrangers and Joint Bookrunners. Bank of Montreal is acting as Administrative Agent and Bank of Montreal , Canadian Imperial Bank of Commerce, ING Capital LLC and The Bank of Nova Scotia are acting as Co-Sustainability Structuring Agent. Bank of Montreal , The Bank of Nova Scotia , ING Capital LLC, Canadian Imperial Bank of Commerce, Fédération des caisses Desjardins du Québec, The Toronto-Dominion Bank, Bank of America N.A., Canada Branch, Royal Bank of Canada , Canadian Branch and Morgan Stanley Bank N.A. acted as lenders.

The Term Loan agreement will be available for review under the Company's profile on SEDAR+ ( www.sedarplus.com ).

About Lundin Mining

Lundin Mining is a diversified Canadian base metals mining company with operations and projects in Argentina , Brazil , Chile , Portugal , Sweden and the United States of America , primarily producing copper, zinc, gold and nickel.

The information in this release is subject to the disclosure requirements of Lundin Mining under the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out below on July 27, 2023 , at 17:00 Eastern Time .

Cautionary Statement on Forward-Looking Information

Certain of the statements made and information contained herein is "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company's plans, prospects and business strategies; intentions with respect to the sustainability-linked component of the Term Loan and the existing revolving credit facility; the significant growth potential to the Company's portfolio of assets and expected synergies and potential for cost savings; the potential to unlock additional upside; expectations regarding the world shifting to a lower carbon future; the Company's expectations regarding liquidity; the anticipated development of Josemaria and other growth projects; anticipated cash costs and capital expenditures; expectations regarding 2023 production guidance; the Company's guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of pending litigation; the results of any Preliminary Economic Assessment, Feasibility Study, or Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine and mine closure plans; anticipated market prices of metals, currency exchange rates, and interest rates; the development and implementation of the Company's Responsible Mining Management System; the Company's ability to comply with contractual and permitting or other regulatory requirements; anticipated exploration and development activities at the Company's projects; the Company's integration of acquisitions and any anticipated benefits thereof, including the Caserones transaction; and expectations for other economic, business, and/or competitive factors. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements.

Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can achieve certain synergies, access financing, appropriate equipment and sufficient labour; assumed and future price of copper, nickel, zinc, gold and other metals; anticipated costs; ability to achieve goals; the prompt and effective integration of acquisitions; that the political environment in which the Company operates will continue to support the development and operation of mining projects; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: the inability to establish mutually satisfactory conditions for a sustainability-linked component; global financial conditions, market volatility and inflation, including pricing and availability of key supplies and services; risks inherent in mining including but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; project financing risks, liquidity risks and limited financial resources; volatility and fluctuations in metal and commodity demand and prices; delays or the inability to obtain, retain or comply with permits; significant reliance on a single asset; reputation risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; risks relating to the development of the Josemaria Project; inability to attract and retain highly skilled employees; risks associated with climate change; compliance with environmental, health and safety laws and regulations; unavailable or inaccessible infrastructure, infrastructure failures, and risks related to ageing infrastructure; risks inherent in and/or associated with operating in foreign countries and emerging markets, including with respect to foreign exchange and capital controls; economic, political and social instability and mining regime changes in the Company's operating jurisdictions, including but not limited to those related to permitting and approvals, environmental and tailings management, labour, trade relations, and transportation; risks relating to indebtedness; the inability to effectively compete in the industry; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration; changing taxation regimes; risks related to mine closure activities, reclamation obligations, environmental liabilities and closed and historical sites; reliance on key personnel and reporting and oversight systems, as well as third parties and consultants in foreign jurisdictions; information technology and cybersecurity risks; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits including but not limited to models relating thereto; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; ore processing efficiency; community and stakeholder opposition; financial projections, including estimates of future expenditures and cash costs, and estimates of future production may not be reliable; enforcing legal rights in foreign jurisdictions; environmental and regulatory risks associated with the structural stability of waste rock dumps or tailings storage facilities; activist shareholders and proxy solicitation matters; risks relating to dilution; regulatory investigations, enforcement, sanctions and/or related or other litigation; risks relating to payment of dividends; counterparty and customer concentration risks; the estimation of asset carrying values; risks associated with the use of derivatives; relationships with employees and contractors, and the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; conflicts of interest; existence of a significant shareholder; exchange rate fluctuations; challenges or defects in title; internal controls; compliance with foreign laws; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices, or human rights violations; the threat associated with outbreaks of viruses and infectious diseases; risks relating to minor elements contained in concentrate products; and other risks and uncertainties, including but not limited to those described in the "Risk and Uncertainties" section of the Company's Annual Information Form and the "Managing Risks" section of the Company's MD&A for the year ended December 31, 2022 , which are available on SEDAR at www.sedar.com under the Company's profile.

All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.

SOURCE Lundin Mining Corporation

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/July2023/27/c0697.html

News Provided by Canada Newswire via QuoteMedia

LUN:CA,LUNMF
The Conversation (0)
Copper bars with weight stamps, stock market chart background.

What Was the Highest Price for Copper?

Strong demand in the face of looming supply shortages has pushed copper to new heights in recent years.

With a wide range of applications in nearly every sector, copper is by far the most industrious of the base metals. In fact, for decades, the copper price has been a key indicator of global economic health, earning the red metal the moniker “Dr. Copper.” Rising prices tend to signal a strong global economy, while a significant longer-term drop in the price of copper is often a symptom of economic instability.

After bottoming out at US$2.17 per pound, or US$5,203.58 per metric ton (MT), in mid-March 2020, copper has largely been on an upward trajectory.

Keep reading...Show less
Map of Argentina with the Chilean flag placed in central Argentina.

Codelco Seeks Partial Restart at El Teniente Mine After Fatal Collapse

Chile’s state-owned copper giant Codelco is seeking approval to restart parts of its flagship El Teniente mine less than a week after a deadly collapse killed six workers and forced a full suspension of operations, according to sources familiar with the matter.

The accident, triggered by a 4.2-magnitude seismic event last Thursday (July 31), halted production at the world’s largest underground copper mine.

Keep reading...Show less
Smartphone with Anglo American logo on screen in front of a laptop showing a stock chart.

Anglo American’s Losses Widen with Diamond Slump, Trade Tensions Mounting

Anglo American (LSE:AAL,OTC Pink:AAUKF) reported a sharp US$1.9 billion net loss for the first half of 2025, deepening from US$672 million a year earlier, as the global miner pushed forward with a sweeping corporate overhaul aimed at focusing on copper and iron ore.

The London-based group’s latest results saw revenue dropping by 7 percent year-on-year to US$8.95 billion, falling short of analyst expectations, while underlying EBITDA fell 20 percent to US$3 billion.

“By focusing on our exceptional copper, premium iron ore and crop nutrients resource endowments, each with significant value-accretive growth options, we are unlocking material value for our shareholders,” Chief Executive Duncan Wanblad assured in the company’s recent performance report.

Keep reading...Show less
Peter Grandich, gold bars.

Peter Grandich: Copper, Uranium in "Perfect Storm," My Strategy Now

Peter Grandich of Peter Grandich & Co. underscored the fundamentals of the uranium market and his expectations for equities.

"I don't think uranium has to go to US$200 in order to make money,” Grandich said. "I just think it needs to go back to where it was a couple years ago, a little above US$100, and these stocks will quadruple."

Keep reading...Show less
Spools of copper wire.

Top 5 Junior Copper Stocks on the TSXV in 2025

The copper price climbed to a record high of US$5.64 per pound on the COMEX during Q2.

The rise came on the back of escalating trade tensions and economic chaos caused by US tariffs.

While copper was initially spared from tariffs at the start of the year, US President Donald Trump announced the country would be imposing a 50 percent tariff on all copper products entering the US. The news sparked speculative buying by US metals traders, who sought to position themselves ahead of the yet-to-be-announced tariff deadline.

Keep reading...Show less
Pile of raw copper nuggets on a dark background.

Barrick Backs Hercules in Leviathan-Linked Copper Expansion

Hercules Metals (TSXV:BIG,OTCQB:BADEF) has entered into a transformative agreement with Barrick Mining (TSX:ABX,NYSE:B) to acquire a vast package of unpatented copper claims surrounding its Leviathan discovery in western Idaho.

Hercules will have the option to acquire a 100 percent interest in more than 74,000 acres of claims, collectively known as the Olympus belt, that flank both sides of the company’s existing Hercules property.

If exercised, the deal would expand Hercules’ total land position from 26,000 acres to over 100,000 acres, granting it control over a 73 kilometer stretch of highly prospective terrain.

The transaction is structured as an option agreement through Hercules’ US subsidiary, Anglo-Bomarc, with Barrick Gold Exploration, a wholly owned subsidiary of Barrick Mining.

Keep reading...Show less

Latest Press Releases

Related News

×