Noram Lithium

IIROC Trading Halt - NRM

The following issues have been halted by IIROC:

Company: Noram Lithium Corp.

TSX-Venture Symbol: NRM

All Issues: Yes

Reason: At the Request of the Company Pending News

Halt Time (ET): 7:45 AM

IIROC can make a decision to impose a temporary suspension (halt) of trading in a security of a publicly-listed company. Trading halts are implemented to ensure a fair and orderly market. IIROC is the national self-regulatory organization which oversees all investment dealers and trading activity on debt and equity marketplaces in Canada .

SOURCE Investment Industry Regulatory Organization of Canada (IIROC) - Halts/Resumptions

Cision View original content: https://www.newswire.ca/en/releases/archive/February2022/07/c0875.html

News Provided by Canada Newswire via QuoteMedia

NRM:CA
The Conversation (0)
Noram Lithium Provides Update

Noram Lithium Provides Update

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is providing a corporate update and an update on its 100% owned Zeus Lithium Project ("Zeus" or the "Project"), located in Clayton Valley, Nevada

Zeus Lithium Project Update

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Engages CDMG for Marketing Services

Noram Lithium Engages CDMG for Marketing Services

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announces that it has engaged Creative Direct Marketing Group Inc. ("CDMG") to provide the Company with marketing services and to raise public awareness of the Company

"A leader in targeted advertising, Creative Direct Marketing Group, Inc is a full-service, direct response advertising and digital marketing agency with one goal in mind: increasing your response, market presence, and profits through ‘accountable advertising.' For more than 40 years, we've helped turn entrepreneurial start-ups into large companies and large companies into multibillion-dollar businesses" commented CDMG.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Announces Appointment of Vice President, Project Development

Noram Lithium Announces Appointment of Vice President, Project Development

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announced today it has appointed Mr. Glenn Barr as Vice President, Project Development, effective immediately

Mr. Barr has more than 25 years of experience in complex mining project development. Most recently he was Vice President, Project Development at Twin Metals Minnesota (TMM). His work included leading engineering studies, overseeing metallurgical test work programs and integrating environmental protection measures into project design. Prior to TMM, he held various roles at Stantec and Teck. As an Engineering Liaison at Stantec, he guided the environmental and engineering consultants in ensuring alignment and work efficiencies. While at Teck, he was integral in the development and commercialization of a novel hydrometallurgical process, and was a key member of the team that engineered and constructed a hydrometallurgical processing plant in Brazil. Mr. Barr holds a Bachelor of Science, Chemistry from the University of Victoria.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Engages Ausenco To Complete the Pre-Feasiblity Study for the Zeus Lithium Project

Noram Lithium Engages Ausenco To Complete the Pre-Feasiblity Study for the Zeus Lithium Project

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announces it has engaged Ausenco Engineering Canada Inc. ("Ausenco") to lead the Pre-Feasibility Study ("PFS") of its 100% owned Zeus Lithium Project ("Zeus" or the "Project") in Clayton Valley, Nevada

The Company recently engaged SRK Consulting Inc ("SRK") to produce an optimized mine plan for Zeus (see news release dated February 7, 2023) and initiated a further round of metallurgical testing with Kemetco Research Inc ("Kemetco") to confirm and refine the process design for the Project (see news release dated February 14, 2023). Both of these ongoing work streams will form the basis of the PFS, now being managed by Ausenco.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Lithium Files NI43-101 Technical Report for Zeus Lithium Project

Noram Lithium Files NI43-101 Technical Report for Zeus Lithium Project

noram lithium corp. ("noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) announced today that it has filed on SEDAR a National Instrument 43-101 ("NI 43-101") technical report (the "Report") titled "Updated Resource Estimate Zeus Lithium Project". The technical report supports the updated Mineral Resource Estimate announced on January 30, 2023 and is available for review on both SEDAR (www.sedar.com) and the Company's website (www.noramlithiumcorp.com). There are no material differences in the mineral resources reported in the news release of January 30, 2023 and those described in the report

About noram lithium corp.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×