Lumina Gold Announces Receipt of First Early Deposit Payment of US$12M from Wheaton Precious Metals

Lumina Gold Announces Receipt of First Early Deposit Payment of US$12M from Wheaton Precious Metals

Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce that it has received the first US$12 million payment (the "First Early Deposit Payment") under the previously announced precious metals purchase agreement (the "Gold Stream") with Wheaton Precious Metals International Ltd. ("Wheaton") in relation to its 100% owned Cangrejos gold-copper project located in El Oro Province, Ecuador (the "Project" or "Cangrejos").

Lumina Gold Corp. Logo (CNW Group/Lumina Gold Corp.)

The principal terms of the First Early Deposit Payment and the Gold Stream are as described in the Company's news release dated May 16, 2023 , whereby Wheaton will pay a total of US$300 million to acquire  6.6% of the payable gold produced from the Project until 700,000 ounces of gold have been delivered, and 4.4.% thereafter, with US$48 million being paid as an early deposit pre-construction and US$252 million being paid during construction.

The Company also wishes to clarify information disclosed in its May 16, 2023 news release, to revise the original statement from "Wheaton will pay a production payment representing 18.0% of the spot price of gold for the first 700,000 ounces and 22.0% of the spot price of gold thereafter" to "Wheaton will make ongoing payments for the gold ounces delivered equal to 18.0% of the spot price of gold until the uncredited deposit is reduced to nil and 22.0% of the spot price of gold thereafter".

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Preliminary Feasibility Study (the "PFS") for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

Follow us on: Twitter , Linkedin or Facebook .

Further details are available on the Company's website at https://luminagold.com/ . To receive future news releases please sign up at https://luminagold.com/contact .

Lumina Gold Corp.

Signed: "Marshall Koval"

Marshall Koval , President & CEO, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: the Company's decision and ability to develop the Project into a producing mine; payment by Wheaton of $300 million to Lumina and the satisfaction of each party's obligations in accordance with the Gold Stream; and the delivery to Wheaton of gold production in respect of the Project. Often, but not always, forward-looking statements or information can be identified by the use of words such as "will" or "projected" or variations of those words or statements that certain actions, events or results "will", "could", "are proposed to", "are planned to", "are expected to" or "are anticipated to" be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about general business and economic conditions; the prices of gold, copper and silver; the Company's ability to meet its obligations under the Gold Stream and other material agreements; the accuracy and reliability of technical data, forecasts, estimates and studies, including the PFS; the accuracy of slope guidance underlying the engineered pit design; estimates of mineral resources and mineral reserves; anticipated costs and expenditures; future results of operations; ability to satisfy power infrastructure and water capacity requirements; availability and ability to procure personnel, machinery, supplies, and equipment from local sources where possible; the characteristics of the Project producing innate positive environmental impacts; tax rates and royalty rates applicable to the Project; the relationship between the Company and the local communities and its business partners; ability to operate in a safe and effective manner; and the success of exploration, development and processing activities. The foregoing list of assumptions is not exhaustive.

Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks relating to exploration activities and accurately predicting mineralization; the timing and ability of the Company to obtain necessary permits; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); capital costs varying significantly from estimates; business and economic conditions in the mining industry generally; risks associated with the business of the Company; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; inflation and credit risks; risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/lumina-gold-announces-receipt-of-first-early-deposit-payment-of-us12m-from-wheaton-precious-metals-301835971.html

SOURCE Lumina Gold Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/May2023/26/c8359.html

News Provided by Canada Newswire via QuoteMedia

LUM:CC
The Conversation (0)
Lumina Gold Announces US$10.2 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Announces US$10.2 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) (the "Company" or "Lumina") is pleased to announce that under the previously announced US$300 million precious metals purchase agreement (the "PMPA") with Wheaton Precious Metals International Ltd., a wholly owned subsidiary of Wheaton Precious Metals Corp. ("Wheaton"), the Company has drawn an additional installment of US$10.2 million . The draw consisted of two tranches, US$9 million which was due twelve months after the initial draw in May 2023 and US$1.2 million related to specific pre-construction acquisition transactions.

Lumina Gold Corp. Logo (CNW Group/Lumina Gold Corp.)

The PMPA has been amended to modify the US$15 million that was due in May 2024 to US$9 million payable immediately and the remaining US$6 million payable on December 2, 2024 . This amendment was made because Lumina has not yet finalized terms for the exploitation contract with the Government of Ecuador , which was a condition for the US$15 million being received. The December 2, 2024 payment is conditional on the finalization of the exploitation contract term sheet between Lumina and the Government of Ecuador .

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Pre-Feasibility Study for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

Follow us on: Twitter , Linkedin or Facebook .

Further details are available on the Company's website at https://luminagold.com/ . To receive future news releases please sign up at https://luminagold.com/contact .

Lumina Gold Corp.

Signed: "Marshall Koval"

Marshall Koval , President & CEO, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward-Looking Information

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to: the Company's ability to finalize the exploitation contract terms with the Government of Ecuador before December 2, 2024 . Often, but not always, forward-looking statements or information can be identified by the use of words such as "will" or "projected" or variations of those words or statements that certain actions, events or results "will", "could", "are proposed to", "are planned to", "are expected to" or "are anticipated to" be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including among other things, assumptions about: the Company's ability to meet its obligations under the PMPA; general business and economic conditions; the prices of gold and copper; and anticipated costs and expenditures. The foregoing list of assumptions is not exhaustive.

Although management of the Company believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the Company's actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to: risks associated with the business of the Company; business and economic conditions in the mining industry generally; the supply and demand for labour and other project inputs; changes in commodity prices; changes in interest and currency exchange rates; risks relating to inaccurate geological and engineering assumptions (including with respect to the tonnage, grade and recoverability of reserves and resources); risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters); risks relating to adverse weather conditions; political risk and social unrest; changes in general economic conditions or conditions in the financial markets; and other risk factors as detailed from time to time in the Company's continuous disclosure documents filed with Canadian securities administrators. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/lumina-gold-announces-us10-2-million-wheaton-precious-metals-draw-and-amendment-to-the-pmpa-302160826.html

SOURCE Lumina Gold Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/May2024/31/c5772.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold Corp. Presents in Red Cloud's Virtual Webinar Series

Lumina Gold Corp. Presents in Red Cloud's Virtual Webinar Series

Lumina Gold Corp. (TSXV: LUM) is pleased to announce that the company is presenting a live virtual corporate update hosted by Red Cloud Financial Services on May 22nd, 2024 at 2:00pm ET.

We invite our shareholders, and all interested parties to register for the webinar and participate in the live Q&A session at the end of the presentation moderated by Red Cloud.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lumina Gold

Lumina Gold Appoints Feasibility Study Consultants

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) ("Lumina" or the "Company") is pleased to announce that it has appointed Ausenco Engineering Canada ULC ("Ausenco") to lead the Feasibility Study on its Cangrejos Gold-Copper Project ("Cangrejos" or the "Project") in southwest Ecuador . Lumina is expecting the Feasibility Study to be completed in H1 2025. Along with Ausenco, Lumina has appointed a full team of consultants to support the completion of the Feasibility Study. Key consultants and responsibilities are listed below in Table 1.

Table 1: Appointed Consultants

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold Engages a Market Maker

Lumina Gold Engages a Market Maker

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) (the "Company" or "Lumina") announces that it has engaged Integral Wealth Securities Limited ("Integral") to provide services as a market maker in compliance with the policies and guidelines of the TSX Venture Exchange and other applicable legislation. Under the agreement, Integral will receive a fee of C$6,000 plus applicable taxes per month. The initial term of the agreement is three (3) months from the date of execution with an option to renew.

Lumina Gold Corp. (TSXV: LUM) is a Vancouver, Canada based precious and base metals exploration and development company focused on the Cangrejos Gold-Copper Project located in El Oro Province, southwest Ecuador . In 2023, the Company completed a Pre-Feasibility Study for Cangrejos, which is the largest primary gold deposit in Ecuador . Lumina has an experienced management team with a successful track record of advancing and monetizing exploration projects.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Lumina Gold

Lumina Gold Announces Results from 19,000 metre Drill Program at Cangrejos; Including 85 metres Grading 2.42 g/t Gold Equivalent from Surface and Open to Depth

Highlights from 7,800 metre diamond hole (35-151 metres) Resource Conversion Drill Program:

  • Hole C23-265: 2.47 g/t gold equivalent over 85 metres from surface to end of hole.
  • Hole C23-302: 1.75 g/t gold equivalent over 113 metres from 2 metres to end of hole.
  • Hole C23-317: 1.86 g/t gold equivalent over 96 metres from surface to end of hole.
  • Highest gold assay ever on the project in hole C23-253, 2 metres from 40 to 42 metres grading 580 g/t Au.

Lumina Gold Corp. (TSXV: LUM) (OTCQX: LMGDF) (the "Company" or "Lumina") is pleased to announce results from the 2023 Phase 1 mining resource conversion drilling campaign in support of the ongoing Feasibility Study ("FS") at its Cangrejos Project (the "Project") in Ecuador . Resource drilling comprised part of a larger drill campaign at the Cangrejos and Gran Bestia deposits which also included, metallurgical samples and geotechnical holes with subsequent hydrogeological testing in support of pit slope design. The 2023 drill program at the Project is summarized below in Table 1.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Quetzal Copper Provides Update on Financing

Quetzal Copper Provides Update on Financing

Quetzal Copper Corp. (TSXV: Q) ("Quetzal" or the "Company") announces a non-brokered private placement (the "Offering") for aggregate gross proceeds of up to C$3,000,000, from the sale of the following:

  • up to 6,666,666 units of the Company (the "Units") at a price of C$0.15 per Unit for gross proceeds of up to C$1,000,000 from the sale of Units; and
  • up to 11,764,705 flow through units of the Company (the "FT Units") at a price of C$0.17 per FT Unit for gross proceeds of up to C$2,000,000 from the sale of FT Units. Each FT Share will be issued as a "flow-through share" within the meaning of the Income Tax Act (Canada).

Each Unit and FT Unit issued under the Offering shall consist of one common share in the capital of the Company (each, a "Common Share") and one-half of one Common Share purchase warrant (each whole warrant, a "Warrant"). Each Warrant will entitle the holder thereof to acquire one Common Share at an exercise price of $0.25 per Common Share for a period of 24 months from the closing of the Offering (the "Closing").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Silver47 Exploration Corp.  Opens the Market

Silver47 Exploration Corp. Opens the Market

Gary Thompson, Chief Executive Officer, Silver47 Exploration Corp. ("Silver47" or the "Company") (TSXV: AGA), and his team, joined Dean McPherson, Head, Business Development, Global Mining, Toronto Stock Exchange (TSX), to open the market to celebrate the Company's new listing on the TSX Venture Exchange.

Silver47 Exploration Corp. is focused on rapidly expanding its resource base of silver, gold, copper, zinc and lead, with the aim of reaching a milestone development decision in the next 3-5 years, while also driving new discoveries.

Backed by industry leaders, the Company is advancing its flagship Red Mountain project in Alaska, which currently hosts 168.6 million ounces of silver at 336 g/t AgEq, equivalent to 1 million tonnes of zinc at 7% ZnEq or 2 million ounces of gold at 4 g/t AuEq.

Silver47's initial focus is on increasing the silver-gold rich Dry Creek and West Tundra Flats resources at the eastern end of this district-scale land package, with an exploration target of 50Mt in the 300-400 g/t AgEq grade range for 480Moz Eq. The company's extensive land holdings of 942 state mining claims and one mining lease cover a 60km trend of polymetallic mineralization.

MEDIA CONTACT:
Gary Thompson
President & CEO
info@silver47.ca
403-870-1166

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/233679

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Corporate Update

Osisko Metals Corporate Update

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Osisko Metals Incorporated (the " Company " or " Osisko Metals ") ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: OB51 ) announces, further to its news release dated November 18, 2024 (entitled " Osisko Metals Expands Leadership Team and Announces C$100 Million Bought Deal Financing " ), the following changes to Osisko Metals' leadership team:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Bold Ventures Identifies New Gold Zone at Its Burchell Gold and Copper Property

Bold Ventures Identifies New Gold Zone at Its Burchell Gold and Copper Property

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") is pleased to announce that it has received assays up to 56.9 gt gold (Au) from a newly identified zone at its Burchell Property ("the Property"), sampled during a prospecting and field reconnaissance program in November of this year. The high-grade sample was collected approximately 15 meters southwest of 2023 samples which returned between 0.04 and 0.51 gt Au. The zone has now been named the 111 (one-eleven) Zone. A geological sketch map of the outcrop exposure was made and three grab samples were collected along or near the zone during the 2024 program (see Table 1 below for coordinates, descriptions, and results). Assay results ranged from

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×