Altiplano Discovers New Zone at Maria Luisa; Drills 10.50 Metres of 3.76 g/t Gold and 3.83% Copper

Altiplano Discovers New Zone at Maria Luisa; Drills 10.50 Metres of 3.76 g/t Gold and 3.83% Copper

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce a new discovery at the Maria Luisa Project (the "Project"), located 100 km north of La Serena within the Atacama region in Incahuasi, Chile. Drill hole 22MLDDH012 intersected 10.50 metres (m) of 3.76 grams per tonne (gt) gold (Au) and 3.83% copper (Cu), including 3.00 m of 2.30 gt Au and 8.26% Cu, and 4.50 m of 6.03 gt Au and 2.19% Cu; results are in Table 1. This drill hole was collared at the 867 m level of the current underground workings at Maria Luisa.

Program Highlights

  • Drill hole 22MLDDH012 is a new discovery north and west of historical underground workings. The area has never been historically drilled or mined, follow-up work is underway to delineate the scope and scale of this new discovery.
  • Rocks hosting high copper and high gold grades in 22MLDDH012 vary with depth (Table 1).
    • 1.00 m of 0.88 g/t Au and 2.36% Cu is from copper and iron oxide that is spatially associated with a fault gouge zone.
    • 10.50 m of 3.76 g/t Au and 3.83% Cu is associated with a silicified breccia zone characterized by blebby to massive copper sulphide (chalcopyrite) and disseminated pyrite.
    • At depth, 0.50 m of chalcopyrite-bearing intrusive returned 6.46% Cu.
  • Assay results are pending for four drill holes that intersected intervals similar in appearance to the high-grade breccia zone of 22MLDDH012 (Figures 1 and 2).
  • The Company has developed 410 metres of the NW-SE trending Maria Luisa Decline and is now approximately 23 metres from the projected initial target length. Cross cuts to the SW will intersect the vein system to support the proposed mining plan.
  • The decline advance also allows the Company to continue testing exploration targets from underground drilling (Figure 3).

Table 1: Drill results from hole 22MLDDH012

From (m)To (m)Interval* (m)Au (g/t)Cu (%)
22MLDDH01232.5533.551.000.882.36
and40.0550.5510.503.763.83
incl.40.0543.053.002.308.26
and incl.44.5549.054.506.032.19
and84.5585.050.500.016.46

 
*Intervals are core length; true width is currently unknown

Alastair McIntyre, President and CEO, commented, "We are very encouraged with the discovery of this new zone and the corresponding high-grade gold and copper assay results. The recent work at Maria Luisa has focused on developing our underground decline system while establishing strategic underground drill locations. This provides the opportunity to drill new targets efficiently to support exploration and potential mine development with the added advantage of expanding our understanding of the multi-vein system at Maria Luisa."

The copper-sulphide-rich breccia intersected in 22MLDDH012 differs from the well-known near surface oxide veins that have been historically mined at the Maria Luisa Project. Intensely silicified fragments within this breccia also indicate fracturing of an existing hydrothermal system (Figure 2). While the Company is still delineating the extent of the sulphide zone, there is indication that oxide and sulphide mineralization are influenced by a larger fault system. The decline advance enables access to and exploration of deeper, historically mined levels (Figure 1); the full extent of the gold -copper mineralized material mined in level 841 is unknown to the Company to-date. Underground drilling from the decline is planned to test the vertical continuity of structures and mineralization between the historically mined levels 858 and 841, and lateral continuity between historical mining and the new discovery in 22MLDDH012.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_001.jpg

Figure 1: Cross Section view of the decline progress (orange) at Maria Luisa, drill collar and traces, and mapped historically mined underground tunnels (red). The yellow star indicates the approximate depth of the core depicted in Figure 2.

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_001full.jpg

* The decision to commence underground exploration and development at the Maria Luisa site is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with this decision.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_002.jpg

Figure 2: Core photo of chalcopyrite-bearing breccia from drillhole 22MLDDH016 (assay pending).

To view an enhanced version of Figure 2, please visit:
https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_003.jpg

Figure 3: Underground Drill Station located at the 867 m level

To view an enhanced version of Figure 3, please visit:
https://images.newsfilecorp.com/files/4303/133182_0ccb614b54ba8947_003full.jpg

Altiplano has generated over US$9.86 million from the recovery and sale (after processing costs) of 4.47 million pounds of copper with an average grade of 1.78% Cu (2018 Q1-2022 Q2). Cash flow has been re-invested into equipment, underground drilling, expanding underground development at Farellon, enhancing ventilation to increase productivity and capacity, new underground development and exploration at Maria Luisa, and the commissioning of the El Peñón fit-for-purpose mill and flotation plant located 15 km from the Farellon site.

About Altiplano

Altiplano Metals is a growing gold, silver, and copper company focused on the Americas. The Company has a diversified portfolio of assets that include an operating copper/gold/iron mine, development near term producing gold/copper projects, and exploration land packages with district-scale potential. Altiplano is focused on creating long-term stakeholder value through developing safe and sustainable production, reinvesting into exploration, and pursuing acquisition opportunities to complement its existing portfolio. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value. Altiplano trades on the Toronto Venture Exchange trading under the symbol APN and the Frankfurt Exchange under the symbol A2JNFG.

John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed, and approved the technical contents of this document.

Altiplano is part of the Metals Group of companies, managed by an award-winning team of professionals who stand for technical excellence, painstaking project selection and uncompromising corporate governance, with a proven ability to capitalize on investment opportunities and deliver shareholder returns.

www.metalsgroup.com

ON BEHALF OF THE BOARD

/s/ "John Williamson"
Chairman

For further information, please contact:
Alastair McIntyre, CEO
alastairm@apnmentals.com
Tel: (416) 434 3799

Jeremy Yaseniuk, Director
jeremyy@apnmetals.com
Tel: (604) 773-1467

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. The is no current mineral resource at Maria Luisa and further exploration may or may not define a resource estimate (M. Dufresne, NI 43-101 Technical Report, February 10, 2017). In addition, a decision to commence underground exploration and development at the Maria Luisa site is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with this decision. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/133182

News Provided by Newsfile via QuoteMedia

APN:CA
The Conversation (0)
Altiplano Reports Assay Results From its Santa Beatriz Copper-Gold-Iron Project of up to 2.45 m at 3.65 %Cu; 0.29 g/t Au; and 26.97 %Fe

Altiplano Reports Assay Results From its Santa Beatriz Copper-Gold-Iron Project of up to 2.45 m at 3.65 %Cu; 0.29 g/t Au; and 26.97 %Fe

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on underground and surface channel sample results from the Santa Beatriz Copper-Gold-Iron Project. These sample results confirm high grade copper-gold mineralization in the Santa Beatriz vein complex. With this information, the Company will review the opportunity to develop Santa Beatriz for the potential to produce incremental Cu-Au-Fe mineralized material to support feed for the El Peñón mill plant. Currently, the mine has a 3,000 tonnemonth permit which can be increased to 5,000 tpm through application with the mining authorities. The Santa Beatriz Mine is located 2 kilometres (km) by road from the Company's existing operation at the Farellon Copper-Gold-Iron Mine and 13 kms from the El Peñón processing plant near La Serena, Chile. Santa Beatriz and Farellon are iron oxide copper-gold (IOCG) deposits located within the NNE-trending Chile's copper-rich IOCG belt that has been associated to the Atacama Fault zone.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Begins Mining Operations at the 326 m Level at Farellon

Altiplano Begins Mining Operations at the 326 m Level at Farellon

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report that a new production area has been established at the 326 m mining level at the Farellon copper-gold mine located near La Serena, Chile. Access to the 326 m level is part of the ongoing underground development of the Hugo Decline, used to access and extract copper-gold and iron material from Farellon.

Intersection of the 326 m mining level has been achieved through the advance of the Hugo Tunnel. This new level will provide opportunity to develop two new mining areas in the NE and SW directions where mining on the iron oxide copper gold vein structure has begun in these sub drift areas. This new access point will also provide opportunity mine the floors and roofs above on the 336 m and 344 m levels as part of the ongoing mining plan.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Reports Q1 2024 Operational Results at Farellon with 2.29% Copper Recovered in March

Altiplano Reports Q1 2024 Operational Results at Farellon with 2.29% Copper Recovered in March

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q1 2024 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile.

For the Q1 2024 period, the copper grade produced at Farellon was recorded at 1.74%, a reduction from 1.87% observed in Q4 2023. However, very good grades were recovered from the 326 m NE mining level in March 2024 where copper was produced with an average grade of 2.29%.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Reports Q4 2023 Operational Results at Farellon with Improved Cu Grade and Output

Altiplano Reports Q4 2023 Operational Results at Farellon with Improved Cu Grade and Output

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q4 2023 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile.

The Company extracted a total of 9,114 tonnes of mineralized Cu-Au material and processed 8,125 tonnes during Q4 2023 at Farellon. This represents a 12% and 13.6% increase respectively from the Q3 production and processing figures. Mine production in Q4 represented the highest quarterly production over the 2024-year period. Copper grade improved in Q4 to 1.87% representing an 8.7% increase from the 1.72% Cu recovered in Q3. Sales of 325,328 pounds of copper in 2023 Q4 generated approximately US$798,919 in revenue (after processing costs), an increase of 25% over the $639,458 revenue figure received in Q3 - an increase related mainly to processing higher Cu grade material.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Reports on Processing Updates with Production of Cu-Au and Iron Concentrates at El Penon

Altiplano Reports on Processing Updates with Production of Cu-Au and Iron Concentrates at El Penon

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the progress at the El Peñón processing facility located approximately 15 kms from the Farellon copper-gold mine, 35 kms south of La Serena, Chile.

As part of the ongoing optimization process at the processing facility, several refinements focusing on the milling and flotation processes have been completed for the crushing, milling, and flotation circuits. These adjustments were designed to improve the overall milling process efficiencies and resulted in enhanced productivity, together with increased production of concentrates while completing ongoing adjustments.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Industrial Minerals Limited

Maiden Mukinbudin Quartz Processing Testwork Achieves Premium HPQ Product

Industrial Minerals Ltd (ASX: IND or the Company) is pleased to announce that it has received results from High Purity Ǫuartz Processing Testwork1 completed by North Carolina State University’s Mineral Research Laboratory (“NCSU-MRL”).

Keep reading...Show less
Auric Mining (ASX:AWJ)

Quarterly Appendix 5B Cash Flow Report

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to release its Quarterly Cash Flow Report for the period ended June 30, 2024.

Keep reading...Show less
Auric Mining (ASX:AWJ)

Quarterly Activities Report 30 June 2024

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its activities during the 30 June 2024 Quarter.

Keep reading...Show less
Miramar Resources (ASX:M2R)

Quarterly Report - Quarter Ending in 30 June 2024

Miramar Resources Limited (ASX:M2R, Miramar or “the Company”) is pleased to provide a summary of activities completed during the Quarter ending 30 June 2024.

Keep reading...Show less
Auric Mining (ASX:AWJ)

Jeffreys Find Gold Mine Toll Milling of 150,000 Tonnes Commenced, Second 2024 Campaign

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce the second gold milling campaign for 2024 of 150,000 dry metric tonnes from the Jeffreys Find Gold Mine (the Project) near Norseman, WA, commenced on 24 July 2024.

Keep reading...Show less
Alice Queen Limited

Viani - Low Sulphidation Epithermal Gold Project License Renewed

Advanced gold and copper explorer, Alice Queen Limited (ASX:AQX) (Alice Queen or the Company), is pleased to advise that it has received notification from the Mineral Resources Department (MRD) of Fiji that its highly prospective low sulphidation epithermal (LSE) gold project, Viani (SPL1513) located on the Pacific Rim of Fire, on Fiji’s second biggest island Vanua Levu, has been renewed for a further three years, commencing on 3 July 2024.

Keep reading...Show less

Latest Press Releases

Related News

×