Datametrex Completes Acquisition of Cereal Crunch Mobile Blockchain Game from Sariel Diagnostics

Datametrex Completes Acquisition of Cereal Crunch Mobile Blockchain Game from Sariel Diagnostics

Datametrex AI Limited (TSXV: DM) (FSE: D4G) (OTC Pink: DTMXF) (the "Company" or "Datametrex") is pleased to announce that further to its press release dated April 8, 2024, the Company completed the arm's length acquisition of the mobile blockchain game Cereal Crunch from Sariel Diagnostics Corp. ("Sariel"). The deal was closed following the signing of a Definitive Agreement dated May 9, 2024.

Key Acquisition Details

Asset Highlights: Datametrex acquires all assets related to Cereal Crunch, including the game software, intellectual property, user databases, and the Crunch Token, which is integral to the game's play-to-earn model, as well as roughly $150,000 in cash.

Purchase Price: The acquisition was finalized for a total value of $3,500,000, comprising 70,000,000 common shares of Datametrex issued at a deemed price of $0.05 per share.

Gaming Innovation: With match-3 mechanics and a play-to-earn model rewarding players in cryptocurrency, Cereal Crunch uniquely blends gaming entertainment with the potential for crypto earnings.

Charles Park, President of Datametrex, commented, "The acquisition of Cereal Crunch aligns perfectly with our strategic focus on innovative technologies. We are excited to bring Cereal Crunch into our portfolio, offering immense potential for growth and success in this emerging sectors of e-gaming and blockchain."

John Karagiannidis, President of Sariel Diagnostics Corp., stated, "This acquisition signifies a major milestone for Sariel, validating our hard work on Cereal Crunch. Datametrex is the ideal partner to lead the game's development to new heights."

All of the common shares issued in connection with acquisition are subject to a statutory hold period of four months and one day. The issuance is being conducted on an expedited basis pursuant to the policies of the TSX Venture Exchange and is subject to final acceptance by the TSX Venture Exchange. The transaction was negotiated at arm's length and no new insider of Datametrex has been created as a result of the closing of the acquisition.

About Datametrex

Datametrex is an innovative leader in Technology Solutions, Artificial Intelligence, Healthcare, and Mobile Gaming. The Company excels in delivering tools and solutions that enhance operational efficiencies and business outcomes. With a commitment to innovation, Datametrex is dedicated to supporting enterprises by setting a new standard for business protocols through cutting-edge technology.

For more on Datametrex, please visit our YouTube channel and Company website.

About Sariel

Sariel is a pioneering crypto and AI technology company committed to investing in and building play-to-earn blockchain games and advanced AI solutions.

For more on Sariel, please visit the Company website.

For Additional Information

Charles Park, CFA

Chief Executive Officer & Director

cpark@datametrex.com

(416) 901-5611 x203

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains statements that constitute "forward-looking statements". Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause Datametrex's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Such statements include those relating to game development and the Company's expectations and plans. Although Datametrex believes the forward-looking information contained in this news release is reasonable based on information available on the date hereof, by their nature, forward-looking statements involve assumptions, known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks and uncertainties associated with general economic conditions; adverse industry events; future legislative and regulatory developments in the blockchain sector; the Company's ability to access sufficient capital from internal and external sources, and/or inability to access sufficient capital on favorable terms; mobile video game industry and markets in Canada and generally; the ability of Datametrex to implement its business strategies; competition; and other assumptions, risks and uncertainties. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. While the Company may elect to, it does not undertake to update this information at any particular time except as required in accordance with applicable laws. The foregoing statements expressly qualify any forward-looking information contained herein. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements are described under the caption "Risk Factors" in Datametrex's management's discussion and analysis for the year ended December 31, 2023 which is available on Datametrex's profile at http://www.sedarplus.ca.

This news release does not constitute an offer to sell or the solicitation of an offer to buy, and shall not constitute an offer, solicitation or sale in any state, province, territory or jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such state, province, territory or jurisdiction.

We seek Safe Harbor.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/210724

News Provided by Newsfile via QuoteMedia

DM
The Conversation (0)
Osisko Metals Releases 2024 Pine Point Mineral Resource Estimate: 49.5Mt of Indicated Mineral Resources Grading 5.52% ZnEq and 8.3Mt of Inferred Mineral Resources Grading 5.64% ZnEq

Osisko Metals Releases 2024 Pine Point Mineral Resource Estimate: 49.5Mt of Indicated Mineral Resources Grading 5.52% ZnEq and 8.3Mt of Inferred Mineral Resources Grading 5.64% ZnEq

Osisko Metals Incorporated (the " Company " or " Osisko Metals ") ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: 0B51 ) is pleased to announce the 2024 Mineral Resource Estimate Update (" 2024 MRE ") for the Pine Point Project ("Pine Point" or "the Project"), located near Hay River, in the Northwest Territories of Canada. The 2024 MRE was prepared by BBA Inc. ("BBA") and PLR Resources Inc. and will form the resource base for a Feasibility Study ("FS") that is planned to officially start in Q3 2024. Cut-off grades are based on estimated long-term metal prices, mining costs, metal recoveries, concentrate transport, and smelter costs. The definition drill program supporting the 2024 MRE was executed between 2018 and 2024.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Patriot Expands High-Grade "Vega Zone" at CV13 with Multiple Drill Intercepts

Patriot Expands High-Grade "Vega Zone" at CV13 with Multiple Drill Intercepts

Highlights
  • Significant expansion to the recently discovered high-grade zone (herein termed the " Vega Zone ") at the CV13 Spodumene Pegmatite. Highlights include:
    • 33.4 m at 2.40% Li 2 O , including 11.1 m at 4.33% Li 2 O , and 17.6 m at 1.89% Li 2 O , including 5.6 m at 3.40% Li 2 O (CV24-507).
    • 43.2 m at 1.10% Li 2 O , including 12.9 m at 3.06% Li 2 O (CV24-498).
    • 27.1 m at 1.02% Li 2 O including 7.6 m at 2.39% Li 2 O (CV24-513).
    • 32.1 m at 0.78% Li 2 O , including 10.7 m at 2.17% Li 2 O (CV24-499).
  • Vega Zone is open in several directions with multiple step-out holes remaining to be reported.
    • High-grade mineralization is relatively flat-lying to shallow dipping and has now been delineated over a significant area and thickness.
  • Highest individual core sample assay reported to date at Corvette – 1.7 m at 7.01% Li 2 O (CV24–507, Vega Zone).
  • Along the western arm at CV13, mineralized pegmatite has been extended down-dip to over 400 m (~190 m vertical depth from surface) with intercepts including 13.5 m at 1.15% Li 2 O (CV24-497), and 8.6 m at 1.21% Li 2 O (CV24–518).
  • Results for 32,149 m (83 holes) remain to be reported from the 2024 winter drill program – 27,611 m (67 holes) at CV5, and 4,538 m (16 holes) at CV13.
  • The Vega Zone will be a key target for the upcoming summer drill program, with details of the program to be released to the market in the coming weeks.

June 11, 2024 Sydney, Australia

Patriot Battery Metals Inc. (the "Company" or "Patriot") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce the next batch of core assay results from the CV13 Spodumene Pegmatite, including holes targeting the recently discovered high-grade zone (herein termed the "Vega Zone"), from its recently completed 2024 winter drill program at Corvette. The Corvette Property (the "Property" or "Project"), wholly owned by the Company, is located in the Eeyou Istchee James Bay region of Quebec . The CV13 Spodumene Pegmatite is located approximately 3 km west-southwest of the CV5 Spodumene Pegmatite, which hosts a maiden mineral resource estimate ("MRE") of 109.2 Mt at 1.42% Li 2 O inferred 1 and is situated approximately 13.5 km south of the regional and all–weather Trans-Taiga Road and powerline infrastructure.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Desktop Metal to Effect a Reverse Stock Split

Desktop Metal to Effect a Reverse Stock Split

DM common stock expected to begin trading on a 1-to-10 split-adjusted basis on June 11, 2024

Desktop Metal, Inc. (NYSE: DM) (the "Company") announced today that its Board of Directors has approved a 1-for-10 reverse stock split of the Company's Class A common stock. The reverse stock split will become effective at 5:00 p.m. Eastern Time on June 10, 2024, after close of trading on the New York Stock Exchange ("NYSE"). The Company's Class A common stock is expected to commence trading on a split-adjusted basis when the markets open on June 11, 2024 under the existing trading symbol "DM." The new CUSIP number for the Company's Class A common stock following the reverse stock split will be 25058X 303.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Desktop Metal Introduces PureSinter - a High-Purity Vacuum Furnace that Delivers Premium Debind-and-Sinter Performance at an Affordable Price

Desktop Metal Introduces PureSinter - a High-Purity Vacuum Furnace that Delivers Premium Debind-and-Sinter Performance at an Affordable Price

  • PureSinter offers one-run debinding and sintering of metal parts produced with either Additive Manufacturing or traditional manufacturing methods in a 15.8L retort
  • In development for five years, this all-new furnace was designed for ease-of-use, premium performance, reliability, and low cost of acquisition and operation
  • PureSinter features a revolutionary, patent-pending machine design that delivers parts-per-billion levels of purity in a high-efficiency, airtight processing environment — ensuring a clean and reliable furnace with low operating costs
  • With more than 17 fans and a pop-out ceiling vent, PureSinter can cool from 1,420°C to 200°C in less than four hours without expensive water-cooled walls
  • Titanium parts sintered in PureSinter demonstrate better performance results for density, tensile strength, and elongation than an all-metal retort third-party furnace with lower energy consumption and without complex setup requirements and getter materials
  • The first PureSinter Furnace has been installed at FreeFORM Technologies, a metal binder jet contract manufacturer based in St. Marys, Pennsylvania, and the largest owner of a Super Fleet of 24 Desktop Metal 3D printers, to validate new materials
  • Standard shipments of the PureSinter Furnace — which is now validated with 14 metal powder and binder combinations, with more to follow — are slated to begin in Q3
  • The Desktop Metal PureSinter Furnace will make its global debut June 25-27 in Los Angeles at Rapid + TCT, North America's largest additive manufacturing and industrial 3D printing event

Desktop Metal (NYSE: DM), a global leader in Additive Manufacturing 2.0 technologies for mass production, today announced the launch of the all-new PureSinterâ„¢ Furnace for high-purity, one-run debinding and sintering of powder metal parts.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240604917213/en/

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Lithium Ionic Announces Feasibility Study Results for the Bandeira Lithium Project, Minas Gerais, Brazil

Lithium Ionic Announces Feasibility Study Results for the Bandeira Lithium Project, Minas Gerais, Brazil

  • 178,000tpa of spodumene concentrate production (5.5% Li 2 O)
  • 14-year mine life
  • After-tax NPV 8 of US$1.3B; IRR of 40%
  • All-in operating costs of $444/t SC5.5

*All amounts expressed in U.S. dollars unless otherwise noted

Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") is pleased to announce the results of a Feasibility Study ("FS" or "Study") for its 100%-owned Bandeira Lithium Project ("Bandeira" or the "Project") located in Minas Gerais, Brazil. The Bandeira claims span 157 hectares, which represents only about 1% of Lithium Ionic's extensive 14,182-hectare land package in Brazil's 'Lithium Valley', a region of global significance for hard-rock lithium production.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×