CanAlaska Acquires New Project Along Prolific Mineralized Corridor In Eastern Athabasca Basin

CanAlaska Acquires New Project Along Prolific Mineralized Corridor In Eastern Athabasca Basin

25 Kilometres of Roughrider Mineralized Corridor Staked

Highly Anomalous Lake Sediment Sample Identified

Meet Management at the Vancouver Resource Investment Conference

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) ("CanAlaska or the "Company") is pleased to announce the Company's newly acquired Frontier project, totalling 15,929 hectares, in the northeastern Athabasca Basin. The Frontier project is located approximately 30 kilometres northeast of the McClean Lake mill complex and Roughrider uranium deposit, and 35 kilometres north of Cameco's Eagle Point uranium mine (Figure 1).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2864/151657_eae1af7a54c32af4_002.jpg

Figure 1 – Frontier Project Location

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/2864/151657_eae1af7a54c32af4_002full.jpg

The Frontier project is located five kilometres northeast of the present-day Athabasca Basin edge. Compilation work on the project has highlighted a prominent 25-kilometre-long northeast trending magnetic low corridor. This regional-scale corridor, which continues off property to the southwest, hosts multiple uranium deposits and showings, including Roughrider, Midwest, J Zone, Dawn Lake, Moonlight, Osprey, and the McClean Lake mine (mined-out Jeb deposit) and mill complex. This regional-scale corridor is termed here as the Roughrider Mineralized Corridor ("RMC"). Within the Frontier project the RMC is bound by magnetic high bodies to the east and west that are interpreted to represent Archean domes, providing a suitable and favourable geological scenario for the formation of large fault structures.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2864/151657_eae1af7a54c32af4_004.jpg

Figure 2 – Exploration Target Corridor Frontier Project

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/2864/151657_eae1af7a54c32af4_004full.jpg

A major northeast trending structure has been mapped along the western margin of the magnetic low corridor that is cross-cut by multiple north-south trending magnetic structure lineaments (Figure 2). Southwest of the property, this same lineament is associated with a large jog in the Athabasca Basin edge that is interpreted to represent structural offset. The interplay between structures along long linear magnetic low corridors is typical of many unconformity uranium deposits in the Athabasca Basin and allows for the creation of structural traps for potential uranium deposition. As a result, the Company believes this section of the RMC represents a key underexplored target area for basement-type uranium mineralization.

The Frontier project has undergone very limited historical exploration. Gulf Minerals Company completed an airborne radiometric survey, followed by prospecting and mapping in the 1960's. Airborne radiometric, magnetic, and electromagnetic surveys were flown in the 1970's by Gulf Minerals Company and Canadian Superior Exploration Ltd. These surveys were followed by ground-based prospecting, mapping, lake sediment and boulder sampling, and VLF-EM surveying. In the early 1990's, as part of a regional lake-sediment sampling program, the Geological Survey of Canada collected a sample on Point Lake which returned 34.7 ppm uranium associated with elevated cobalt, copper, molybdenum, and nickel. In 2007, Hathor Exploration Ltd., discoverer of the nearby basement-hosted Roughrider uranium deposit, conducted a detailed aeromagnetic survey that covered the entire Frontier property and a small VTEM (Versatile Time Domain Electromagnetics) survey and lake sediment sampling program that covered only the very southern portion. The Frontier property has no known drillholes completed within its boundaries.

The Company believes the next steps for the Frontier project include property-wide modern high-resolution airborne radiometric, VTEM, and gravity surveys followed by ground-based prospecting. This combination of geophysical techniques is well suited toward identification of basement-hosted uranium targets for follow-up drilling programs. The Company is completing further compilation work on the newly acquired Frontier project and is actively seeking Joint Venture partners to move the project forward.

CanAlaska CEO, Cory Belyk, comments, "This is a very exciting new project generated by our talented geologists along one of the most important mineralized corridors in the eastern Athabasca Basin near critical milling infrastructure. The Roughrider uranium deposit discovery was one of the most important in the last uranium cycle anywhere in the world reigniting interest in the northeastern area of the Basin. The Frontier project is a geological extension of the Roughrider Mineralized Corridor and has never had modern survey methods applied toward basement-hosted uranium deposit discovery. Congratulations to the CanAlaska team for recognizing this opportunity at the entry to the next uranium bull market which we believe is upon us. The timing could not be better for our shareholders as the team applies its project generation methodology to create an incredible discovery opportunity in the Saudi Arabia of Uranium."

Other News

The Company is drilling on its West McArthur project in the eastern Athabasca Basin. The 2023 West McArthur drill program is focused on advancing the Company's new high-grade Pike Zone uranium discovery. The primary goals for the winter drill program are the Pike Zone unconformity target and continued definition of the dimensions and controls of the Pike Zone basement mineralization.

In addition, the Company is preparing for its first drilling program on the Key Extension project, located in the southeastern Athabasca Basin region near the Key Lake mine and mill complex. The 2023 Key Extension drill program, planned to begin in February, will focus on exploration of newly defined targets generated through a series of geophysical programs completed in 2022.

The Company will be attending the Vancouver Resource Investment Conference ("VRIC") on January 29th and 30th in Vancouver, BC and will have representatives at booth #435.

About CanAlaska Uranium

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) holds interests in approximately 300,000 hectares (750,000 acres), in Canada's Athabasca Basin - the "Saudi Arabia of Uranium." CanAlaska's strategic holdings have attracted major international mining companies. CanAlaska is currently working with Cameco and Denison at two of the Company's properties in the Eastern Athabasca Basin. CanAlaska is a project generator positioned for discovery success in the world's richest uranium district. The Company also holds properties prospective for nickel, copper, gold and diamonds. For further information visit www.canalaska.com.

The qualified technical person for this news release is Nathan Bridge, MSc., P.Geo., CanAlaska's Vice President, Exploration.

On behalf of the Board of Directors
"Cory Belyk"
Cory Belyk, P.Geo., FGC
CEO, Executive Vice-President and Director
CanAlaska Uranium Ltd.

Contacts:

Cory Belyk, Executive VP and CEO
Tel: +1.604.688.3211 x 306
Email: cbelyk@canalaska.com

General Enquiry
Tel: +1.604.688.3211
Email: info@canalaska.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking information

All statements included in this press release that address activities, events or developments that the Company expects, believes or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements involve numerous assumptions made by the Company based on its experience, perception of historical trends, current conditions, expected future developments and other factors it believes are appropriate in the circumstances. In addition, these statements involve substantial known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will prove inaccurate, certain of which are beyond the Company's control. Readers should not place undue reliance on forward-looking statements. Except as required by law, the Company does not intend to revise or update these forward-looking statements after the date hereof or revise them to reflect the occurrence of future unanticipated events.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/151657

News Provided by Newsfile via QuoteMedia

CVV:CA
The Conversation (0)
CanAlaska Announces Senior Management Change

CanAlaska Announces Senior Management Change

Misty Urbatsch, Vice-President Corporate Development, Resigns Position to Focus on Core Nickel Corp

Appointed to Advisory Board of CanAlaska

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Increases Private Placement Financing to $12 Million

CanAlaska Increases Private Placement Financing to $12 Million

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") announces that further to its news release of November 20, 2023, due to increased demand, it is increasing the total gross amount to be raised under its non-brokered private placement to $12 million (the "Offering"). The Offering will be comprised of a combination of: (i) non-flow-through units (the "NFT Units") to be sold at a price of $0.36 per NFT Unit; (ii) flow-through units of the Company (each, a "FT Unit") to be sold at a price of $0.425 per FT Unit; and (iii) flow-through units to be sold to charitable purchasers (each, a "Charity FT Unit") to be sold at a price of $0.5575 per Charity FT Unit.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Announces up to $7.5 Million Private Placement Financing

CanAlaska Announces up to $7.5 Million Private Placement Financing

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") announces that it proposes to undertake a non-brokered private placement of securities to raise total gross proceeds of up to $7.5 million (the "Offering"). The Offering will be comprised of a combination of: (i) non-flow-through units (the "NFT Units") to be sold at a price of $0.36 per NFT Unit; (ii) flow-through units of the Company (each, a "FT Unit") to be sold at a price of $0.425 per FT Unit; and (iii) flow-through units to be sold to charitable purchasers (each, a "Charity FT Unit") to be sold at a price of $0.5575 per Charity FT Unit.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Reports Large Gravity Targets Identified at Geikie Project in Athabasca Basin

CanAlaska Reports Large Gravity Targets Identified at Geikie Project in Athabasca Basin

Airborne Gravity Survey Highlights Numerous Targets Coincident with Regional Fault Structures and Mineralization

Winter Drilling Program Planned for Q1 2024

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Uranium Ltd. and Core Nickel Corp. Announce Closing of Spin-Out Plan of Arrangement

CanAlaska Uranium Ltd. and Core Nickel Corp. Announce Closing of Spin-Out Plan of Arrangement

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) ("CanAlaska" or the "Company") and Core Nickel Corp. ("Core Nickel") are pleased to announce that further to CanAlaska's press releases dated September 5, 2023 and October 26, 2023, the plan of arrangement spin-out transaction (the "Arrangement") has closed effective November 10, 2023 (the "Effective Date").

Completion of the Arrangement, as set forth in the arrangement agreement dated September 1, 2023 (the "Arrangement Agreement"), entered into between the CanAlaska and Core Nickel, was approved by the shareholders of CanAlaska (the "CanAlaska Shareholders") on October 25, 2023; by a Final Order granted by the Supreme Court of British Columbia on October 31, 2023, in accordance with Part 9 of the Business Corporations Act (British Columbia), and accepted by the TSX Venture Exchange (the "TSXV").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Baselode to Begin Bear Uranium Project Drill Program and Updates on Catharsis

Baselode to Begin Bear Uranium Project Drill Program and Updates on Catharsis

  • 1,500 metre inaugural Bear drill program scheduled to start in coming weeks
  • Catharsis drill program is complete, with results to be released when assays received

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to provide updates for its Bear ("Bear") and Catharsis ("Catharsis") uranium projects in the Athabasca Basin area, northern Saskatchewan (see Figure 1).

"This is an exciting time as we begin our inaugural drill exploration program on Bear. The geology looks compelling, with an apparent regional structure hosting uranium mineralization already being identified with historic drilling and overlapping geophysical gravity low anomalies associated with bends in EM conductors. A discovery at Bear would be fortuitous as it is located about 30 kilometres south of the Key Lake uranium mill, and 10 kilometres east of the Key Lake haul road.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Imperial to hold 2024 First Quarter Earnings Call

(TSE: IMO, NYSE American: IMO) Brad Corson, chairman, president and chief executive officer, and Peter Shaw, vice-president, investor relations, Imperial Oil Limited, will host a 2024 First Quarter Earnings Call on Friday, April 26, following the company's first quarter earnings release that morning. The event begins at 9 a.m. MT and will be accessible by webcast.

During the call, Mr. Corson will offer brief remarks prior to taking questions from Imperial's covering analysts.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

PrairieSky Royalty Announces Conference Call for Q1 2024 Results

PrairieSky will release its Q1 2024 results on Monday, April 22, 2024 after markets close. The news release detailing PrairieSky's Q1 2024 results will provide operating and financial information. Financial statements along with management's discussion and analysis will be available on PrairieSky's website at www.prairiesky.com and on SEDAR+ at www.sedarplus.com .

A conference call to discuss the results will be held for the investment community on Tuesday, April 23, 2023 beginning at 6:30 am MT (8:30 am ET). To participate in the conference call, you are asked to register at the link provided below. Details regarding the call will be provided to you upon registration.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the completion of its winter drill program at the Hook Lake Joint Venture at the Carter Corridor. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and lies on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"This year's drill program ended with a discovery of 0.9 metres of 0.29% U3O8, including 0.3 metres of 0.68% U3O8, associated with a major structure intersected by hole CRT24-10," said Scott Frostad, Vice President Exploration at Purepoint. "Encouragingly, the basement hosted uranium mineralization is within an altered breccia matrix that borders a 10 metre wide graphitic shear. All the 2024 holes intersected anomalous radioactivity and the results continue to show the extensive 20-kilometre conductive structural zone known as the Carter Corridor remains highly prospective for an economic uranium discovery."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHB F ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has commenced a comprehensive 2024 field campaign at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program will include a ground electromagnetic survey (ML-TEM), a ground gravity survey, and a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF) "Blue Sky" or the "Company") is pleased to announce that the Company has filed the NI 43-101 Technical Report (the "Report") supporting disclosure of the independent Preliminary Economic Assessment(" PEA") for the Ivana Deposit at the Company's 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province Argentina as reported on February 22 nd 2024 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×